Currently,the International Maritime Organization(IMO)has approved and implemented the assessment requirement for Minimum Propulsion Power(MPP)of ships in adverse sea conditions.The assessment method and relevant infl...Currently,the International Maritime Organization(IMO)has approved and implemented the assessment requirement for Minimum Propulsion Power(MPP)of ships in adverse sea conditions.The assessment method and relevant influence factors will have a vital impact on ship's design and operation.On the other hand,MPP is essentially a criterion for manoeuvring safety at actual seas.However,the practical assessment methods adopted in IMO guidelines do not directly and accurately account for ship's coursekeeping ability in severe seas.A time-domain comprehensive method with supplementary course-keeping ability criteria has been proposed in the authors'preliminary research.Based on an updated mathematical model and criteria,this paper presents more detailed elaborations,results and discussions on the time-domain method,including the comparative analyses with a power line method and two steady-state equilibrium methods based on IMO guidelines and draft.Discussions on the influences of key factors,involving criterion conditions and calculation parameters,are also presented.The results indicate that different methods exhibit varying advantages and complexity in MPP assessment,thus constituting a multi-level assessment framework for MPP.In particular,the time-domain comprehensive assessment has a higher accuracy with more realistic description of manoeuvre behaviors,capable of offering a solution for the ships that cannot meet other assessments,or for the assessment requiring additional course-keeping ability.Furthermore,an expanded range of wave direction sets a stricter but potentially necessary requirement,while using the self-propulsion factors at low speeds can eliminate the unnecessary conservation of assessment result caused by those at design speed.展开更多
The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topolo...The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topology of soft-switching inverter arc welding power supplies. However, the output power still remains a certain value when the duty-cycle of leading arm decreases to zero. The working-mode of soft-switching inverter and the waveforms of major parameters with the condition of duty-cycle of leading arm being zero are studied in this paper. U-1 characteristic experiments prove that the minimum output power of soft-switching circuit, which depends on the charged voltage of capacitors in parallel with leading arm, can be decreased by reducing the duty-cycle of lagging arm. By switching working-modes between half-bridge and full-bridge, the output power can swing from zero to the power rating.展开更多
In this paper we study the relationship between minimum rank of graph G and the minimum rank of graph for some families of special graph G, where is the jth power of graph G.
New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the depen...New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the dependence of RES on natural conditions of region, schedule of energy supply, parameters and configuration of distribution network is suggested in the paper. Results of computations of test scheme confirm the efficiency of the proposed method and its simplicity as compared with the methods considered in literature sources.展开更多
The effects of stage numbers on power dissipation of pipeline analog-to-digital converter (ADC) are studied and a novel design method aiming for power optimization is presented. In this method, a minimum comparator ...The effects of stage numbers on power dissipation of pipeline analog-to-digital converter (ADC) are studied and a novel design method aiming for power optimization is presented. In this method, a minimum comparator number algorithm (MCNA) is first introduced, and then the optimum distribution of resolutions through pipeline ADC stages is deduced by MCNA. Based on the optimum stage-resolution distribution, an optimization method is established, which examines the precise function between ADC power and stage resolutions with a parameter of power ratio (Rp). For 10-bit pipeline ADC with scaling down technology, the simulation results by using MATLAB CAD tools show that an eight-stage topology with 1-bit RSD correction achieves the power optimization indicated by the power reduction ratio.展开更多
