Purpose–This study aims to design and validate an emergency response method for high-speed railway earthquake early warning(EEW)systems based on the Propagation of Local Undamped Motion(PLUM)principle in order to enh...Purpose–This study aims to design and validate an emergency response method for high-speed railway earthquake early warning(EEW)systems based on the Propagation of Local Undamped Motion(PLUM)principle in order to enhance the timeliness and accuracy of warnings under seismic threats.Design/methodology/approach–A hierarchical architecture of the railway EEW system was adopted,in which self-built stations along the railway serve as the backbone and the national seismic network provides supplementary data.Warning zones were designed along the railway using overlapping trapezoidal layouts to cover seismic stations and reduce inter-regional time delays.Offline replay experiments were conducted using 82 historical earthquake events and records from 61 seismic stations to evaluate the timeliness and accuracy of warning information.Findings–The results indicate that the PLUM-based early warning method can issue emergency response information before destructive seismic waves arrive.Multiple earthquake experiments demonstrated high reliability and stability,with effective detection across different magnitudes and epicentral distances.Furthermore,the trapezoidal overlapping zone design improved regional consistency and significantly reduced missed alerts.Originality/value–This work represents the first systematic application of the PLUM method to high-speed railway EEW in China.By integrating railway operational requirements,the proposed method provides a practical and robust emergency response strategy,offering new insights into seismic risk mitigation for China’s high-speed railways.展开更多
Plum blossom pile is a new type of special-shaped pile, which is proposed based on the principle of maximum perimeter with the same cross-sectional area. To advance this technique, primarily for the design of plum blo...Plum blossom pile is a new type of special-shaped pile, which is proposed based on the principle of maximum perimeter with the same cross-sectional area. To advance this technique, primarily for the design of plum blossom piles, it is important to investigate the skin friction behavior of plum blossom pile foundations precluding any straightforward constitutive model. In this work, an analytic method dependent on the cross-sectional geometry and the vertical shearing effects is proposed by means of equilibrium analysis to calculate the effective vertical stress in the surrounding soil, the skin friction/negative skin friction, and the axial force/dragload of a plum blossom pile. Additionally, the curves of skin friction of piles are investigated with the same conditions. The results show that the curves of skin friction of piles deduced according to the developed analytic method agree well with the FEM results and related literature solution, which validates the solution. The axial force of the pile decreases with the increase of the shear action coefficient in the buried depth direction under the vertical concentrated load when considering the vertical shearing effects on the pile-soil interfaces.展开更多
认为文艺和文学作品名的命名和翻译为作品的画龙点睛,针对相关翻译问题,本文提出了作品名翻译的"关联省力语效原则"(PREE)以及8种译法。最后以Helen Chasin的一首英语诗歌The Word Plum为例,说明其中的Plum不能译为"李子...认为文艺和文学作品名的命名和翻译为作品的画龙点睛,针对相关翻译问题,本文提出了作品名翻译的"关联省力语效原则"(PREE)以及8种译法。最后以Helen Chasin的一首英语诗歌The Word Plum为例,说明其中的Plum不能译为"李子/梅子"而应译为"葡萄"。结论是作品的翻译要"从名做起,名正言顺",具体操作则可以PREE为纲,实现关联、省力、语效3个方面均等效的翻译。展开更多
文摘Purpose–This study aims to design and validate an emergency response method for high-speed railway earthquake early warning(EEW)systems based on the Propagation of Local Undamped Motion(PLUM)principle in order to enhance the timeliness and accuracy of warnings under seismic threats.Design/methodology/approach–A hierarchical architecture of the railway EEW system was adopted,in which self-built stations along the railway serve as the backbone and the national seismic network provides supplementary data.Warning zones were designed along the railway using overlapping trapezoidal layouts to cover seismic stations and reduce inter-regional time delays.Offline replay experiments were conducted using 82 historical earthquake events and records from 61 seismic stations to evaluate the timeliness and accuracy of warning information.Findings–The results indicate that the PLUM-based early warning method can issue emergency response information before destructive seismic waves arrive.Multiple earthquake experiments demonstrated high reliability and stability,with effective detection across different magnitudes and epicentral distances.Furthermore,the trapezoidal overlapping zone design improved regional consistency and significantly reduced missed alerts.Originality/value–This work represents the first systematic application of the PLUM method to high-speed railway EEW in China.By integrating railway operational requirements,the proposed method provides a practical and robust emergency response strategy,offering new insights into seismic risk mitigation for China’s high-speed railways.
基金Project(52325905) supported by the National Natural Science Foundation of ChinaProjects(DJ-HXGG-2023-04, DJHXGG-2023-16) supported by the Key Technology Research Projects of Power China。
文摘Plum blossom pile is a new type of special-shaped pile, which is proposed based on the principle of maximum perimeter with the same cross-sectional area. To advance this technique, primarily for the design of plum blossom piles, it is important to investigate the skin friction behavior of plum blossom pile foundations precluding any straightforward constitutive model. In this work, an analytic method dependent on the cross-sectional geometry and the vertical shearing effects is proposed by means of equilibrium analysis to calculate the effective vertical stress in the surrounding soil, the skin friction/negative skin friction, and the axial force/dragload of a plum blossom pile. Additionally, the curves of skin friction of piles are investigated with the same conditions. The results show that the curves of skin friction of piles deduced according to the developed analytic method agree well with the FEM results and related literature solution, which validates the solution. The axial force of the pile decreases with the increase of the shear action coefficient in the buried depth direction under the vertical concentrated load when considering the vertical shearing effects on the pile-soil interfaces.
文摘认为文艺和文学作品名的命名和翻译为作品的画龙点睛,针对相关翻译问题,本文提出了作品名翻译的"关联省力语效原则"(PREE)以及8种译法。最后以Helen Chasin的一首英语诗歌The Word Plum为例,说明其中的Plum不能译为"李子/梅子"而应译为"葡萄"。结论是作品的翻译要"从名做起,名正言顺",具体操作则可以PREE为纲,实现关联、省力、语效3个方面均等效的翻译。