期刊文献+
共找到165篇文章
< 1 2 9 >
每页显示 20 50 100
Risk Prediction of Tunnel Water and Mud Inrush Based on Decision-Level Fusion of Multisource Data 被引量:1
1
作者 Shi-shu Zhang Peng Wang +4 位作者 Hua-bo Xiao Huai-bing Wang Yi-guo Xue Wei-dong Chen Kai Zhang 《Applied Geophysics》 2025年第2期472-487,559,560,共18页
This paper addresses the accuracy and timeliness limitations of traditional comprehensive prediction methods by proposing an approach of decision-level fusion of multisource data.A risk prediction indicator system was... This paper addresses the accuracy and timeliness limitations of traditional comprehensive prediction methods by proposing an approach of decision-level fusion of multisource data.A risk prediction indicator system was established for water and mud inrush in tunnels by analyzing advanced prediction data for specifi c tunnel segments.Additionally,the indicator weights were determined using the analytic hierarchy process combined with the Huber weighting method.Subsequently,a multisource data decision-layer fusion algorithm was utilized to generate fused imaging results for tunnel water and mud inrush risk predictions.Meanwhile,risk analysis was performed for different tunnel sections to achieve spatial and temporal complementarity within the indicator system and optimize redundant information.Finally,model feasibility was validated using the CZ Project Sejila Mountain Tunnel segment as a case study,yielding favorable risk prediction results and enabling effi cient information fusion and support for construction decision-making. 展开更多
关键词 Tunnel water and mud inrush prediction methods risk indicators multisource data decision-level fusion
在线阅读 下载PDF
Catastrophe theory-based risk evaluation model for water and mud inrush and its application in karst tunnels 被引量:24
2
作者 ZHU Jian-qun LI Tian-zheng 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第5期1587-1598,共12页
This paper presents a risk evaluation model of water and mud inrush for tunnel excavation in karst areas.The factors affecting the probabilities of water and mud inrush in karst tunnels are investigated to define the ... This paper presents a risk evaluation model of water and mud inrush for tunnel excavation in karst areas.The factors affecting the probabilities of water and mud inrush in karst tunnels are investigated to define the dangerousness of this geological disaster.The losses that are caused by water and mud