期刊文献+
共找到564篇文章
< 1 2 29 >
每页显示 20 50 100
Optimization of Reconfiguration and Resource Allocation for Distributed Generation and Capacitor Banks Using NSGA-Ⅱ:A Multi-Scenario Approach
1
作者 Tareq Hamadneh Belal Batiha +3 位作者 Frank Werner Mehrdad Ahmadi Kamarposhti Ilhami Colak El Manaa Barhoumi 《Computer Modeling in Engineering & Sciences》 2025年第5期1519-1548,共30页
Reconfiguration,as well as optimal utilization of distributed generation sources and capacitor banks,are highly effective methods for reducing losses and improving the voltage profile,or in other words,the power quali... Reconfiguration,as well as optimal utilization of distributed generation sources and capacitor banks,are highly effective methods for reducing losses and improving the voltage profile,or in other words,the power quality in the power distribution system.Researchers have considered the use of distributed generation resources in recent years.There are numerous advantages to utilizing these resources,the most significant of which are the reduction of network losses and enhancement of voltage stability.Non-dominated Sorting Genetic Algorithm II(NSGA-II),Multi-Objective Particle Swarm Optimization(MOPSO),and Intersect Mutation Differential Evolution(IMDE)algorithms are used in this paper to perform optimal reconfiguration,simultaneous location,and capacity determination of distributed generation resources and capacitor banks.Three scenarios were used to replicate the studies.The reconfiguration of the switches,as well as the location and determination of the capacitor bank’s optimal capacity,were investigated in this scenario.However,in the third scenario,reconfiguration,and determining the location and capacity of the Distributed Generation(DG)resources and capacitor banks have been carried out simultaneously.Finally,the simulation results of these three algorithms are compared.The results indicate that the proposed NSGAII algorithm outperformed the other two multi-objective algorithms and was capable of maintaining smaller objective functions in all scenarios.Specifically,the energy losses were reduced from 211 to 51.35 kW(a 75.66%reduction),119.13 kW(a 43.54%reduction),and 23.13 kW(an 89.04%reduction),while the voltage stability index(VSI)decreased from 6.96 to 2.105,1.239,and 1.257,respectively,demonstrating significant improvement in the voltage profile. 展开更多
关键词 Distribution network reconfiguration energy losses distributed generations capacitor banks NSGAII
在线阅读 下载PDF
Reconfiguration and Optimal Positioning of Multiple-Point Capacitors in a High-Voltage Distribution Network Using the NSGAII
2
作者 Arouna Oloulade Richard Gilles Agbokpanzo +6 位作者 Maurel Richy Aza-Gnandji Hassane Ousseyni Ibrahim Moussa Gonda Eméric Tokoudagba Juliano Sétondji François-Xavier Fifatin Adolphe Moukengue Imano 《Open Journal of Applied Sciences》 2025年第2期501-516,共16页
The distribution networks sometimes suffer from excessive losses and voltage violations in densely populated areas. The aim of the present study is to improve the performance of a distribution network by successively ... The distribution networks sometimes suffer from excessive losses and voltage violations in densely populated areas. The aim of the present study is to improve the performance of a distribution network by successively applying mono-capacitor positioning, multiple positioning and reconfiguration processes using GA-based algorithms implemented in a Matlab environment. From the diagnostic study of this network, it was observed that a minimum voltage of 0.90 pu induces a voltage deviation of 5.26%, followed by active and reactive losses of 425.08 kW and 435.09 kVAR, respectively. Single placement with the NSGAII resulted in the placement of a 3000 kVAR capacitor at node 128, which proved to be the invariably neuralgic point. Multiple placements resulted in a 21.55% reduction in losses and a 0.74% regression in voltage profile performance. After topology optimization, the loss profile improved by 65.08% and the voltage profile improved by 1.05%. Genetic algorithms are efficient and effective tools for improving the performance of distribution networks, whose degradation is often dynamic due to the natural variability of loads. 展开更多
关键词 RECONFIGURATION capacitor bank NSGA II Dynamic Network Degradation Distribution Network Reliability
在线阅读 下载PDF
Simulation Research of Transient Over-voltage on High-voltage Shunt Capacitor Banks
3
作者 HU Quan-wei ZHOU Xing-xing +3 位作者 SI Wen-rong ZHANG Yang LI Jun-hao LI Yan-ming 《高压电器》 CAS CSCD 北大核心 2011年第9期37-43,共7页
