This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geog...This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.展开更多
Flood control is closely related to the rising level of the upstream. Thechange of the main current and the inshore current velocity is induced by thecompletion of the regulation work. Yet Flood Control Departments pa...Flood control is closely related to the rising level of the upstream. Thechange of the main current and the inshore current velocity is induced by thecompletion of the regulation work. Yet Flood Control Departments pay muchmore attention to the extent,the range and the law of the inshore current velocity increase,especially in the river reaches which have arduous tasks of floodcontrol. Flood Control Departments object to constructing regulation work sucnas groynes,because they have always thought regulation work may lead to theincrease in the inshore current velocity.This paper intends to expound on theinfluences of regulation work on the extent,range and law of the inshore current velocity through analyzing the data obtained from the scale model tests ofthe Jiepai Reach in the middle of the Yangtze River and also discuss the possi-bility of limiting increase of the inshore current velocity through properly ad-justing regulaton work,thus we can correct evaluation of the influence of theriver regulation展开更多
Since 1990s,the spatial data warehouse technology has rapidly been developing, but due to the complexity of multi-dimensional analysis, extensive application of the spatial data warehouse technology is affected. In th...Since 1990s,the spatial data warehouse technology has rapidly been developing, but due to the complexity of multi-dimensional analysis, extensive application of the spatial data warehouse technology is affected. In the light of the characteristics of the flood control and disaster mitigation in the Yangtze river basin, it is proposed to design a scheme about the subjects and data distribution of the spatial data warehouse of the flood control and disaster mitigation in Yangtze river basin, i.e., to adopt a distributed scheme. The creation and development of the spatial data warehouse of the flood control and disaster mitigation in Yangtze river basin is presented .The necessity and urgency of establishing the spatial data warehouse is expounded from the viewpoint of the present situation being short of available information for the flood control and disaster mitigation in Yangtze river basin.展开更多
One of the most vulnerable parts to natural hazards in Serbia is Kolubara river basin. In the past, during the period from 1929 to 2013, 121 torrential flood events in the Kolubara river basin were recorded which show...One of the most vulnerable parts to natural hazards in Serbia is Kolubara river basin. In the past, during the period from 1929 to 2013, 121 torrential flood events in the Kolubara river basin were recorded which show that this territory is extremely vulnerable to the torrential floods. The extreme event which occurred in May 2014 causing the catastrophic material damages and casualties was the latest and historical flood. The analysis of natural conditions in the Kolubara basin uniformly showed that this area is predisposed to a greater number of torrential floods due to its geomorphological, hydrological and land use properties. Torrential floods are closely related to the intensity and spatial distribution of erosive processes in the upper part of the Kolubara basin. The estimation of soil erosion potential is generally achieved by Erosion Potential Model(EPM). For the purposes of determining the degree of torrential properties in various water streams in the Kolubara basin, the calculation ofsusceptibility to torrential floods was assessed by Flash Flood Potential Index(FFPI). More than half of the basin area(57.2%) is located within the category of very weak and weak erosion(Z_(sr) = 0.35), but the category of medium erosion is geospatially very common. Such a distribution of medium erosion category provides conditions for generating, i.e. production of sediment which would boost torrential properties of water streams. After the classification of the obtained FFPI values it was determined that 25% of the Kolubara basin is very susceptible to torrents and this data should be seriously taken into consideration. Based on the analyses, the best and most successful manner of defence is prevention which consists of the integrated river basin management system(integrated torrent control system) so that technical works in hydrographic networks of torrents and biological and biotechnical works on the slope of the basin would be the best solution. Permanent control of erosive and torrential processes in the river basin will be not only important for flood control but it can also protect the existing and future water reservoirs and retentions fromsiltation with erosion sediment which is of great significance to the water management, agriculture, energy sector, and the entire society.展开更多