大规模风电机组并网使得电力系统等效惯量迅速下降,系统惯量逐渐接近临界水平,系统频率运行安全受到影响。为量化计算含大规模风电电力系统的最小惯量需求,文章首先基于经典系统频率响应(System Frequency Response,SFR)模型,建立了考...大规模风电机组并网使得电力系统等效惯量迅速下降,系统惯量逐渐接近临界水平,系统频率运行安全受到影响。为量化计算含大规模风电电力系统的最小惯量需求,文章首先基于经典系统频率响应(System Frequency Response,SFR)模型,建立了考虑大规模风电并网的SFR模型。首先,基于改进的SFR模型量化推导电力系统初始频率变化率、频率最低点等频率特征指标;其次,计算了风电场等效虚拟惯量,并结合电力系统惯量理论量化分析含大规模风电电力系统的理论惯量和计算惯量;再次,以动态频率特征为约束,提出含大规模风电电力系统最小惯量需求评估流程;最后,利用Matlab/Simulink对所提评估方法进行验证。展开更多
文摘Currently,the International Maritime Organization(IMO)has approved and implemented the assessment requirement for Minimum Propulsion Power(MPP)of ships in adverse sea conditions.The assessment method and relevant influence factors will have a vital impact on ship's design and operation.On the other hand,MPP is essentially a criterion for manoeuvring safety at actual seas.However,the practical assessment methods adopted in IMO guidelines do not directly and accurately account for ship's coursekeeping ability in severe seas.A time-domain comprehensive method with supplementary course-keeping ability criteria has been proposed in the authors'preliminary research.Based on an updated mathematical model and criteria,this paper presents more detailed elaborations,results and discussions on the time-domain method,including the comparative analyses with a power line method and two steady-state equilibrium methods based on IMO guidelines and draft.Discussions on the influences of key factors,involving criterion conditions and calculation parameters,are also presented.The results indicate that different methods exhibit varying advantages and complexity in MPP assessment,thus constituting a multi-level assessment framework for MPP.In particular,the time-domain comprehensive assessment has a higher accuracy with more realistic description of manoeuvre behaviors,capable of offering a solution for the ships that cannot meet other assessments,or for the assessment requiring additional course-keeping ability.Furthermore,an expanded range of wave direction sets a stricter but potentially necessary requirement,while using the self-propulsion factors at low speeds can eliminate the unnecessary conservation of assessment result caused by those at design speed.
文摘The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topology of soft-switching inverter arc welding power supplies. However, the output power still remains a certain value when the duty-cycle of leading arm decreases to zero. The working-mode of soft-switching inverter and the waveforms of major parameters with the condition of duty-cycle of leading arm being zero are studied in this paper. U-1 characteristic experiments prove that the minimum output power of soft-switching circuit, which depends on the charged voltage of capacitors in parallel with leading arm, can be decreased by reducing the duty-cycle of lagging arm. By switching working-modes between half-bridge and full-bridge, the output power can swing from zero to the power rating.
文摘In this paper we study the relationship between minimum rank of graph G and the minimum rank of graph for some families of special graph G, where is the jth power of graph G.
文摘New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the dependence of RES on natural conditions of region, schedule of energy supply, parameters and configuration of distribution network is suggested in the paper. Results of computations of test scheme confirm the efficiency of the proposed method and its simplicity as compared with the methods considered in literature sources.
基金Supported by the National Natural Science Foundation of China (No. 60072004)
文摘The effects of stage numbers on power dissipation of pipeline analog-to-digital converter (ADC) are studied and a novel design method aiming for power optimization is presented. In this method, a minimum comparator number algorithm (MCNA) is first introduced, and then the optimum distribution of resolutions through pipeline ADC stages is deduced by MCNA. Based on the optimum stage-resolution distribution, an optimization method is established, which examines the precise function between ADC power and stage resolutions with a parameter of power ratio (Rp). For 10-bit pipeline ADC with scaling down technology, the simulation results by using MATLAB CAD tools show that an eight-stage topology with 1-bit RSD correction achieves the power optimization indicated by the power reduction ratio.
文摘大规模风电机组并网使得电力系统等效惯量迅速下降,系统惯量逐渐接近临界水平,系统频率运行安全受到影响。为量化计算含大规模风电电力系统的最小惯量需求,文章首先基于经典系统频率响应(System Frequency Response,SFR)模型,建立了考虑大规模风电并网的SFR模型。首先,基于改进的SFR模型量化推导电力系统初始频率变化率、频率最低点等频率特征指标;其次,计算了风电场等效虚拟惯量,并结合电力系统惯量理论量化分析含大规模风电电力系统的理论惯量和计算惯量;再次,以动态频率特征为约束,提出含大规模风电电力系统最小惯量需求评估流程;最后,利用Matlab/Simulink对所提评估方法进行验证。