With the development of power systems,a large number of shunt capacitors are used to improve power quality in the distribution network.The shunt capacitor banks are operated much frequently,as a result,the capacitor b... With the development of power systems,a large number of shunt capacitors are used to improve power quality in the distribution network.The shunt capacitor banks are operated much frequently,as a result,the capacitor banks will bear large numbers of over-voltage inevitably.If the over-voltage exceeds certain amplitude,the capacitor will be damaged.This paper aims at the capacitor banks in the 35 kV side of Shanghai Xu-xing 500 kV substation,and applies ATP-EMTP to simulate the over-voltages generated by operating the switches under different angles of the source.Finally,according to the results of simulation and theoretical analysis,a best choice(i.e.angles of the source) to switch on capacitor banks is proposed.In this case the over-voltage on the capacitor will be limited to lowest. 展开更多
关键词 capacitor banks operating over-voltage EMTP SIMULATION
在线阅读 下载PDF
Effect of Switching Devices on Power Quality and Transient Voltage Suppression Using Capacitor Bank Model
4
作者 Isaac Kofi Mensah Prah Joseph Cudjoe Attachie 《Journal of Power and Energy Engineering》 2022年第5期77-89,共13页
The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is e... The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is exposed within the open which suggests they can be vulnerable to lightning strikes, road dwindling, windstorms, and a few engineering activities with the potential of causing different degrees of damage to the electrical equipment. One of the ways to guard the equipment is to deploy switching devices. However, the operations of most of these switching devices produce oscillatory transient in the electrical transmission and distribution systems which result in voltage, current, and frequency fluctuations in the load. This paper investigates the effect of switching devices on power quality and proposes a positive sequence voltage power transient suppression technique that can spontaneously improve the distorted voltage at the instant of capacitor switching using the capacitor line model as a case study. MATLAB/Simulink software was utilized for the analysis on an electrical network model with bus voltages of 69 kV/12.47 kV and 480 V. The results showed that, during switching operations, the positive sequence voltage power detector block produces ripple-free accurate results. 展开更多
关键词 capacitor banks Inrush Current Laplace Transform Power Quality Posi-tive Sequence SWITCHING Transient Voltage
在线阅读 下载PDF
Optimum Simultaneous Allocation of Renewable Energy DG and Capacitor Banks in Radial Distribution Network
5
作者 Sivasangari Rajeswaran Kamaraj Nagappan 《Circuits and Systems》 2016年第11期3556-3564,共10页
Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution network... Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail. 展开更多
关键词 Distributed Generation capacitor banks Real Power Loss Radial Distribution Network Distributed Generation Sitting Index WIPSO SADE
在线阅读 下载PDF
Design of Capacitor Bank in Parallel to Photovoltaic Power Plant
6
作者 A. Kalyuzhny B. Reshef +3 位作者 G.Yehuda G.David P. Koulbekov T. Day 《Journal of Energy and Power Engineering》 2014年第5期939-947,共9页
The purpose of the paper is to develop a solution for application of PV (photovoltaic) generators in MV (medium voltage) distribution system without unacceptable voltage changes due to drops of PV power output. Th... The purpose of the paper is to develop a solution for application of PV (photovoltaic) generators in MV (medium voltage) distribution system without unacceptable voltage changes due to drops of PV power output. The proposed solution includes operation of PV with predetermined leading power factor and addition of a capacitor bank in parallel to PV plant in order to compensate the reactive power absorbed by the PV inverters. The analytical expression of required power factor angle is derived. Adding a capacitor bank in parallel to PV power plant may pose a problem because of space limitations. The dimensions and cost of small MV capacitor banks depend significantly on the capacitor bank protection against internal faults. Application of the developed negative-sequence current difference method for the unbalance protection of the capacitor banks enables to achieve a compact and cost-reduced design of the banks connected in parallel to PV power plants. A real-world example of operation of the PV plant in parallel to the capacitor bank with the novel protection scheme is described. 展开更多
关键词 Photovoltaic power plant power quality capacitor bank unbalance protection.
