期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
Analyses on schedule-cost coefficient correlation of spaceflight project based on historical statistics and its application
1
作者 Liu Yanqiong Chen Yingwu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2006年第4期769-774,共6页
When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, consider... When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the in(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the in-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the in-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed. 展开更多
关键词 cost SCHEDULE correlation coefficient spaceflight project management risk.
在线阅读 下载PDF
Remarkable Achievements of China’s Manned Spaceflight Project
2
作者 Zong He 《Aerospace China》 2012年第3期8-9,共2页
On September 21,1992, the feasibility report on implementing China's Manned Spaceflight Project was approved and a three-step development strategy was also determined. From then on, China's Manned Spaceflight ... On September 21,1992, the feasibility report on implementing China's Manned Spaceflight Project was approved and a three-step development strategy was also determined. From then on, China's Manned Spaceflight Project has developed rapidly. 展开更多
关键词 s Manned spaceflight project Remarkable Achievements of China
在线阅读 下载PDF
Estimation Method of Schedule-cost Correlation Coefficient of Spaceflight Project
3
作者 Liu Yanqiong(Humanity and Social Science School,National University of Defence Technology,Changsha,410073,China) 《工程科学(英文版)》 2007年第3期69-75,共7页
To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU... To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU(the schedule distribution model considering the effect of the cost uncertainty),and then proposes the approximate formula to estimate the ln(S)-C correlation coefficient based on the models of SDMCU and CDMSU(the cost distribution model considering the effect of the schedule uncertainty).Furthermore,an approximate relationship expression of the S-C and the ln(S)-C correlation coefficients is put forward according to general facts and the Taylor expansion,and advanced by means of mass numerical validation is the general rule of obtaining the estimation value of the schedule-cost correlation coefficient based on the historical data. 展开更多
关键词 spaceflight project risk COST SCHEDULE CORRELATION COEFFICIENT
在线阅读 下载PDF
航天项目费用影响下的进度不确定性定量分析 被引量:4
4
作者 刘艳琼 陈英武 《系统工程与电子技术》 EI CSCD 北大核心 2006年第5期720-722,共3页
航天项目中费用与进度大致服从正态分布与对数正态分布,针对这一基本结论,给出了在费用不确定性的影响下,对进度不确定性进行定量分析的方法,推导了费用不确定性影响下的进度不确定性估算公式。该方法对于航天项目进度风险的分析与管理... 航天项目中费用与进度大致服从正态分布与对数正态分布,针对这一基本结论,给出了在费用不确定性的影响下,对进度不确定性进行定量分析的方法,推导了费用不确定性影响下的进度不确定性估算公式。该方法对于航天项目进度风险的分析与管理具有可操作性强的实用价值,便于预测费用影响下的进度风险,从而采取合理的措施。以某具体航天项目为例,分析了进度不确定性将如何随着费用的不确定性而发生变化,并进一步指出了进度不确定性的其它若干个可能的影响因素。 展开更多
关键词 风险 航天型号项目 进度分析 费用
在线阅读 下载PDF
阶梯式发展是实施工程活动的重要方式 被引量:1
5
作者 朱训 梁磊宁 雷新华 《工程研究(跨学科视野中的工程)》 CSCD 2013年第4期327-334,共8页
阶梯式发展是物质世界运动和人类认识运动的重要形式,是自然界、人类社会和日常生活中常见的一种形式,也广泛存在于工程活动之中。矿产勘查工程、载人航天工程、"蛟龙号"潜水工程和地面建筑工程为阶梯式发展提供了很好的例证... 阶梯式发展是物质世界运动和人类认识运动的重要形式,是自然界、人类社会和日常生活中常见的一种形式,也广泛存在于工程活动之中。矿产勘查工程、载人航天工程、"蛟龙号"潜水工程和地面建筑工程为阶梯式发展提供了很好的例证。遵循阶梯式发展规律是成功实施工程活动的前提和保证。 展开更多
关键词 阶梯式发展 工程活动 矿产勘查工程 载人航天工程 “蛟龙号”潜水工程
在线阅读 下载PDF
多中断辨识技术实验
6
作者 蔡文斋 王录选 《电子设计工程》 2009年第2期79-81,共3页
通过常用商用中断板卡编程实验,提出了多中断辨识技术,该方法部分来源于商用中断I/O板卡的驱动例子。使用调试通过的代码演示了目前最常用的中断处理技术,特别对多中断辨识技术给出了详细说明,希望该方法有助于未来开发者。
关键词 中断 线程 事件 监控软件 航天工程
在线阅读 下载PDF
航天器项目软件计划管理
7
作者 褚楠 王娟 《科技创新导报》 2014年第12期164-165,共2页
软件产品同硬件产品一样是航天器研制过程中必不可少的一个配置项,因此软件计划管理是航天器项目管理中一个重要的组成部分,是确保航天项目中软件产品按计划交付所必须的管理过程,在型号研制过程中发挥着关键的作用。
关键词 航天器 软件 计划管理
在线阅读 下载PDF
载人航天工程中的微生物科学与技术应用 被引量:6
8
作者 袁俊霞 印红 +1 位作者 马玲玲 徐侃彦 《载人航天》 CSCD 北大核心 2020年第2期237-243,共7页
针对微生物技术在人类长期载人航天任务中的应用需求,分析了微生物在空间环境下的生物学特性变化,探讨了当前国际空间站内微生物生态安全长期追踪分析的研究方法与进展,展望了微生物在载人航天工程以及深空探测中的原位资源开发应用的... 针对微生物技术在人类长期载人航天任务中的应用需求,分析了微生物在空间环境下的生物学特性变化,探讨了当前国际空间站内微生物生态安全长期追踪分析的研究方法与进展,展望了微生物在载人航天工程以及深空探测中的原位资源开发应用的主要应用前景,同时提出了空间微生物技术在地面医药、能源、环境等领域的应用潜力,以及服务于我国载人航天工程微生物研究的关键科学与技术发展方向。 展开更多
关键词 空间环境 微生物安全 微生物技术 载人航天工程
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部