inrush are taken into consideration to account for its harmfulness.Then a risk evaluation model based on the dangerousness-harmfulness evaluation indicator system is constructed,which is more convincing in comparison with the traditional methods.The catastrophe theory is used to evaluate the risk level of water and mud inrush and it has great advantage in handling problems involving discontinuous catastrophe processes.To validate the proposed approach,the Qiyueshan tunnel of Yichang-Wanzhou Railway is taken as an example in which four target segments are evaluated using the risk evaluation model.Finally,the evaluation results are compared with the excavation data,which shows that the risk levels predicted by the proposed approach are in good agreements with that observed in engineering.In conclusion,the catastrophe theory-based risk evaluation model is an efficient and effective approach for water and mud inrush in karst tunnels. 展开更多
关键词 risk evaluation model water and mud inrush catastrophe theory karst area TUNNELING
在线阅读 下载PDF
Prevention and treatment technologies of railway tunnel water inrush and mud gushing in China 被引量:22
3
作者 Yong Zhao Pengfei Li Siming Tian 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第6期468-477,共10页
Water inrush and mud gushing are one of the biggest hazards in tunnel construction. Unfavorable geological sections can be observed in almost all railway tunnels under construction or to be constructed, and vary in ex... Water inrush and mud gushing are one of the biggest hazards in tunnel construction. Unfavorable geological sections can be observed in almost all railway tunnels under construction or to be constructed, and vary in extent. Furthermore, due to the different heights of mountains and the lengths of tunnels, the locations of the unfavorable geological sections cannot be fully determined before construction, which increases the risk of water inrush and mud gushing. Based on numerous cases of water inrush and mud gushing in railway tunnels, the paper tries to classify water inrush and mud gushing in railway tunnels in view of the conditions of the surrounding rocks and meteorological factors associated with tunnel excavation. In addition, the causes of water inrush and mud gushing in combination of macroand micromechanisms are summarized, and site-specifc treatment method is put forward. The treatment methods include choosing a method of advance