ADSP-TS101 is a high performance DSP with good properties of parallel processing and high speed.According to the real-time processing requirements of underwater acoustic communication algorithms,a real-time parallel p...ADSP-TS101 is a high performance DSP with good properties of parallel processing and high speed.According to the real-time processing requirements of underwater acoustic communication algorithms,a real-time parallel processing system with multi-channel synchronous sample,which is composed of multiple ADSP-TS101s,is designed and carried out.For the hardware design,field programmable gate array(FPGA)logical control is adopted for the design of multi-channel synchronous sample module and cluster/data flow associated pin connection mode is adopted for multiprocessing parallel processing configuration respectively.And the software is optimized by two kinds of communication ways:broadcast writing way through shared bus and point-to-point way through link ports.Through the whole system installation,connective debugging,and experiments in a lake,the results show that the real-time parallel processing system has good stability and real-time processing capability and meets the technical design requirements of real-time processing.展开更多
It is acknowledged that lacking of interdisciplinary communication amongst designers can result in poor coordination performance in building design. Viewing communication as information processing activity, this paper...It is acknowledged that lacking of interdisciplinary communication amongst designers can result in poor coordination performance in building design. Viewing communication as information processing activity, this paper aims to explore the relationship between interdisciplinary information processing (IP) and design coordination performance. Both amount and quality are concerned regarding information processing. 698 project based samples are collected by questionnaire survey from design institutes in China's Mainland. Statistical data analysis shows that the relationship between information processing amount and design coordination performance follows a nonlinear exponential expression: performance = 3.691 (1-0.235IP amount) rather than reverted U curve. It implies that design period is too short to allow information overload. It indicates that the main problem in interdisciplinary communication in design institute in China is insufficient information. In additional, it is found the correlation between IP quality and coordination process performance is much stronger than that between IP amount and coordination process performance. For practitioners, it reminds design mangers to pay more attention to information processing quality rather than amount.展开更多
This paper discusses a pattern design system in textile industry,the establishment of an imagedatabase which is used to store various kinds of source materials for designers’ reference in order tospeed up design proc...This paper discusses a pattern design system in textile industry,the establishment of an imagedatabase which is used to store various kinds of source materials for designers’ reference in order tospeed up design process.Pattern design image database (PDIDB) runs on the double-machine hardware system com-posed of ALTOS-986 and IBM PC/XT microcomputer.The former (host) manages imagedatabase,and the latter works both as a terminal to operate PDIDB and as an image processingstation to input,output,edit and display image data.PDIDB has two mainparts,the image storage management system and the image attributemanagement system and provides some functions,such as retrieval,deleting and updating.展开更多
An optimal design of wastewater reuse for a University is concerned in this paper. The raw water and the capacity of wastewater reuse were determined according to the wastewater characteristic of a university; the tre...An optimal design of wastewater reuse for a University is concerned in this paper. The raw water and the capacity of wastewater reuse were determined according to the wastewater characteristic of a university; the treatment process was chosen by building a cost-benefit model; and the modeling test was performed about the operation effect of the proposed project and the recommended water quality of reclaimed water. It is estimated that 3.4×10^5 m^3/a tap water and 6.1×10^5 Yuan/a will be saved if the project was put into operation and the proposed project will reduce the total quantity of pollutant efficiently and bring lots of social and economic benefits.展开更多
This work develops a heuristic method for the design of batch water-using networks of multiple contaminants with regeneration unit based on the concepts of concentration potential. A water-using network involving rege...This work develops a heuristic method for the design of batch water-using networks of multiple contaminants with regeneration unit based on the concepts of concentration potential. A water-using network involving regeneration unit can be formed by adding the regenerated stream(s) into the network involving reuse only. In the design procedure of the network operated in a single batch mode, time is take n as the primary factor a nd con centration potentials as the secondary one. For the networks operated in a repeated mode, the design procedure is similar to that for continuous processes, besides designing the storage tanks with the rules proposed. Continuous regeneration unit is selected in this work. With the proposed method, the network structure corresponding to the minimum freshwater consumption can be obtained. It is shown that the method proposed in this article is simple, effective and has clear engineering meaning.展开更多
