期刊文献+
共找到3,336篇文章
< 1 2 167 >
每页显示 20 50 100
Optimal EOQ Model for Deteriorating Items Considering the Incremental Quantity Discounts and Shortages 被引量:1
1
作者 Zhou Yongwu Dept. of Math., Hefei University of Technology, 230009, P. R. China 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 1998年第1期16-23,共8页
In this present paper, a deterministic lot size model is developed for deteriorating items with incremental quantity discounts. It is assumed that shortages are permitted to occur and fully backlogged. A simple solut... In this present paper, a deterministic lot size model is developed for deteriorating items with incremental quantity discounts. It is assumed that shortages are permitted to occur and fully backlogged. A simple solution procedure is shown for determining the optimal order lot size and the optimal order cycle. A numerical example is used to illustrate how the solution procedure works. 展开更多
关键词 DETERIORATION Incremental quantity discount shortages.
在线阅读 下载PDF
Anticipated Actions to Reduce Energy Shortages in the Residential Sector
2
作者 Abdullah M. Al-Shaalan 《Energy and Power Engineering》 2018年第9期434-447,共14页
This study investigates the electric energy shortages impact upon the residential sector in Riyadh city, the capital of the Kingdom of Saudi Arabia (KSA) resulting from severe power outages. The results reveal the ext... This study investigates the electric energy shortages impact upon the residential sector in Riyadh city, the capital of the Kingdom of Saudi Arabia (KSA) resulting from severe power outages. The results reveal the extent of hardship and high costs the residential will suffer and endure. These outages occur and extend for longer durations. To mitigate these consequences, a method is suggested known as “willingness-to-pay” to seek the ability and willingness of consumers to pay to avert these power outages and energy shortages. Two approaches have been developed and utilized. The first one is based on a consumer survey to estimate his perceived costs. Outages occur in specific periods and last for longer durations. The second approach focussed on developing a mathematical model to complement the survey approach as this model can decrease the size of the problem complexity associated with consumer lack of experience in evaluating and assessing the worth of service reliability and quality. 展开更多
关键词 Energy shortages RESIDENTIAL SECTOR LOSSES SEVERE Power OUTAGES
暂未订购
Impact of Electricity Shortages on Productivity: Evidence from Manufacturing Industries
3
作者 Xinhong Xue Zhongcheng Wang 《Energy Engineering》 EI 2021年第4期995-1008,共14页
Electricity shortages present a significant constraint on manufacturers,who rely on electricity as an important input into production.In China,electricity supply has been growing rapidly.However,the rapid industrializ... Electricity shortages present a significant constraint on manufacturers,who rely on electricity as an important input into production.In China,electricity supply has been growing rapidly.However,the rapid industrialization sometimes makes the power supply still unable to meet the demand.Using a survey of 1673 Chinese manufacturing firms,this paper explores how firms response to electricity shortages and its impact on productivity.We find that self-generation of electricity and investment in Research and Development(R&D)have significant positive relationships with electricity shortages.Further investigations reveal that self-generation is the most common way to deal with electricity shortages.However,it aggravates productivity loss.Though investment in Research and Development can promote productivity,it cannot offset the negative impact of electricity shortages on productivity.Analyses on subsamples show heterogeneity in the impacts of electricity shortages across firms.In particular,large firms are more inclined to invest in R&D than small and medium-sized firms are.They are also the one who suffer significant productivity loss due to self-generation of electricity.Though it is possible for medium-sized firms to reduce productivity loss through R&D,they are not likely to invest in R&D as a response to electricity shortages.This study illustrates that firms can hardly have effective solutions to electricity shortages,and policy makers should take great efforts to increase electricity supply. 展开更多