geological forecast according to risk degrees of different sections in the tunnel, determining the items of predictions, and choosing the appropriate methods, i.e. draining-oriented method, blocking-oriented method or draining-and-blocking method. The treatment technologies of railway water inrush and mud gushing are also summarized, including energy relief and pressure relief technology, advance grouting technology, and advance jet grouting technology associated with their key technical features and applicable conditions. The results in terms of treatment methods can provide reference to the prevention and treatment of tunnel water inrush and mud gushing. 展开更多
关键词 Tunnel engineering Unfavorable geological regions water inrush and mud gushing Pressure relief technology Advance grouting technology Advance jet grouting
在线阅读 下载PDF
Formation mechanisms of water inrush and mud burst in a migmatite tunnel:a case study in China 被引量:8
4
作者 WU Guo-jun CHEN Wei-zhong +2 位作者 YUAN Jing-qiang YANG Dian-sen BIAN Han-bian 《Journal of Mountain Science》 SCIE CSCD 2017年第1期188-195,共8页
This paper presents a case study of water inrush and mud burst occurring in a migmatite tunnel to study its formation mechanisms. The geological investigation and mineralogical analysis showed that water inrush and mu... This paper presents a case study of water inrush and mud burst occurring in a migmatite tunnel to study its formation mechanisms. The geological investigation and mineralogical analysis showed that water inrush and mud burst in the migmatite was closely related to the component of the host rock. High content of soluble minerals,e.g.,calcite and dolomite,would make the migmatite rock prone to be fragmentized,isintegrated and eventually form different sorts of connected or semi-connected veins. The field exploration revealed most cavities in the magmatite tunnel were eroded by groundwater and formed large interconnected networks. The two faults and the dike in the magmatite tunnel became the preferred paths and provided great convenience for plenty of precipitation and mud slurry. Due to high water pressure and blast disturbance,the cavities can soon connect each other as well as all sorts of veins,forming a complex ground channel for water inrush and mud burst. To estimate the potential occurrenceof water inrush and mud burst,the water bursting coefficient was employed. The results showed the water bursting coefficient of the magmatite tunnel was much bigger than the threshold values and it can be used to explain the accident of water inrush and mud burst occurring in the magmatite tunnel. 展开更多