在线阅读 下载PDF
并联电容器组干式空心电抗器匝间电弧性短路故障监测及保护 被引量:1
7
作者 翟雨佳 刘浩 +2 位作者 戴昀翔 贾跟卯 骆福权 《电气工程学报》 北大核心 2025年第3期290-299,共10页
在电网的无功补偿系统中,并联电容器组通常串联干式空心电抗器来抑制谐波放大和减小合闸涌流,但在电抗器发生匝间短路时,缺乏有效的保护方法导致故障不能及时切除直至烧毁。由于干式空心电抗器的匝间短路是一种电弧性短路,基于电抗器匝... 在电网的无功补偿系统中,并联电容器组通常串联干式空心电抗器来抑制谐波放大和减小合闸涌流,但在电抗器发生匝间短路时,缺乏有效的保护方法导致故障不能及时切除直至烧毁。由于干式空心电抗器的匝间短路是一种电弧性短路,基于电抗器匝间电弧性短路的周期性熄灭-重燃的故障特性,构建了电弧性短路模型。根据短路造成的不同电感变化率值进行研究,发现在电抗器发生电弧性匝间短路时,故障相中会激发出特定次数的谐波,并联电容器组中性点电压含有非常显著的谐波电压变化。根据数据分析,提出了基于中性点谐波电压含有率,并配合零序电压及基波电压变化特征来共同识别电抗器匝间短路的故障监测及保护方法。 展开更多
关键词 并联电容器组 干式空心电抗器 匝间电弧性短路 谐波电压含有率 故障监测及保护
在线阅读 下载PDF
串联电抗器接入对超高压断路器TRV的影响研究
8
作者 李珂 焦文耕 +2 位作者 卢波 徐伟 郭洁 《高压电器》 北大核心 2025年第12期90-96,共7页
在线路上加装串联电抗器是抑制短路电流的有效措施,但同时也对断路器瞬态恢复过电压(TRV)产生显著影响,会影响断路器的正常开断,进而影响系统的安全稳定运行。文中结合中国现有500 kV超高压线路串联电抗器工程,利用电磁暂态仿真软件EMTP... 在线路上加装串联电抗器是抑制短路电流的有效措施,但同时也对断路器瞬态恢复过电压(TRV)产生显著影响,会影响断路器的正常开断,进而影响系统的安全稳定运行。文中结合中国现有500 kV超高压线路串联电抗器工程,利用电磁暂态仿真软件EMTP-RV研究了不同工况下串联电抗器接入对断路器TRV的影响。研究结果表明:接入的串联电抗器参数、位置对TRV有重要影响,串入的电感量越大,TRV电压上升率越低;安装位置越靠近断路器,TRV上升率越大;线路长度对TRV上升率影响较小,引起的变化幅度在5%以内;在串联电抗器两端并联电容器可有效降低TRV上升率;断路器TRV最大电压峰值随安装位置、线路长度和串入电感量的变化呈非单调变化;并联电容对断路器TRV最大电压峰值影响较小,加装前后波动范围在3%以内。 展开更多
关键词 串联电抗器 短路电流 瞬态恢复电压 并联电容器
在线阅读 下载PDF
基于多时间尺度的风电场无功补偿装置协调控制研究
9
作者 王斌 王栓虎 张文慧 《自动化技术与应用》 2025年第5期52-56,共5页
以提升电网供电质量为目的,设计基于多时间尺度的风电场无功补偿装置协调控制方法。风电场功率预测模块利用神经网络预测风电功率,并将预测结果传输至电网调度模块与无功补偿装置协调控制模块;电网调度模块依据风电功率预测结果,设置未... 以提升电网供电质量为目的,设计基于多时间尺度的风电场无功补偿装置协调控制方法。风电场功率预测模块利用神经网络预测风电功率,并将预测结果传输至电网调度模块与无功补偿装置协调控制模块;电网调度模块依据风电功率预测结果,设置未来风电场的无功电压控制计划并传输至无功补偿装置协调控制模块;无功补偿装置协调控制模块,依据风电功率预测结果以及无功电压控制计划,从日内与日前两个时间尺度构建无功电压优化控制模型,从日前时间尺度(20 min),利用电容/电抗器组等大幅控制风电场无功电压,从日内时间尺度(15 ms),利用静止无功补偿器(static var compensator,SVC)补偿无功电压小幅波动。实验结果显示,该方法控制下,风电场无功储量提升,母线电压的稳定性与输出质量显著提升。 展开更多
关键词 多时间尺度 风电场 无功补偿装置 协调控制 无功电压 电容/电抗器组
在线阅读 下载PDF
电容器组操作中过电压与涌流的控制策略研究
10
作者 林强强 朱飞虎 +2 位作者 任科 曹亭亭 包文涛 《全面腐蚀控制》 2025年第8期235-237,共3页
本研究围绕电容器组分合闸时产生的过电压和涌流问题,提出了一系列抑制措施。首先,通过并联合闸电阻的方法来限制合闸时的过电压与涌流,有效降低了合闸冲击;其次,引入金属氧化物壁垒器(MOA)来抑制因重燃现象导致的过电压。研究中详细分... 本研究围绕电容器组分合闸时产生的过电压和涌流问题,提出了一系列抑制措施。首先,通过并联合闸电阻的方法来限制合闸时的过电压与涌流,有效降低了合闸冲击;其次,引入金属氧化物壁垒器(MOA)来抑制因重燃现象导致的过电压。研究中详细分析了避雷器的参数设计、保护效果对比以及接线方式对系统保护性能的影响;最后,针对电容器组的选相投切策略,提出了电容器投入和切除的优化方案,以减少系统运行中的不稳定因素。整体研究通过理论分析与仿真验证,确保了电容器组分合闸操作的安全性和可靠性。 展开更多