近年来洪水引发的中小河流堤防溃决等洪水灾害风险问题凸显,因此进行溃堤洪水风险分析对于加强中小河流的洪水管理及减少溃堤洪水带来的损失具有十分重要的意义。以江西省罗塘河为例,借助MIKE软件中的MIKE 11、MIKE 21及其耦合模块对罗...近年来洪水引发的中小河流堤防溃决等洪水灾害风险问题凸显,因此进行溃堤洪水风险分析对于加强中小河流的洪水管理及减少溃堤洪水带来的损失具有十分重要的意义。以江西省罗塘河为例,借助MIKE软件中的MIKE 11、MIKE 21及其耦合模块对罗塘河遭遇10a一遇及20a一遇洪水进行溃堤洪水演进模拟。然后依据灾害系统理论从洪水的危险性和易损性两方面选择淹没水深、淹没流速、淹没历时等7个指标构建溃堤洪水风险评价指标体系。最后利用GIS技术与层次分析法对罗塘河洪水风险进行了评价。结果表明:洪水危险区面积为0.19 km 2,占研究区总面积的2.18%,主要分布在地势低洼的富港地区;重灾区和中灾区面积为1.25 km 2,占研究区总面积的14.37%,主要分布在重文和蒋元乐家;安全区为研究区域内洪水没有到达并且地物覆盖价值较低的地区,包括游家店、下胡、大塘杨家和马山等处。研究成果可为中小河流防洪规划、避洪转移等提供参考依据。展开更多
A number of devastating flood events have oc-curred in the various river basins of Turkey in the last decade. Because floods caused deaths, suffering and extensive damages to both public and private properties in the ...A number of devastating flood events have oc-curred in the various river basins of Turkey in the last decade. Because floods caused deaths, suffering and extensive damages to both public and private properties in the flood areas, the government had to most of the damage in addi-tion to losing significant revenues due to the consequences of costly social and economic disruption. On the other hand, some social structures such as socioeconomic activities, land-use patterns and hydro-morphological processes are destroyed. Whereas flood control structures are considered as one of the basic strategies that can reduce flood damages and in this context flood protection planning should consider the full range of the hazard mitigation activities. In Turkey, between 1945 and 1990, 737 flooding events were occurred and at least 830 people were killed. In 1998, there was a major flooding in Zonguldak-Bartin region located on north of Turkey. Due to this devastated flooding, people lost their life and numbers of engineer-ing structures built on the river and surrounding area were totally destroyed or heavily damaged. Both side of the canal were covered with muddy soil having 0.10-0.15 m thickness. Cleaning up process took sometimes in the region. In this paper, all these subjects have been investigated in the basin and some engineering proposals have been presented.展开更多
Flood control of the Yangtze River is an important part of China’s national water security.In July 2020,due to continuous heavy rainfall,the water levels along the middle-lower reaches of the Yangtze River and major ...Flood control of the Yangtze River is an important part of China’s national water security.In July 2020,due to continuous heavy rainfall,the water levels along the middle-lower reaches of the Yangtze River and major lakes constantly exceeded the warning levels,in which Taihu Lake exceeded its highest safety water level and some stations of Poyang Lake reached their highest water levels in its history.In August 2020,another huge flood occurred in the Minjiang River and the Jialing River in the upper Yangtze River,and some areas of Chongqing Municipality and other cities along the rivers were inundated,resulting in great pressure on flood control and high disaster losses.The 2020 Yangtze River flood has received extensive media coverage and raised concerns on the roles of the Three Gorges Dam and other large reservoirs in flood control.Here we analyze the changes in the pattern of the Yangtze River flood control by comparing the strategies to tackle the three heavy floods occurring in 1954,1998,and 2020.We propose that the overall strategy of the Yangtze River flood control in the new era should adhere to the principle of"Integration of storage and drainage over the entire Yangtze River Basin,with draining floods downstream as the first priority"by using both engineering and non-engineering measures.On the basis of embankments,the engineering measures should use the Three Gorges Dam and other large reservoirs as the major regulatory means,promote the construction of key flood detention areas,keep the floodways clear,and maintain the ecosystem services of wetlands and shoals.In terms of non-engineering measures,we should strengthen adaptive flood risk management under climate change,standardize the use of lands in flood detention areas,give space to floods,and promote the implementation of flood risk maps and flood insurance policies.The ultimate goal of this new flood control system is to enhance the adaptability to frequent floods and increase the resilience to extreme flood disasters.展开更多
基金The National Basic Research Program of China (2010CB428406)the National Natural Science Foundation of China (No. 41071025/40730632) & National Key Water Project (No.2009ZX07210-006)
文摘This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.