关键词 Electricity shortages research and development PRODUCTIVITY electricity efficiency
在线阅读 下载PDF
An Analysis of the Impact of Stay-at-Home Measures on the Occurrence of Vaccine Shortages
4
作者   Nurunnahar 《Advances in Infectious Diseases》 CAS 2024年第2期411-441,共32页
COVID-19, a contagious respiratory disease, presents immediate and unforeseen challenges to people worldwide. Moreover, its transmission rapidly extends globally due to its viral transmissibility, emergence of novel s... COVID-19, a contagious respiratory disease, presents immediate and unforeseen challenges to people worldwide. Moreover, its transmission rapidly extends globally due to its viral transmissibility, emergence of novel strains (variants), absence of immunity, and human unawareness. This framework introduces a revised epidemic model, drawing upon mathematical principles. This model incorporates a modified vaccination and lockdown approach to comprehensively depict an epidemics transmission, containment, and decision-making processes within a community. This study aims to provide policymakers with precise information on real-world situations to assist them in making informed decisions about the implementation of lockdown strategies, maintenance variables, and vaccine availability. The suggested model has conducted stability analysis, strength number analysis, and first and second-order derivative analysis of the Lyapunov function and has established the existence and uniqueness of solutions of the proposed models. We examine the combined effects of an effective vaccination campaign and non-pharmaceutical measures such as lockdowns and states of emergency. We rely on the results of this research to assist policymakers in various countries in eradicating the illness by developing more innovative measures to control the outbreak. 展开更多
关键词 Epidemic Dynamics Non-Pharmaceuticals Interventions Vaccine Shortage Multi-Waving
在线阅读 下载PDF
Mitigating Energy Shortages in China
5
《China's Foreign Trade》 2022年第2期53-55,共3页
The recent electricity supply shortage in the People’s Republic of China(PRC)is driven by a disequilibrium in demand and supply.Energ y demand has picked up with the economy recovering and industry growing,strongly s... The recent electricity supply shortage in the People’s Republic of China(PRC)is driven by a disequilibrium in demand and supply.Energ y demand has picked up with the economy recovering and industry growing,strongly supported by solid merchandise export growth.At the same time,soaring coal prices have hit power producers curtailing growth in electricity supply. 展开更多
关键词 ELECTRICITY PRICES SHORTAGE
在线阅读 下载PDF
The Innovations and Shortages of the New Budget Law
6
《International English Education Research》 2015年第4期8-9,共2页
The introduction of the new budget law is one of the most important achievements of the construction of national legal system. It is a landmark event in building financial system. The new budget law has made a lot of ... The introduction of the new budget law is one of the most important achievements of the construction of national legal system. It is a landmark event in building financial system. The new budget law has made a lot of breakthroughs and innovations in the budget managemenL to lead direction for further deepen fiscal reform. However, the modification of the budget law can only adopt the principle of limited modification, there are still many problems. This paper discusses the innovation and deficiency of the new budget law under the background of budget law modification, and makes suggestions to further improve the budget law. 展开更多
关键词 new budget law INNOVATION SHORTAGE improve.
在线阅读 下载PDF
System Schema Analysis of County Economy Talents Shortages Based on the Perspective of Returning-home Entrepreneurship 被引量:1
