The centralized radio access cellular network infrastructure based on centralized Super Base Station(CSBS) is a promising solution to reduce the high construction cost and energy consumption of conventional cellular n...The centralized radio access cellular network infrastructure based on centralized Super Base Station(CSBS) is a promising solution to reduce the high construction cost and energy consumption of conventional cellular networks. With CSBS, the computing resource for communication protocol processing could be managed flexibly according the protocol load to improve the resource efficiency. Since the protocol load changes frequently and may exceed the capacity of processors, load balancing is needed. However, existing load balancing mechanisms used in data centers cannot satisfy the real-time requirement of the communication protocol processing. Therefore, a new computing resource adjustment scheme is proposed for communication protocol processing in the CSBS architecture. First of all, the main principles of protocol processing resource adjustment is concluded, followed by the analysis on the processing resource outage probability that the computing resource becomes inadequate for protocol processing as load changes. Following the adjustment principles, the proposed scheme is designed to reduce the processing resource outage probability based onthe optimized connected graph which is constructed by the approximate Kruskal algorithm. Simulation re-sults show that compared with the conventional load balancing mechanisms, the proposed scheme can reduce the occurrence number of inadequate processing resource and the additional resource consumption of adjustment greatly.展开更多
A regional multiple objective water resource and economic optimization model was developed using a quantitative method of systematic analysis. Input to the model includes indexes of economic structure and development,...A regional multiple objective water resource and economic optimization model was developed using a quantitative method of systematic analysis. Input to the model includes indexes of economic structure and development, water resource utilization, wastewater and pollutant discharge, and investment in wastewater treatment. The model, which consists of production structure and industrial structure optimization modules, was applied to the Guanzhong region in the middle reaches of the Huanghe (Yellow) River basin in China. By evaluating several alternative production and industrialization schemes, the modal indicate that water pollution will get worsen though wastewater treatment improves if the economy continues to develop at the planned speed without structural adjustment. However, the results also show that not only economic goals but also water resource protection and pollution control targets can be achieved under an alternative, recommended production and industrial structure. This example illustrates that economic development and environmental protection can be improved coordinately by the regional multiple objective water resource and economic optimization model. It provides an operable approach to the simultaneous sustained development of water resources and economic growth.展开更多
Development of the intermittent energy is greatly promoted by change in energy, while consumption of large-scale intermittent energy is becoming a problem. With the development of smart grid technology, controllabilit...Development of the intermittent energy is greatly promoted by change in energy, while consumption of large-scale intermittent energy is becoming a problem. With the development of smart grid technology, controllability of load side resources is becoming more and more important. Based on the wave characteristics of wind power, this paper indicates that wind energy has continuous output characteristics on the hour-time scale. Through analysis on loads characteristic of industry, public facility and resident, this paper gets comprehensive response of load side resources. Considering characteristics of wind power output, combined with different load side resources and DR program, this paper suggests cooperation between wind power and load side resources on different time scales.展开更多
Resource reconstruction algorithms are studied in this paper to solve the problem of resource on-demand allocation and improve the efficiency of resource utilization in virtual computing resource pool. Based on the id...Resource reconstruction algorithms are studied in this paper to solve the problem of resource on-demand allocation and improve the efficiency of resource utilization in virtual computing resource pool. Based on the idea of resource virtualization and the analysis of the resource status transition, the resource allocation process and the necessity of resource reconstruction are presented, l^esource reconstruction algorithms are designed to determine the resource reconstruction types, and it is shown that they can achieve the goal of resource on-demand allocation through three methodologies: resource combination, resource split, and resource random adjustment. The effects that the resource users have on the resource reconstruction results, the deviation between resources and requirements, and the uniformity of resource distribution are studied by three experiments. The experiments show that resource reconstruction has a close relationship with resource requirements, but it is not the same with current distribution of resources. The algorithms can complete the resource adjustment with a lower cost and form the logic resources to match the demands of resource users easily.展开更多
基金supported in part by the National Science Foundationof China under Grant number 61431001the Beijing Talents Fund under Grant number 2015000021223ZK31
文摘The centralized radio access cellular network infrastructure based on centralized Super Base Station(CSBS) is a promising solution to reduce the high construction cost and energy consumption of conventional cellular networks. With CSBS, the computing resource for communication protocol processing could be managed flexibly according the protocol load to improve the resource efficiency. Since the protocol load changes frequently and may exceed the capacity of processors, load balancing is needed. However, existing load balancing mechanisms used in data centers cannot satisfy the real-time requirement of the communication protocol processing. Therefore, a new computing resource adjustment scheme is proposed for communication protocol processing in the CSBS architecture. First of all, the main principles of protocol processing resource adjustment is concluded, followed by the analysis on the processing resource outage probability that the computing resource becomes inadequate for protocol processing as load changes. Following the adjustment principles, the proposed scheme is designed to reduce the processing resource outage probability based onthe optimized connected graph which is constructed by the approximate Kruskal algorithm. Simulation re-sults show that compared with the conventional load balancing mechanisms, the proposed scheme can reduce the occurrence number of inadequate processing resource and the additional resource consumption of adjustment greatly.
文摘A regional multiple objective water resource and economic optimization model was developed using a quantitative method of systematic analysis. Input to the model includes indexes of economic structure and development, water resource utilization, wastewater and pollutant discharge, and investment in wastewater treatment. The model, which consists of production structure and industrial structure optimization modules, was applied to the Guanzhong region in the middle reaches of the Huanghe (Yellow) River basin in China. By evaluating several alternative production and industrialization schemes, the modal indicate that water pollution will get worsen though wastewater treatment improves if the economy continues to develop at the planned speed without structural adjustment. However, the results also show that not only economic goals but also water resource protection and pollution control targets can be achieved under an alternative, recommended production and industrial structure. This example illustrates that economic development and environmental protection can be improved coordinately by the regional multiple objective water resource and economic optimization model. It provides an operable approach to the simultaneous sustained development of water resources and economic growth.
文摘Development of the intermittent energy is greatly promoted by change in energy, while consumption of large-scale intermittent energy is becoming a problem. With the development of smart grid technology, controllability of load side resources is becoming more and more important. Based on the wave characteristics of wind power, this paper indicates that wind energy has continuous output characteristics on the hour-time scale. Through analysis on loads characteristic of industry, public facility and resident, this paper gets comprehensive response of load side resources. Considering characteristics of wind power output, combined with different load side resources and DR program, this paper suggests cooperation between wind power and load side resources on different time scales.
基金supported by National High Technology Research and Development Program of China (863 Program)(No. 2007AA010305)the Excellent Doctor Degree Dissertation Fund of Xi an University of Technology (No. 102-211007)
文摘Resource reconstruction algorithms are studied in this paper to solve the problem of resource on-demand allocation and improve the efficiency of resource utilization in virtual computing resource pool. Based on the idea of resource virtualization and the analysis of the resource status transition, the resource allocation process and the necessity of resource reconstruction are presented, l^esource reconstruction algorithms are designed to determine the resource reconstruction types, and it is shown that they can achieve the goal of resource on-demand allocation through three methodologies: resource combination, resource split, and resource random adjustment. The effects that the resource users have on the resource reconstruction results, the deviation between resources and requirements, and the uniformity of resource distribution are studied by three experiments. The experiments show that resource reconstruction has a close relationship with resource requirements, but it is not the same with current distribution of resources. The algorithms can complete the resource adjustment with a lower cost and form the logic resources to match the demands of resource users easily.