The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, buildi...The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, building information <span>modeling (BIM) and building energy modeling (BEM) are two important to</span>ols to make the transition to net-zero energy buildings (NZEB). So far, little attention has been devoted, in the literature, to discuss the connection between BIM, BEM, and Life-cycle assessment (LCA), which is the main topic of this article. A literature review of 157 journal articles and conference proceedings published between 1990 and 2020 is presented. This review outlines knowledge gaps concerning BIM, BEM, and environmental impact assessment. It suggests that defining the process with the right technology (at the right time) would result in a more integrated design process (IDP) and bridge current gaps. The most efficient way to improve process and technology is related to the competences of the architects, engineers and constructors (AEC). The review also indicates that the IDP in the early design phases (EDP) is in need of improvement for architects and engineers, where a better connection between design phases, specific levels of development (LOD) and BIM tools is needed. <span>Competences, process and technology are the three main themes addressed in the review. Their relation to design phases and LOD is discussed. The aim </span>is to propose possible solutions to the current hinders in BIM-to-BEM (BIM2BEM) and BIM-for-LCA (BIM4LCA) integration.展开更多
Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through dat...Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through data acquisition, instrument measurement and control,wireless network, water quantity, water pressure and other on-line monitoring equipment. The water supply system is formed, and the informationof mass water supply system is analyzed and processed in a timely manner. The system manages the entire production, management and serviceprocesses of the water supply system in a dynamic manner in order to ensure water supply safety management, and realize the modernization,intelligence and information mode operation of the water supply system in the mining area.展开更多
The work presents a parametric analysis of the performance of a solar-driven thermoelectric system to dehumidify air and produce fresh water. The system is combined with a solar distiller humidifying ambient air to en...The work presents a parametric analysis of the performance of a solar-driven thermoelectric system to dehumidify air and produce fresh water. The system is combined with a solar distiller humidifying ambient air to enhance distillate output to meet the specified fresh water needs for a residential application. The presented system is a totally renewable energy-based system taking advantage of the clean solar energy. A model is developed to simulate the air dehumidification process using TEC (thermoelectrically cooled) channels. An optimization problem for setting system operational parameters is formulated to meet the fresh water requirement of 10 liters per day for a typical residential application in the Lebanese coastal humid climate. Using five TEC channels of length of 1.2 m and area of 0.07 - 0.05 m^2 integrated with 1.2 m^2 solar distiller is capable of meeting the water demand, where the air mass flow rate introduced to each TEC channel is optimally set at 0.0155 kg/s. The optimal electrical current input to the TEC modules from the photovoltaic solar panels varied depending on the month and is set at 2.2 A in June, 2.1 A in July and 2.0 A in August, September and October per each TEC module.展开更多
基金Sponsored by National Natural Science Foundation of China(60572098)
文摘ADSP-TS101 is a high performance DSP with good properties of parallel processing and high speed.According to the real-time processing requirements of underwater acoustic communication algorithms,a real-time parallel processing system with multi-channel synchronous sample,which is composed of multiple ADSP-TS101s,is designed and carried out.For the hardware design,field programmable gate array(FPGA)logical control is adopted for the design of multi-channel synchronous sample module and cluster/data flow associated pin connection mode is adopted for multiprocessing parallel processing configuration respectively.And the software is optimized by two kinds of communication ways:broadcast writing way through shared bus and point-to-point way through link ports.Through the whole system installation,connective debugging,and experiments in a lake,the results show that the real-time parallel processing system has good stability and real-time processing capability and meets the technical design requirements of real-time processing.
文摘It is acknowledged that lacking of interdisciplinary communication amongst designers can result in poor coordination performance in building design. Viewing communication as information processing activity, this paper aims to explore the relationship between interdisciplinary information processing (IP) and design coordination performance. Both amount and quality are concerned regarding information processing. 698 project based samples are collected by questionnaire survey from design institutes in China's Mainland. Statistical data analysis shows that the relationship between information processing amount and design coordination performance follows a nonlinear exponential expression: performance = 3.691 (1-0.235IP amount) rather than reverted U curve. It implies that design period is too short to allow information overload. It indicates that the main problem in interdisciplinary communication in design institute in China is insufficient information. In additional, it is found the correlation between IP quality and coordination process performance is much stronger than that between IP amount and coordination process performance. For practitioners, it reminds design mangers to pay more attention to information processing quality rather than amount.