关键词 water inrush mud burst Migmatite Formation mechanism Tunnel
原文传递
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
5
作者 WANG Yawei 《Global Geology》 2019年第3期167-178,共12页
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surroun... Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency. 展开更多
关键词 mud and water inrush geological model Xiangyun TUNNEL Guangtong-Dali RAILWAY STRUCTURAL mechanism construction method
在线阅读 下载PDF
Treatment Design and Construction Strategy for Tunnel Mud and Water Inrush Disaster
6
作者 Yike Wei Lingfeng Yu 《Journal of Architectural Research and Development》 2021年第2期52-54,共3页
With the rapid development of the transportation industry in China,the number and scale of tunnel construction are increasing.Tunneling through fault zones and other complex geological environments is becoming more an... With the rapid development of the transportation industry in China,the number and scale of tunnel construction are increasing.Tunneling through fault zones and other complex geological environments is becoming more and more common.In the construction of highway tunnels,due to the special geographical environment and complex geological conditions,mud and water inrush often occur in the tunnel.Water inrush disasters pose a major risk to the construction of highway tunnels and affect the normal construction of highway tunnels.This paper combines the engineering background of the tunnel mud and water inrush accidents,carries out evaluation on the accident treatment measures and the treatment efficiency,and summarizes the main concerns in the construction process and the technical guidelines for dealing with the tunnel mud and water inrush. 展开更多
关键词 TUNNEL mud and water inrush Disaster treatment Construction strategy
在线阅读 下载PDF
深埋隧道穿越富水断层破碎带突水突泥灾变演化规律研究
7
作者 郭延辉 李顺银 +3 位作者 严航 郑磊 李小强 焦昊 《地质科技通报》 北大核心 2026年第1期160-170,共11页
富水断层破碎带的存在对隧道突水突泥的发生有着较大的影响。为研究深埋隧道穿越富水断层破碎带时引起的突水突泥灾变演化规律,基于筒仓模型和极限平衡理论,考虑断层破碎带的宽度、长度和倾角,建立隧道穿越富水断层破碎带的隔水岩体力... 富水断层破碎带的存在对隧道突水突泥的发生有着较大的影响。为研究深埋隧道穿越富水断层破碎带时引起的突水突泥灾变演化规律,基于筒仓模型和极限平衡理论,考虑断层破碎带的宽度、长度和倾角,建立隧道穿越富水断层破碎带的隔水岩体力学模型,推导隔水岩体最小安全厚度的力学判据;通过MIDAS GTS NX数值模拟仿真,建立三维流固耦合数值模型,分析隧道开挖至断层破碎带内部时的位移、应力、孔隙水压力和渗流流速演化规律。结果表明:隔水岩体的最小安全厚度主要与断层破碎带长度、宽度、倾角、隧道埋深以及隔水岩体自身的力学性质有关;隧道开挖至断层后,其内部位移显著增大,最大主应力和最小主应力都存在明显的突变;低孔隙水压力区范围显著增大,孔隙水压力表现出先缓慢减小,后急剧减小,再逐渐趋于稳定的变化趋势;在断层内部出现了流速高值区,整个模型流速出现增大趋势,开挖过程中掌子面的最大流速整体呈现先增大后减小的变化趋势。该研究可为断层破碎带突水突泥灾害的预防提供相关参考。 展开更多
