This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitor...This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.展开更多
A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project r...A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.展开更多
The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dyna...The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dynamic monitoring of hazard sources directly reduce the probability of accidents.The full-staff responsibility system and performance evaluation indirectly enhance the resilience of risk prevention and control by shaping a culture of risk awareness.Based on the new local safety officer qualification regulations and the mandatory promotion of digital tools by 2025,case analysis indicates that the collaborative application of BIM and AI early warning platforms can reduce the risk of falls from height by 45%.The rigid constraints of systems,technological innovation and iteration,and the cultivation of cultural ecosystems form a multi-dimensional collaborative mechanism.In the future,it is necessary to integrate intelligent perception with green construction standards to achieve an upgrade in risk management efficiency.展开更多
Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. I...Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.展开更多
Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped w...Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.展开更多
为提升建筑工程项目的经济效益与造价管理水平,聚焦于工程造价成本控制与风险管理的协同策略研究。通过梳理造价成本构成及其影响因素,结合现代信息技术,提出集成化动态管理思路。研究采用文献综述、模型分析与案例归纳等方法,构建基于...为提升建筑工程项目的经济效益与造价管理水平,聚焦于工程造价成本控制与风险管理的协同策略研究。通过梳理造价成本构成及其影响因素,结合现代信息技术,提出集成化动态管理思路。研究采用文献综述、模型分析与案例归纳等方法,构建基于层次分析法与模糊评价法的风险评估模型,并引入大数据分析与建筑信息模型(building information modeling,BIM)等技术手段,提高成本监控的实时性与智能化水平。研究结果表明,协同引入动态成本控制与智能风险预警机制,可有效降低预算偏差率,提高资源配置效率与管理响应能力。研究最终形成了一套融合“全过程控制、风险联动、技术支撑”的管理策略体系,为提升建筑工程造价控制科学性与工程风险应对能力提供了理论基础与实践参考。展开更多
文摘This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.
基金Supported bythe Plan of New Technology Projectsin China National Packaging Corporation2005 (05ZBJA011)the Na-tional Natural Science Foundation of China (60373062) National Sci-ence Foundation of Hunan Province(04JJ3052)
文摘A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.
文摘The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dynamic monitoring of hazard sources directly reduce the probability of accidents.The full-staff responsibility system and performance evaluation indirectly enhance the resilience of risk prevention and control by shaping a culture of risk awareness.Based on the new local safety officer qualification regulations and the mandatory promotion of digital tools by 2025,case analysis indicates that the collaborative application of BIM and AI early warning platforms can reduce the risk of falls from height by 45%.The rigid constraints of systems,technological innovation and iteration,and the cultivation of cultural ecosystems form a multi-dimensional collaborative mechanism.In the future,it is necessary to integrate intelligent perception with green construction standards to achieve an upgrade in risk management efficiency.
文摘Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.
文摘Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.
文摘为提升建筑工程项目的经济效益与造价管理水平,聚焦于工程造价成本控制与风险管理的协同策略研究。通过梳理造价成本构成及其影响因素,结合现代信息技术,提出集成化动态管理思路。研究采用文献综述、模型分析与案例归纳等方法,构建基于层次分析法与模糊评价法的风险评估模型,并引入大数据分析与建筑信息模型(building information modeling,BIM)等技术手段,提高成本监控的实时性与智能化水平。研究结果表明,协同引入动态成本控制与智能风险预警机制,可有效降低预算偏差率,提高资源配置效率与管理响应能力。研究最终形成了一套融合“全过程控制、风险联动、技术支撑”的管理策略体系,为提升建筑工程造价控制科学性与工程风险应对能力提供了理论基础与实践参考。