关键词 电容器组 分合闸 过电压 涌流
在线阅读 下载PDF
高压自愈式电容器及其装置性能、故障与应用的关键问题研究
11
作者 赵彦军 左强林 《电力电容器与无功补偿》 2025年第5期65-73,共9页
围绕干式自愈式电容器展开研究。从其关键特性出发,剖析击穿机理变化引发的问题,简述基膜与粗化膜粒料差异。基于金属化膜圆元件特性,分析卷绕张力对自愈能量影响,得出膜层间最大压强与元件直径成正比结论。针对导电极板薄致损耗大的特... 围绕干式自愈式电容器展开研究。从其关键特性出发,剖析击穿机理变化引发的问题,简述基膜与粗化膜粒料差异。基于金属化膜圆元件特性,分析卷绕张力对自愈能量影响,得出膜层间最大压强与元件直径成正比结论。针对导电极板薄致损耗大的特点,探讨成因,介绍油浸式全膜电容器“净化”位垒效应,分析其外壳温升高于油浸式的原因。依据热传导理论,分析干式电容器对壳绝缘及散热难题,建议降低对壳绝缘电压,对10kV级电容器装置提出分级绝缘设计,由绝缘平台承担系统绝缘水平。此外,分析温度、过压力等非电保护现存问题并提建议。针对电容无级变化特性,探讨内部故障保护问题,提出容衰与故障保护协同及安全容衰概念,依据IEC63210标准,建议以破坏性试验验证安全容衰可靠性。 展开更多
关键词 干式电容器 自愈式 高电压电容器装置 分级绝缘 安全容衰
在线阅读 下载PDF
特高压直流换流站电容器组不平衡电流测试方法优化
12
作者 王海龙 李翔宇 +2 位作者 常东旭 刘华臣 汪恒 《电工技术》 2025年第16期252-254,共3页
作为特高压直流输电换流站的重要组成部分,交流滤波器承担着换流站无功补偿和滤除谐波的作用,关系着特高压直流输电工程电能输送的稳定性。交流滤波器中配置了大量电容器,容易发生电容量超标、接头发热等故障缺陷,对此提出了一种不平衡... 作为特高压直流输电换流站的重要组成部分,交流滤波器承担着换流站无功补偿和滤除谐波的作用,关系着特高压直流输电工程电能输送的稳定性。交流滤波器中配置了大量电容器,容易发生电容量超标、接头发热等故障缺陷,对此提出了一种不平衡电流测试方法,以降低作业强度和风险。 展开更多
关键词 交流滤波器 电容器组 不平衡保护 电流测试方法
在线阅读 下载PDF
HVDC用斜撑塔电力电容器组加工和安装方法研究
13
作者 杨结春 龙玉萍 +3 位作者 秦华忠 蒋利军 黄桂发 王义 《电力电容器与无功补偿》 2025年第1期1-6,共6页
斜撑塔电力电容器组具有重心稳定、抗震性能高等优点,在HVDC中广泛应用。本文介绍了一种HVDC用斜撑塔电力电容器组加工和安装方法,针对斜撑塔电力电容器组的结构特点,通过对斜支座的加工方法、斜撑塔结构的加工装配方法以及斜撑塔电容... 斜撑塔电力电容器组具有重心稳定、抗震性能高等优点,在HVDC中广泛应用。本文介绍了一种HVDC用斜撑塔电力电容器组加工和安装方法,针对斜撑塔电力电容器组的结构特点,通过对斜支座的加工方法、斜撑塔结构的加工装配方法以及斜撑塔电容器组现场安装方法的研究,解决了斜撑塔电力电容器组加工和安装过程中的问题和困难,提高了加工和安装工作效率和准确率。工程应用证明,该方法能使斜撑塔电力电容器组生产加工和现场安装更为简单、方便和高效。 展开更多
关键词 HVDC 电力电容器组 斜撑塔 加工制造 方法
在线阅读 下载PDF
500kV变电站并联电容器补偿装置用大容量干式空心串联电抗器研制
14
作者 刘莉莉 刘水平 +3 位作者 刘涛 邵志强 张文军 张显明 《电力电容器与无功补偿》 2025年第4期58-64,共7页
干式空心串联电抗器是高压并联电容器补偿装置中的重要设备,用来抑制开关操作涌流,降低谐波对并联电容器组的危害。使用工况要求电抗器长期稳定、安全可靠运行,但高温会加速电抗器本体及外部防护的绝缘系统老化,导致运行可靠性降低,因... 干式空心串联电抗器是高压并联电容器补偿装置中的重要设备,用来抑制开关操作涌流,降低谐波对并联电容器组的危害。使用工况要求电抗器长期稳定、安全可靠运行,但高温会加速电抗器本体及外部防护的绝缘系统老化,导致运行可靠性降低,因此要采取合理的设计控制温升。本文主要介绍了所研制的产品结构,特别是降低线圈和汇流排的损耗设计研究,同时利用磁场、温度场的仿真手段对如何规避该类电抗器在以往设计及生产过程中遇到的问题采取了有效措施,并进行试验验证,为大容量干式空心串联电抗器设计与制造提供参考。 展开更多
关键词 空心串联电抗器 大容量 并联电容器 仿真 温升