关键词 深埋隧道 突水突泥 断层破碎带 隔水岩体 MIDAS GTS NX
在线阅读 下载PDF
软弱围岩隧道突水涌泥安全风险及处治措施
8
作者 高养育 《凿岩机械气动工具》 2026年第1期220-222,共3页
隧道工程在路网建设中占据重要地位,在复杂多变的地质环境中进行隧道施工时,突水涌泥现象时有发生。此类灾害处治难度大,破坏性强,已成为制约工程安全推进的主要风险之一。以青海省加西公路3标摩天岭1号隧道为研究对象,以其在软弱地质... 隧道工程在路网建设中占据重要地位,在复杂多变的地质环境中进行隧道施工时,突水涌泥现象时有发生。此类灾害处治难度大,破坏性强,已成为制约工程安全推进的主要风险之一。以青海省加西公路3标摩天岭1号隧道为研究对象,以其在软弱地质条件下的施工实践为依托,聚焦突水涌泥灾害处治技术,进行系统性的安全风险评估,最终构建了一套集排水减压、注浆加固与强化支护于一体的综合性处治体系,可为类似地质条件下的隧道建设提供参考。 展开更多
关键词 软弱围岩隧道 突水涌泥 洞内排水 超前加固
在线阅读 下载PDF
强砂化白云岩地层隧道水平旋喷桩应用分析 被引量:2
9
作者 陈雪锋 《石家庄铁路职业技术学院学报》 2025年第1期1-5,共5页
针对梁王山特长隧道下穿富水强砂化白云岩地层所发生的涌水突泥灾害处治难题,在理论分析、数值模拟的基础上,采用水平旋喷桩预加固技术封堵溃口、改良地层。结果表明:在不采取超前地层预加固的前提下,洞周地层无自稳能力,坍塌规模将持... 针对梁王山特长隧道下穿富水强砂化白云岩地层所发生的涌水突泥灾害处治难题,在理论分析、数值模拟的基础上,采用水平旋喷桩预加固技术封堵溃口、改良地层。结果表明:在不采取超前地层预加固的前提下,洞周地层无自稳能力,坍塌规模将持续加大;水平旋喷桩在强砂化白云岩地层具有良好的适应性,成桩直径、桩体连续性、桩身强度均有保证;水平旋喷桩对涌水突泥的溃口封堵、变形控制效果显著,可将初期支护的拱顶沉降、水平收敛值降低62.04%、71.23%。 展开更多
关键词 砂化白云岩 涌水突泥 溃口封堵 水平旋喷桩
在线阅读 下载PDF
山岭隧道时滞型突水突泥机理及防控措施研究
10
作者 林之恒 张广泽 袁东 《铁道工程学报》 北大核心 2025年第8期67-71,共5页
研究目的:随着西部复杂地质条件下隧道工程不断推进,山岭隧道施工面临突水突泥问题越发频繁严重,其中具有显著突发性与时滞型特征的突涌灾害因发灾时空不确定性,成为施工安全管控的难点。本文通过分析总结近年来山岭隧道发生的时滞型突... 研究目的:随着西部复杂地质条件下隧道工程不断推进,山岭隧道施工面临突水突泥问题越发频繁严重,其中具有显著突发性与时滞型特征的突涌灾害因发灾时空不确定性,成为施工安全管控的难点。本文通过分析总结近年来山岭隧道发生的时滞型突水突泥灾害事件的孕灾环境和过程机理,提出时滞型突水突泥的定义、分类、探测与预报技术,以期指导现场施工风险判识和防控,形成一套成熟可靠的防控技术。研究结论:(1)结合时滞型突水突泥时空特征,可划分为涌水-管涌型、流土-塌方型和复合型三大类;(2)时滞型突水突泥诱发地段通常表现为地表负地形、构造破碎带、物探低阻异常区、最大主应力与负地形或构造呈小夹角的孕灾环境特征;(3)基于围岩破碎程度、出水状态、初支施作情况和施工掉块或塌方影响因素,建立了时滞型突水突泥风险发生等级及概率的半定量评价方法,将时滞型突水突泥风险发生等级划分为Ⅰ级、Ⅱ级和Ⅲ级;(4)时滞型突水突泥风险防控应按照“宁强勿弱,一次通过”原则,通过加大探测范围、长距离提前泄水降压、提前分级强化施工措施和分级控制减小灾变风险;(5)本研究成果可为类似复杂地质环境下时滞型突水突泥预测和防控提供借鉴。 展开更多
关键词 山岭隧道 时滞型突水突泥 过程机制 孕灾环境 风险判识 防控措施
在线阅读 下载PDF
隧道突泥涌水致灾机理及防控技术研究 被引量:2
11
作者 秦鹏飞 赵亚敏 +1 位作者 宋梦 王文菁 《中国岩溶》 北大核心 2025年第2期359-369,共11页
隧道突水灾害具有“大流量、强突发、高水压、多类型”等特点,是多尺度、多物理场耦合的复杂灾害现象,分析不良地质构造特征、发育形态及水压作用下的破坏趋势,有利于深刻揭示突泥涌水致灾机理。文中从灾害水源、水流补给通道及隔水岩... 隧道突水灾害具有“大流量、强突发、高水压、多类型”等特点,是多尺度、多物理场耦合的复杂灾害现象,分析不良地质构造特征、发育形态及水压作用下的破坏趋势,有利于深刻揭示突泥涌水致灾机理。文中从灾害水源、水流补给通道及隔水岩体三者性能状态演变着手,分析了突泥涌水的动力灾变过程,并基于弹性力学、断裂力学和工程水力学理论,探讨了压剪、拉剪型破坏的致灾机理。将隧道掘进面与灾害水源间的岩层,分作隧道开挖引起的应力松弛区、完整岩体保护区及裂隙带区3个区域,提出了突泥涌水的有效保护厚度。最后从注浆理论、注浆材料等方面阐释了灾害防控的技术措施,以期对保障隧道施工安全起到一定借鉴作用。 展开更多
关键词 深埋隧道 突泥涌水 工程灾害 注浆技术 防控研究
在线阅读 下载PDF
铁路隧道不良地质判识方法研究 被引量:1
12
作者 许广春 刘伟 +1 位作者 张凤凯 宋树宝 《铁道工程学报》 北大核心 2025年第7期19-25,共7页