7
作者 TU Guo-ping,XU Fen Department of Management Science,Nanchang University,Nanchang 330031,China 《Asian Agricultural Research》 2010年第5期5-9,共5页
According to the discussion of domestic scholars on county talents,we know that the researches concerning county human resources mainly focus on discussing the problems such as the total amount,distribution,quality an... According to the discussion of domestic scholars on county talents,we know that the researches concerning county human resources mainly focus on discussing the problems such as the total amount,distribution,quality and introduction of county talents though the analysis of coordination between talents and county economic development,and the research of relationship between industry adjustment and talents need.However,there have no relevant documents about the analysis and discussion of county talents problems based on system schema theory.In view of this reality,on the basis of the introduction of the system schema theory propounded by management guru Peter Senge,we conduct the feedback schema analysis of the restricted factors of talents shortages during county economic development;establish the growth limits schema of county talents system;analyze the functioning mechanism of the total amount,distribution,quality and introduction of county talents on the development of county economy;discuss the relationship between the individual quality,social relation and emotional need of returning-home start-up,and talents resource shortage;propose the countermeasures and suggestions to mitigate the shortage of county talents,in order to optimize the allocation of county human resources,and promote the county's economic development. 展开更多
关键词 COUNTY ECONOMY Growth limits SCHEMA Human RESOURCE
在线阅读 下载PDF
An Optimal Policy with Quadratic Demand, Three-Parameter Weibull Distribution Deterioration Rate, Shortages and Salvage Value
8
作者 Pandit Jagatananda Mishra Trailokyanath Singh Hadibandhu Pattanayak 《American Journal of Computational Mathematics》 2016年第3期200-211,共12页
The present paper focuses an optimal policy of an inventory model for deteriorating items with generalized demand rate and deterioration rate. Shortages are allowed and partially backlogged. The salvage value is inclu... The present paper focuses an optimal policy of an inventory model for deteriorating items with generalized demand rate and deterioration rate. Shortages are allowed and partially backlogged. The salvage value is included into deteriorated units. The main objective of the model is to minimize the total cost by optimizing the value of the shortage point, cycle length and order quantity. A numerical example is carried out to illustrate the model and sensitivity analyses of major parameters are discussed. 展开更多
关键词 EOQ Quadratic Demand Salvage Value SHORTAGE Three-Parameter Weibull Deterioration Rate
在线阅读 下载PDF
Analysis on Causes of Drug Shortages and Countermeasures
9
作者 Xiao Yao Sun Lihua 《Asian Journal of Social Pharmacy》 2021年第2期108-113,共6页
Objective To analyze the causes of drug shortages in China and put forward some countermeasures and suggestions accordingly.Methods Based on the relevant data of 14 provinces that issued the lists of drug shortages fr... Objective To analyze the causes of drug shortages in China and put forward some countermeasures and suggestions accordingly.Methods Based on the relevant data of 14 provinces that issued the lists of drug shortages from 2018 to 2020,377 kinds of drugs were sorted out first,and then the features of shortage were analyzed descriptively.Finally,the degree and causes of shortage were studied based on field investigation and literature summary.Results and Conclusion Among the drugs in short supply across the country,69.2%of them were listed in the National Medical Insurance Catalogue,37.1%were essential drugs and 26.5%were low-price drugs.They were used for different diseases,and most were for treating nervous system and blood system.There were many reasons for drug shortages.For instance,any problems in supply chain(production,circulation,use)could lead to drug shortages,of which the production accounted for the largest proportion.This paper puts forward targeted measures to solve drug shortages from the aspects of unwillingness and inability of manufacturing enterprises in their production. 展开更多