在线阅读 下载PDF
特高压直流滤波器电容器组电场计算分析
15
作者 蒋利军 秦华忠 +2 位作者 熊勇 马维勇 黄有祥 《电力电容器与无功补偿》 2025年第3期30-36,共7页
随着高压直流输电技术的不断发展,特高压直流滤波器电容器组的运行可靠性逐渐成为关注的重点,其电场分布作为主要影响因素之一,需对表面电场强度进行研究验证。本文利用大型有限元分析软件ANSYS,建立某±800 kV换流站特高压直流滤... 随着高压直流输电技术的不断发展,特高压直流滤波器电容器组的运行可靠性逐渐成为关注的重点,其电场分布作为主要影响因素之一,需对表面电场强度进行研究验证。本文利用大型有限元分析软件ANSYS,建立某±800 kV换流站特高压直流滤波器电容器组的仿真模型,进行表面电场强度的仿真计算分析。通过电晕起始场强值与仿真计算值的比较,来判定电容器组是否会产生电晕放电。仿真计算显示电容器组各金属部件最大电场强度均小于起始场强值,电容器组不会产生电晕放电。结果表明各金属部件的最大电场强度均位于转角处,故可以通过调整转角处的曲率半径,优化各金属部件的电场强度。 展开更多
关键词 特高压直流输电 ±800 kV 直流滤波器 电容器组 电晕放电 有限元
在线阅读 下载PDF
双馈风机并网系统次同步振荡抑制研究
16
作者 姜健萍 施建强 徐梦溪 《电工技术》 2025年第4期53-57,共5页
双馈感应发电机(Doubly-Fed Induction Generator,DFIG)次同步控制交互事故会引发系统次同步振荡(Sub-Synchronous Oscillation,SSO),严重威胁到风电系统的安全可靠运行。为了解决此问题,首先对双馈风机建模,其次分析发生次同步振荡的原... 双馈感应发电机(Doubly-Fed Induction Generator,DFIG)次同步控制交互事故会引发系统次同步振荡(Sub-Synchronous Oscillation,SSO),严重威胁到风电系统的安全可靠运行。为了解决此问题,首先对双馈风机建模,其次分析发生次同步振荡的原因,提出一种阻尼控制和并联电容器组联合作用的控制策略,抵消负阻尼部分,降低输电线路上的串补度。在MATLAB/Simulink中进行仿真,对所提策略的有效性进行验证。 展开更多
关键词 双馈风机 次同步振荡 阻尼控制 并联电容器组
在线阅读 下载PDF
用于交流特高压并联电容器组的小变比油浸式电流互感器研制
17
作者 杨茜 刘水平 +3 位作者 周浪 杨硕亮 李宇 江世伟 《电力电容器与无功补偿》 2025年第1期78-82,共5页
在电力系统中,电流互感器主要用于电流测量、电能计量,与继电器配合对系统和设备进行过电流、过负荷保护。本文提出了一种特殊小变比电流互感器的设计方法,该方法能够满足小变比电流互感器的性能要求,并给出了设计实例,符合国家标准,满... 在电力系统中,电流互感器主要用于电流测量、电能计量,与继电器配合对系统和设备进行过电流、过负荷保护。本文提出了一种特殊小变比电流互感器的设计方法,该方法能够满足小变比电流互感器的性能要求,并给出了设计实例,符合国家标准,满足工程要求。 展开更多
关键词 电流互感器 并联电容器组 油纸绝缘 准确级 小变比
在线阅读 下载PDF
高海拔特高压交流工程用110 kV高压并联电容器装置关键问题研究
18
作者 陆居志 江兴考 龚蛟鹏 《灯与照明》 2025年第2期110-113,共4页
川渝特高压交流工程甘孜站海拔3 500 m、地震水平加速度0.4g,昼夜温差大,同时存在重覆冰等恶劣的运行环境。针对甘孜站高海拔地区高海拔、高抗震、大温差、重覆冰等因素,对电容器组进行了外绝缘修正、表面电场分布、结构抗震性能等问题... 川渝特高压交流工程甘孜站海拔3 500 m、地震水平加速度0.4g,昼夜温差大,同时存在重覆冰等恶劣的运行环境。针对甘孜站高海拔地区高海拔、高抗震、大温差、重覆冰等因素,对电容器组进行了外绝缘修正、表面电场分布、结构抗震性能等问题的研究,对电容器单元不同气压条件下电容器热平衡试验、不同气压下箱壳形变、高低温循环耐受密封性能和套管抗循环覆冰性能开展研究,高海拔用110 kV高压并联电容器装置以适应甘孜站高海拔、大温差和重覆冰的环境条件。研究为保障高海拔特高压交流工程安全提供参考。 展开更多
关键词 110 kV高压并联电容器组 特高压交流工程 高海拔 高低温循环
在线阅读 下载PDF
Verification of VVER-1200 NPP Simulator in Normal Operation and Reactor Coolant Pump Coast-Down Transient 被引量:3
19