研究目的:在隧道开挖过程中,增强对不良地质的超前判识和综合预测具有重要的工程指导意义。基于宏观地质与水文地质分析,本文研究隧道不良地质风险判识方法,聚焦高地应力下岩爆、突泥涌水、软岩变形、高温热害等问题划分风险等级,并以... 研究目的:在隧道开挖过程中,增强对不良地质的超前判识和综合预测具有重要的工程指导意义。基于宏观地质与水文地质分析,本文研究隧道不良地质风险判识方法,聚焦高地应力下岩爆、突泥涌水、软岩变形、高温热害等问题划分风险等级,并以高温热害预报为例验证方法准确性。研究结论:(1)超前地质预报需加强宏观地质和水文地质分析,注重地面与洞内结合、物探与钻探结合、不同物探方法的结合、长短距离预报的结合,本文建立的不良地质判识方法具有创新性和科学性;(2)单一预报方法是“盲人摸象”,只能揭示局部地质情况,运用综合预报手段可加深对不良地质的全面认识,减少多解性,实际使用中不能将多个异常简单叠加,需注意各方法对地质问题的敏感性;(3)超前地质预报是施工安全的重要保障,采用有效风险判识方法有助于防范各类事故,须纳入施工工序管理;(4)本文研究可为隧道不良地质的超前判识和类似工程提供借鉴。 展开更多
关键词 铁路隧道 岩爆 突泥涌水 大变形 高地温 判识方法
在线阅读 下载PDF
高黎贡山隧道TBM穿越高压富水花岗岩蚀变带综合处理技术研究
13
作者 张旭彬 杨昌宇 +1 位作者 宋智来 王唤龙 《铁道标准设计》 北大核心 2025年第10期265-273,共9页
TBM施工隧道效率高且安全度高,在多个工程领域都有广泛应用。但TBM遭遇不良地质时受困风险大、处理难度高,TBM隧道不良地质处理也是工程实践中面临的棘手难题。大瑞铁路高黎贡山隧道出口工区TBM施工遭遇多段大规模高压富水花岗岩蚀变带... TBM施工隧道效率高且安全度高,在多个工程领域都有广泛应用。但TBM遭遇不良地质时受困风险大、处理难度高,TBM隧道不良地质处理也是工程实践中面临的棘手难题。大瑞铁路高黎贡山隧道出口工区TBM施工遭遇多段大规模高压富水花岗岩蚀变带,地质条件极为复杂,为解决高黎贡山隧道穿越高压富水花岗岩蚀变带时面临的渗透失稳、围岩强度劣化及TBM卡机等灾变难题,通过分析高压富水花岗岩蚀变带灾变现象及成因,提出“地质预判-围岩改性-结构协同”三位一体的隧道建造技术体系,形成超前地质预报动态识别、钻爆法迂回导坑“诱突”、蚀变带围岩改性加固及支护结构参数优化等关键技术集成的综合施工方案,成功处理并通过前方大规模高压富水花岗岩蚀变带。研究结果表明:(1)高压富水花岗岩蚀变带围岩极破碎,极易造成TBM卡机,地下水的作用会导致蚀变带发生渗透失稳,造成突泥涌水灾害;(2)多次超前实施迂回导坑主动“诱突”后起到泄水释能降压的作用,确保正洞和平导突泥涌水风险显著降低;(3)通过超前地质预报综合判识、蚀变带围岩改性加固、衬砌结构参数优化等蚀变带建造措施,实现TBM安全通过蚀变带高风险区段。研究成果可为深埋隧道穿越蚀变带提供灾变防控理论框架与建造技术路径。 展开更多
关键词 铁路隧道 敞开式TBM 高压富水花岗岩蚀变带 迂回导坑 突泥涌水
在线阅读 下载PDF
花岗岩地层风化蚀变型突水突泥灾害多阶段变权重风险评估模型研究
14
作者 丁帅 张德华 +2 位作者 苑博程 霍世琦 嵇逸飞 《铁道标准设计》 北大核心 2025年第10期209-219,共11页
花岗岩地层风化蚀变型突水突泥是西南地区深埋隧道富水岩体因风化蚀变引发的一种严重地质灾害。针对西南高原花岗岩风化蚀变型隧道突水突泥灾害,提出一种花岗岩地层风化蚀变型多阶段动态风险评估方法。通过分析灾害成因机制,基于变权理... 花岗岩地层风化蚀变型突水突泥是西南地区深埋隧道富水岩体因风化蚀变引发的一种严重地质灾害。针对西南高原花岗岩风化蚀变型隧道突水突泥灾害,提出一种花岗岩地层风化蚀变型多阶段动态风险评估方法。通过分析灾害成因机制,基于变权理论构建强激励-弱惩罚型状态变权向量函数,建立融合权重动态响应的风险评估模型。结合西南地区某隧道工程实例,验证表明,模型较传统固定权重方法更能确预测花岗岩风化蚀变型隧道突水突泥灾害,有效解决静态评价导致的“伪安全”问题。研究揭示高海拔风化蚀变地层的突水突泥致灾规律,为复杂地质条件下隧道安全施工提供理论工具与实践范式。该隧道2号斜井突水突泥风险等级应用验证结果表明,突水突泥动态风险评估模型准确率为88%。 展开更多
关键词 隧道工程 风化蚀变型 突水突泥灾害 变权重理论 多阶段风险评估
在线阅读 下载PDF
复合地层隧道突涌水灾害机理及治理研究 被引量:1
15
作者 康与超 王青松 《北方交通》 2025年第1期91-94,共4页
青岛地区地质条件较为复杂,隧道施工过程中常常会受到富水砂层和破碎带等影响。文章以青岛地铁静沙区间隧道工程为研究案例,针对该隧道突涌水灾害和由此引起的地面坍塌问题,建立有限元模型,对富水复合地层隧道施工进行分析,研究隧道的... 青岛地区地质条件较为复杂,隧道施工过程中常常会受到富水砂层和破碎带等影响。文章以青岛地铁静沙区间隧道工程为研究案例,针对该隧道突涌水灾害和由此引起的地面坍塌问题,建立有限元模型,对富水复合地层隧道施工进行分析,研究隧道的围岩应力和孔隙水压力变化情况。结合现场情况和数值模拟结果,分析该隧道突涌水的成因并提出治理措施。 展开更多
关键词 隧道 富水地层 突水突泥 数值模拟 灾害治理
在线阅读 下载PDF
隧道突水突泥治理用高分子注浆材料的研究进展
16
作者 余华鹏 丁燕平 《合成材料老化与应用》 2025年第6期90-93,共4页