文摘This paper discusses a pattern design system in textile industry,the establishment of an imagedatabase which is used to store various kinds of source materials for designers’ reference in order tospeed up design process.Pattern design image database (PDIDB) runs on the double-machine hardware system com-posed of ALTOS-986 and IBM PC/XT microcomputer.The former (host) manages imagedatabase,and the latter works both as a terminal to operate PDIDB and as an image processingstation to input,output,edit and display image data.PDIDB has two mainparts,the image storage management system and the image attributemanagement system and provides some functions,such as retrieval,deleting and updating.
文摘An optimal design of wastewater reuse for a University is concerned in this paper. The raw water and the capacity of wastewater reuse were determined according to the wastewater characteristic of a university; the treatment process was chosen by building a cost-benefit model; and the modeling test was performed about the operation effect of the proposed project and the recommended water quality of reclaimed water. It is estimated that 3.4×10^5 m^3/a tap water and 6.1×10^5 Yuan/a will be saved if the project was put into operation and the proposed project will reduce the total quantity of pollutant efficiently and bring lots of social and economic benefits.
基金Supported by the Natural Science Foundation of Hebei Province(B2017202073)the Foundation of Educational Commission of Hebei Province(Z2017032)
文摘This work develops a heuristic method for the design of batch water-using networks of multiple contaminants with regeneration unit based on the concepts of concentration potential. A water-using network involving regeneration unit can be formed by adding the regenerated stream(s) into the network involving reuse only. In the design procedure of the network operated in a single batch mode, time is take n as the primary factor a nd con centration potentials as the secondary one. For the networks operated in a repeated mode, the design procedure is similar to that for continuous processes, besides designing the storage tanks with the rules proposed. Continuous regeneration unit is selected in this work. With the proposed method, the network structure corresponding to the minimum freshwater consumption can be obtained. It is shown that the method proposed in this article is simple, effective and has clear engineering meaning.
文摘The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, building information <span>modeling (BIM) and building energy modeling (BEM) are two important to</span>ols to make the transition to net-zero energy buildings (NZEB). So far, little attention has been devoted, in the literature, to discuss the connection between BIM, BEM, and Life-cycle assessment (LCA), which is the main topic of this article. A literature review of 157 journal articles and conference proceedings published between 1990 and 2020 is presented. This review outlines knowledge gaps concerning BIM, BEM, and environmental impact assessment. It suggests that defining the process with the right technology (at the right time) would result in a more integrated design process (IDP) and bridge current gaps. The most efficient way to improve process and technology is related to the competences of the architects, engineers and constructors (AEC). The review also indicates that the IDP in the early design phases (EDP) is in need of improvement for architects and engineers, where a better connection between design phases, specific levels of development (LOD) and BIM tools is needed. <span>Competences, process and technology are the three main themes addressed in the review. Their relation to design phases and LOD is discussed. The aim </span>is to propose possible solutions to the current hinders in BIM-to-BEM (BIM2BEM) and BIM-for-LCA (BIM4LCA) integration.
文摘Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through data acquisition, instrument measurement and control,wireless network, water quantity, water pressure and other on-line monitoring equipment. The water supply system is formed, and the informationof mass water supply system is analyzed and processed in a timely manner. The system manages the entire production, management and serviceprocesses of the water supply system in a dynamic manner in order to ensure water supply safety management, and realize the modernization,intelligence and information mode operation of the water supply system in the mining area.
文摘The work presents a parametric analysis of the performance of a solar-driven thermoelectric system to dehumidify air and produce fresh water. The system is combined with a solar distiller humidifying ambient air to enhance distillate output to meet the specified fresh water needs for a residential application. The presented system is a totally renewable energy-based system taking advantage of the clean solar energy. A model is developed to simulate the air dehumidification process using TEC (thermoelectrically cooled) channels. An optimization problem for setting system operational parameters is formulated to meet the fresh water requirement of 10 liters per day for a typical residential application in the Lebanese coastal humid climate. Using five TEC channels of length of 1.2 m and area of 0.07 - 0.05 m^2 integrated with 1.2 m^2 solar distiller is capable of meeting the water demand, where the air mass flow rate introduced to each TEC channel is optimally set at 0.0155 kg/s. The optimal electrical current input to the TEC modules from the photovoltaic solar panels varied depending on the month and is set at 2.2 A in June, 2.1 A in July and 2.0 A in August, September and October per each TEC module.