文摘Flood control is closely related to the rising level of the upstream. Thechange of the main current and the inshore current velocity is induced by thecompletion of the regulation work. Yet Flood Control Departments pay muchmore attention to the extent,the range and the law of the inshore current velocity increase,especially in the river reaches which have arduous tasks of floodcontrol. Flood Control Departments object to constructing regulation work sucnas groynes,because they have always thought regulation work may lead to theincrease in the inshore current velocity.This paper intends to expound on theinfluences of regulation work on the extent,range and law of the inshore current velocity through analyzing the data obtained from the scale model tests ofthe Jiepai Reach in the middle of the Yangtze River and also discuss the possi-bility of limiting increase of the inshore current velocity through properly ad-justing regulaton work,thus we can correct evaluation of the influence of theriver regulation
文摘Since 1990s,the spatial data warehouse technology has rapidly been developing, but due to the complexity of multi-dimensional analysis, extensive application of the spatial data warehouse technology is affected. In the light of the characteristics of the flood control and disaster mitigation in the Yangtze river basin, it is proposed to design a scheme about the subjects and data distribution of the spatial data warehouse of the flood control and disaster mitigation in Yangtze river basin, i.e., to adopt a distributed scheme. The creation and development of the spatial data warehouse of the flood control and disaster mitigation in Yangtze river basin is presented .The necessity and urgency of establishing the spatial data warehouse is expounded from the viewpoint of the present situation being short of available information for the flood control and disaster mitigation in Yangtze river basin.
基金part of the project "The Research on Climate Change Influences on Environment: Influence Monitoring, Adaptation and Mitigation" (43007), subproject No. 9: "Torrential Floods Frequency, Soil and Water Degradation as the Consequence of Global Changes"financed by Ministry of Education, Science and Technological Development of the Republic of Serbia as part of the Integrated and Interdisciplinary Researches programme for the period from 2011 to 2017
文摘One of the most vulnerable parts to natural hazards in Serbia is Kolubara river basin. In the past, during the period from 1929 to 2013, 121 torrential flood events in the Kolubara river basin were recorded which show that this territory is extremely vulnerable to the torrential floods. The extreme event which occurred in May 2014 causing the catastrophic material damages and casualties was the latest and historical flood. The analysis of natural conditions in the Kolubara basin uniformly showed that this area is predisposed to a greater number of torrential floods due to its geomorphological, hydrological and land use properties. Torrential floods are closely related to the intensity and spatial distribution of erosive processes in the upper part of the Kolubara basin. The estimation of soil erosion potential is generally achieved by Erosion Potential Model(EPM). For the purposes of determining the degree of torrential properties in various water streams in the Kolubara basin, the calculation ofsusceptibility to torrential floods was assessed by Flash Flood Potential Index(FFPI). More than half of the basin area(57.2%) is located within the category of very weak and weak erosion(Z_(sr) = 0.35), but the category of medium erosion is geospatially very common. Such a distribution of medium erosion category provides conditions for generating, i.e. production of sediment which would boost torrential properties of water streams. After the classification of the obtained FFPI values it was determined that 25% of the Kolubara basin is very susceptible to torrents and this data should be seriously taken into consideration. Based on the analyses, the best and most successful manner of defence is prevention which consists of the integrated river basin management system(integrated torrent control system) so that technical works in hydrographic networks of torrents and biological and biotechnical works on the slope of the basin would be the best solution. Permanent control of erosive and torrential processes in the river basin will be not only important for flood control but it can also protect the existing and future water reservoirs and retentions fromsiltation with erosion sediment which is of great significance to the water management, agriculture, energy sector, and the entire society.
