The design operating conditions of rubber dams were analyzed,and it is found that the operating conditions are similar to the actual operating conditions of changes in the internal pressure ratio of a specific rubber ...The design operating conditions of rubber dams were analyzed,and it is found that the operating conditions are similar to the actual operating conditions of changes in the internal pressure ratio of a specific rubber dam bag in the process of filling and draining. Based on this,the linear relationship curve between the internal pressure head H0 and the real-time dam height H and its approximate analytical formula can be obtained,which can be used as a supplement and correction method for the measurement method of real-time dam height during rubber dam operation,and provides reference for rubber dam project managers.展开更多
This paper gives an introduction to the large dam construction achievements seen in China over the past fifty years. Four developmental stages, dam height and darn type, newly adopted and developing dam types are elab...This paper gives an introduction to the large dam construction achievements seen in China over the past fifty years. Four developmental stages, dam height and darn type, newly adopted and developing dam types are elaborated in detail, with large dam statistics completed and under construction attached as well.展开更多
Transverse joint aperture is of certain reference value to ensure joint grouting quality and overall safety of high arch dam. A 3D isoparametric joint element model with spherical surface key grooves and finite thickn...Transverse joint aperture is of certain reference value to ensure joint grouting quality and overall safety of high arch dam. A 3D isoparametric joint element model with spherical surface key grooves and finite thickness is used to simulate a transverse joint. A set of program is developed to simulate the transverse joint ap- erture of Dagangshan high arch dam. Combined with the measured temperatures, the whole developing process of Dagangshan arch dam's transverse joint aperture is simulated. The real work behav- ior of transverse joint, thermal and mechanical properties of con- crete, pouring process, joint grouting temperature and cantilever height of high arch dam are considered during the simulation. The simulation results show that the lower of the joint grouting tem- perature, the larger value of transverse joint aperture; the higher of cantilever height during the construction period, the smaller value of transverse joint aperture.展开更多
文摘The design operating conditions of rubber dams were analyzed,and it is found that the operating conditions are similar to the actual operating conditions of changes in the internal pressure ratio of a specific rubber dam bag in the process of filling and draining. Based on this,the linear relationship curve between the internal pressure head H0 and the real-time dam height H and its approximate analytical formula can be obtained,which can be used as a supplement and correction method for the measurement method of real-time dam height during rubber dam operation,and provides reference for rubber dam project managers.
文摘This paper gives an introduction to the large dam construction achievements seen in China over the past fifty years. Four developmental stages, dam height and darn type, newly adopted and developing dam types are elaborated in detail, with large dam statistics completed and under construction attached as well.
基金Supported by the National Natural Science Foundation of China(50909078)the National Basic Research Program of China(973 Program)(2013CB035901)
文摘Transverse joint aperture is of certain reference value to ensure joint grouting quality and overall safety of high arch dam. A 3D isoparametric joint element model with spherical surface key grooves and finite thickness is used to simulate a transverse joint. A set of program is developed to simulate the transverse joint ap- erture of Dagangshan high arch dam. Combined with the measured temperatures, the whole developing process of Dagangshan arch dam's transverse joint aperture is simulated. The real work behav- ior of transverse joint, thermal and mechanical properties of con- crete, pouring process, joint grouting temperature and cantilever height of high arch dam are considered during the simulation. The simulation results show that the lower of the joint grouting tem- perature, the larger value of transverse joint aperture; the higher of cantilever height during the construction period, the smaller value of transverse joint aperture.