在隧道工程中,突水突泥灾害频发,严重威胁施工安全与工程质量。高分子注浆材料因其快速反应、高渗透性、性能可调等优点,逐渐成为替代传统水泥基材料的重要手段。该文系统梳理了高分子注浆材料在力学改性、快速封堵、地层加固及环保可... 在隧道工程中,突水突泥灾害频发,严重威胁施工安全与工程质量。高分子注浆材料因其快速反应、高渗透性、性能可调等优点,逐渐成为替代传统水泥基材料的重要手段。该文系统梳理了高分子注浆材料在力学改性、快速封堵、地层加固及环保可持续性等方面的研究进展,重点分析了其在复杂地质环境中的适应性与工程适用性。针对当前存在的高成本、环保性能与力学性能难以兼顾等问题,提出未来应从智能响应型材料、多尺度机制研究、绿色复合技术等方向突破,推动高效、安全、可持续的隧道灾害治理体系构建,旨在为相关材料研发与工程实践提供理论支持与技术参考。 展开更多
关键词 高分子注浆材料 突水突泥 力学改性 环保可持续
在线阅读 下载PDF
富水角砾岩地层隧道预防突水突泥的极限防突体厚度
17
作者 杨晓慧 《铁道建筑》 北大核心 2025年第8期112-118,共7页
为防止富水角砾岩地层隧道发生突水突泥灾害,依托重庆—遂宁高速公路复线缙云山隧道,开展模型试验和数值模拟研究,分析隧道突水突泥灾害特征和不同水头条件下的极限防突体厚度。结果表明:角砾岩地层隧道突水突泥灾害形成过程经历稳定→... 为防止富水角砾岩地层隧道发生突水突泥灾害,依托重庆—遂宁高速公路复线缙云山隧道,开展模型试验和数值模拟研究,分析隧道突水突泥灾害特征和不同水头条件下的极限防突体厚度。结果表明:角砾岩地层隧道突水突泥灾害形成过程经历稳定→渗流→破坏三个阶段,分别对应突水通道形成、贯通和灾害发生。突水突泥发生时,拱顶应力大于拱肩,拱顶先于拱肩破坏;拱顶渗透压力降幅最大,为25.3%。隧道开挖后,掌子面后方水压力下降最显著,下降范围随水头的升高而增大。水头高度为120~180 m时,通过数值模拟得到的极限防突体厚度为2.2~2.8 m,与模型试验结果相近,说明数值分析和模型试验结果均具有较高的准确性。 展开更多
关键词 公路隧道 富水角砾岩地层 防突体厚度 突水突泥 灾变特征 掌子面稳定性
在线阅读 下载PDF
云母石英片岩隧道塌方—涌水突泥链式灾害机理研究
18
作者 肜增湘 周琦 闵友维 《资源环境与工程》 2025年第6期737-743,共7页
隧道突涌水灾害具有成灾时间短、孕灾机理复杂、控灾难度大等特点,严重威胁隧道施工安全。为探究云母石英片岩软弱破碎围岩隧道大变形塌方并诱发涌水突泥灾害的复合孕灾机理,以通省隧道为研究对象,通过现场监测、室内试验和理论分析等手... 隧道突涌水灾害具有成灾时间短、孕灾机理复杂、控灾难度大等特点,严重威胁隧道施工安全。为探究云母石英片岩软弱破碎围岩隧道大变形塌方并诱发涌水突泥灾害的复合孕灾机理,以通省隧道为研究对象,通过现场监测、室内试验和理论分析等手段,系统揭示隧道突涌水灾害的形成演化机制。研究结果表明,软弱片岩地层中发生的隧道涌水突泥灾害具有突发性强、涌水量大、持续时间长等特点,并表现出多模式、多阶段的链式反应特征,易诱发次生灾害;突涌水灾害的形成是软弱围岩、富水环境和施工扰动叠加作用的结果,区域地质构造活动及沟谷地形组合形成了良好蓄水结构,片岩的水—岩耦合作用提供了丰富的能量和物质来源,爆破扰动和高构造应力环境为孕灾通道形成提供了重要动力条件;其灾变模式可表现为剪切变形破坏、渐进破坏涌水和渗透失稳突泥3个阶段。研究成果可为类似地层隧道突涌水灾害治理及安全防控提供参考。 展开更多
关键词 云母石英片岩 深埋隧道 塌方 涌水突泥 链式灾害
在线阅读 下载PDF
高承压水头地层的防渗加固施工方法
19
作者 刘铭涛 罗雷 甘泉 《中国水能及电气化》 2025年第10期7-11,共5页
文章以马城铁矿突水巷道、鄂北水资源调配工程宝林输水隧洞段为研究参考,对处理断层带穿越导致的突水突泥灾害的传统施工方法进行了优化,提出了深部高承压水防渗加固综合处理措施。采用该综合处理措施可有效解决有限空间内作业时设备灵... 文章以马城铁矿突水巷道、鄂北水资源调配工程宝林输水隧洞段为研究参考,对处理断层带穿越导致的突水突泥灾害的传统施工方法进行了优化,提出了深部高承压水防渗加固综合处理措施。采用该综合处理措施可有效解决有限空间内作业时设备灵活性以及高压水头下如何保证水泥浆扩散半径与注入量等问题,对相关工程施工具有重要的参考价值。 展开更多
关键词 深部矿井隧洞 断层带 突水突泥 止水帷幕
在线阅读 下载PDF
综合物探技术在输水隧洞涌水突泥灾害探测中的应用
20
作者 王子铭 廖天元 +1 位作者 米健 李靖 《物探化探计算技术》 2025年第3期393-401,共9页
笔者运用地面被动源面波勘探法和洞内TRT超前地质预报法对滇中引水工程某输水隧洞涌水突泥洞段进行综合物探勘察。利用直线型台阵快速、经济、高效的特点,采用扩展空间自相关法从微动信号中提取面波频散曲线,反演计算横波波速并绘制剖面... 笔者运用地面被动源面波勘探法和洞内TRT超前地质预报法对滇中引水工程某输水隧洞涌水突泥洞段进行综合物探勘察。利用直线型台阵快速、经济、高效的特点,采用扩展空间自相关法从微动信号中提取面波频散曲线,反演计算横波波速并绘制剖面图,对异常形态进行分析,再结合TRT超前地质预报成果开展精细化解释,准确探测出了隧洞前方涌水突泥堆积区及影响范围、富水破碎区等不良地质体的空间分布。结果表明,综合运用地面被动源面波勘探法和洞内TRT超前地质预报法对于探测输水隧洞不良地质体规模和空间分布具有良好效果,为后续工程设计及施工方案选择提供了可靠依据。 展开更多
关键词 滇中引水工程 被动源面波勘探法 超前地质预报 涌水突泥 输水隧洞
在线阅读 下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部