文摘近年来洪水引发的中小河流堤防溃决等洪水灾害风险问题凸显,因此进行溃堤洪水风险分析对于加强中小河流的洪水管理及减少溃堤洪水带来的损失具有十分重要的意义。以江西省罗塘河为例,借助MIKE软件中的MIKE 11、MIKE 21及其耦合模块对罗塘河遭遇10a一遇及20a一遇洪水进行溃堤洪水演进模拟。然后依据灾害系统理论从洪水的危险性和易损性两方面选择淹没水深、淹没流速、淹没历时等7个指标构建溃堤洪水风险评价指标体系。最后利用GIS技术与层次分析法对罗塘河洪水风险进行了评价。结果表明:洪水危险区面积为0.19 km 2,占研究区总面积的2.18%,主要分布在地势低洼的富港地区;重灾区和中灾区面积为1.25 km 2,占研究区总面积的14.37%,主要分布在重文和蒋元乐家;安全区为研究区域内洪水没有到达并且地物覆盖价值较低的地区,包括游家店、下胡、大塘杨家和马山等处。研究成果可为中小河流防洪规划、避洪转移等提供参考依据。
文摘A number of devastating flood events have oc-curred in the various river basins of Turkey in the last decade. Because floods caused deaths, suffering and extensive damages to both public and private properties in the flood areas, the government had to most of the damage in addi-tion to losing significant revenues due to the consequences of costly social and economic disruption. On the other hand, some social structures such as socioeconomic activities, land-use patterns and hydro-morphological processes are destroyed. Whereas flood control structures are considered as one of the basic strategies that can reduce flood damages and in this context flood protection planning should consider the full range of the hazard mitigation activities. In Turkey, between 1945 and 1990, 737 flooding events were occurred and at least 830 people were killed. In 1998, there was a major flooding in Zonguldak-Bartin region located on north of Turkey. Due to this devastated flooding, people lost their life and numbers of engineer-ing structures built on the river and surrounding area were totally destroyed or heavily damaged. Both side of the canal were covered with muddy soil having 0.10-0.15 m thickness. Cleaning up process took sometimes in the region. In this paper, all these subjects have been investigated in the basin and some engineering proposals have been presented.
基金supported by the Major Program of the National Natural Science Foundation of China(Grant No.41890823)。
文摘Flood control of the Yangtze River is an important part of China’s national water security.In July 2020,due to continuous heavy rainfall,the water levels along the middle-lower reaches of the Yangtze River and major lakes constantly exceeded the warning levels,in which Taihu Lake exceeded its highest safety water level and some stations of Poyang Lake reached their highest water levels in its history.In August 2020,another huge flood occurred in the Minjiang River and the Jialing River in the upper Yangtze River,and some areas of Chongqing Municipality and other cities along the rivers were inundated,resulting in great pressure on flood control and high disaster losses.The 2020 Yangtze River flood has received extensive media coverage and raised concerns on the roles of the Three Gorges Dam and other large reservoirs in flood control.Here we analyze the changes in the pattern of the Yangtze River flood control by comparing the strategies to tackle the three heavy floods occurring in 1954,1998,and 2020.We propose that the overall strategy of the Yangtze River flood control in the new era should adhere to the principle of"Integration of storage and drainage over the entire Yangtze River Basin,with draining floods downstream as the first priority"by using both engineering and non-engineering measures.On the basis of embankments,the engineering measures should use the Three Gorges Dam and other large reservoirs as the major regulatory means,promote the construction of key flood detention areas,keep the floodways clear,and maintain the ecosystem services of wetlands and shoals.In terms of non-engineering measures,we should strengthen adaptive flood risk management under climate change,standardize the use of lands in flood detention areas,give space to floods,and promote the implementation of flood risk maps and flood insurance policies.The ultimate goal of this new flood control system is to enhance the adaptability to frequent floods and increase the resilience to extreme flood disasters.