作者 Le Dai Dien Do Ngoc Diep 《World Journal of Engineering and Technology》 2017年第3期507-519,共13页
Verification of operation parameters of VVER-1200 NPP Simulator installed at Nuclear Training Center, VINATOM has been performed. This simulator has been supplied for Vietnam in the framework of IAEA TC Project VIE201... Verification of operation parameters of VVER-1200 NPP Simulator installed at Nuclear Training Center, VINATOM has been performed. This simulator has been supplied for Vietnam in the framework of IAEA TC Project VIE2010 on Developing Nuclear Power Infrastructure—Phase II hosted by the Vietnam Atomic Energy Agency (VAEA). The comparison of the main parameters in nominal power operation with design data given in safety analysis report of VVER-1200/V392M as well as Ninh Thuan FSSAR is presented. In this study, the reactor coolant coast-down transient is investigated using the VVER-1200 NPP simulator. The simulated results performed in the simulator through switching off one reactor coolant pump in comparisons with experiment results performed in VVER-1000 reactor are given. The similarity between the measured and simulated results shows that the thermal hydraulic characteristics and the control protection systems are modeled in a reasonable way. A good agreement in operating parameters was found between the VVER-1200 NPP simulator and VVER-1200/V392M’s PSAR. 展开更多
关键词 SIMULATOR Human Machine Interfaces VVER Type reactor reactor COOLANT Pump Control Rod bank
暂未订购
Power loss reduction of distribution systems using BFO based optimal reconfiguration along with DG and shunt capacitor placement simultaneously in fuzzy framework 被引量:1
20
作者 M.Mohammadi A.Mohammadi Rozbahani S.Bahmanyar 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第1期90-103,共14页
In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is... In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system. 展开更多
关键词 network reconfiguration distributed generation (DG) capacitor banks fuzzy framework bacterial foragingoptimization
在线阅读 下载PDF
上一页 1 2 29 下一页 到第
使用帮助 返回顶部