关键词 drug shortage status quo CAUSE COUNTERMEASURE
暂未订购
Enlightenment and Suggestions on the Construction of Information Platform and Processing Mechanism of Drug Shortages in Developed Countries to China
10
作者 Cui Li Xing Hua 《Asian Journal of Social Pharmacy》 2023年第2期177-186,共10页
Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Ag... Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Agency(EMA),Health Canada(HC)and National Health Commission,the good experience of the United States,the European Union and Canada in the construction of information platform and processing mechanism of drug shortages was summarized for reference in China.Results and Conclusion China has initially established the processing mechanism of drug shortages,but the platform construction should be improved,and the information disclosure of drug shortages varies from province to province.We should improve the information platform of drug shortages,strengthen the disclosure and communication of information,enrich the processing tools and measures after the drug shortages occurs,and strengthen the cooperation with relevant associations and other non-governmental departments. 展开更多
关键词 drug shortage CONSTRUCTION information platform processing mechanism
暂未订购
Water Shortages in China's Cities
11
作者 DENG SHULIN 《China Today》 1994年第4期44-47,共4页
"Water,woater evenyuwhere,and nary a drop to drink!"Poetry becomes reality in China,as experts scramble to find new supplies of the preious liquid to slake the thirst of a growing population and industry.
关键词 Water shortages in China’s Cities
在线阅读 下载PDF
能源供需失衡的衡量及其对经济增长的影响 被引量:2
12
作者 王蕾 王振霞 尚梦飞 《学习与探索》 北大核心 2025年第3期128-139,176,共13页
能源安全事关经济社会发展全局。在系统总结能源安全定义的基础上,本文运用机器学习方法,构建了包含供求、低碳和清洁等含义的综合性指标,以全面地衡量能源供给短缺和供求失衡。实证结果显示,在综合考虑低碳和清洁要求后,我国面临较为... 能源安全事关经济社会发展全局。在系统总结能源安全定义的基础上,本文运用机器学习方法,构建了包含供求、低碳和清洁等含义的综合性指标,以全面地衡量能源供给短缺和供求失衡。实证结果显示,在综合考虑低碳和清洁要求后,我国面临较为严峻的能源安全形势。从省际层面看,2010—2021年面临能源短缺问题的省份数量增加至21个,短缺严重的省份主要集中在京津冀、珠三角和长三角等经济发达地区。从城市层面看,样本期内165个城市中,85个城市出现了程度不一的能源供需紧张情况。在此基础上,本文还检验了能源供给短缺与经济增长的关系,结果显示,频繁出现的能源供给短缺显著抑制经济增长。为此,在新能源逐步取代传统能源的转型过渡期,尽可能保持能源供给稳定对保障经济持续高质量增长具有重要意义。 展开更多
关键词 能源安全 能源短缺 机器学习 经济增长
在线阅读 下载PDF
教师队伍建设的全球图景与中国选择——基于联合国教科文组织《全球教师报告》的分析 被引量:3
13
作者 吴晶 郑煣于 李廷洲 《中国教育学刊》 2025年第1期14-21,共8页
面向2030年可持续发展目标,全球中小学教师数量缺口超四千万,且存在年龄、性别、城乡、学科等结构性短缺。在补充合格师资的过程中,世界各国面临教师职业吸引力、教师专业能力建设、师资公平配置、教师发展数字化转型等挑战。中国已建... 面向2030年可持续发展目标,全球中小学教师数量缺口超四千万,且存在年龄、性别、城乡、学科等结构性短缺。在补充合格师资的过程中,世界各国面临教师职业吸引力、教师专业能力建设、师资公平配置、教师发展数字化转型等挑战。中国已建成世界上规模最大的教师队伍,在价值引领、能力建设、资源配置、地位提升等方面形成了中国特色的教师发展道路。为打造支撑教育强国的高素质专业化教师队伍,结合全球教师发展形势,中国应注重政策参与,提升教师在决策制定中的话语权;强调协同合作,让教师成为高度协作性的职业;关注终身学习,倡导教师持续性的专业发展;坚持资源投入,持续改善教师的地位待遇。 展开更多
关键词 全球教师报告 教师队伍建设 全球图景 教师教育体系
原文传递
英国血液紧缺应对计划主要内容介绍(三):红细胞紧缺应对计划
14
作者 郭瑾 王鸿捷 +1 位作者 郭永建 王勇 《中国输血杂志》 2025年第11期1650-1658,共9页
本文作为介绍“英国血液紧缺应急计划”系列文章第三部分,详细介绍了《红细胞紧缺应对计划》的编制情况和全文内容,主要包括在红细胞4种供应状态下应采取的行动框架和各项行动措施。着重阐述了血液应急管理安排计划(emergency blood man... 本文作为介绍“英国血液紧缺应急计划”系列文章第三部分,详细介绍了《红细胞紧缺应对计划》的编制情况和全文内容,主要包括在红细胞4种供应状态下应采取的行动框架和各项行动措施。着重阐述了血液应急管理安排计划(emergency blood management arrangements,EBMA)的制定与实施,输血适应证,血液紧缺的影响和监测以及恢复血液供应阶段的工作内容。并通过引用附录内容,对上述内容进行了列举。 展开更多
关键词 血液 血液紧缺 红细胞紧缺 血液应急管理 输血适应证
原文传递
英国血液紧缺应对计划主要内容(四):全国性血液供应严重紧缺期间大出血患者输血分诊与血液分配指引
15
作者 郭瑾 王鸿捷 +1 位作者 郭永建 王勇 《中国输血杂志》 2025年第12期1812-1816,共5页
本文作为介绍“英国血液紧缺应急计划”系列文章第四部分,详细介绍了《全国性血液供应严重紧缺期间大出血患者输血分诊与血液分配指引》的编制情况和全文内容。主要包括:明确了“大出血”的定义,提出了紧急血液管理安排计划的启动与实... 本文作为介绍“英国血液紧缺应急计划”系列文章第四部分,详细介绍了《全国性血液供应严重紧缺期间大出血患者输血分诊与血液分配指引》的编制情况和全文内容。主要包括:明确了“大出血”的定义,提出了紧急血液管理安排计划的启动与实施程序,并介绍了预计需要大量输血患者血液分配应急决策框架,同时阐述了输血分诊流程以及输血分诊患者的再次评估的方法等内容,并通过引用附录内容,对上述内容进行了列举。特别是提出了输血患者分诊的伦理准则,对我国制定有关政策和相应措施提供了可以借鉴的原则。本文作为“英国血液紧缺应对计划主要内容”系列文章的最后一篇,对整个系列的文章进行了总结,提出国家层面的统一规划、跨机构的紧密协作、专业委员会的深度参与以及基于循证医学的临床实践,是构建一个能够抵御各种冲击、始终守护患者生命的血液应急管理体系不可或缺的支柱。对于正致力于完善自身血液应急管理体系的我国而言,英国的经验在系统架构、法制建设、专业委员会运作和标准化流程方面,尤其具有深刻的启示和借鉴意义。 展开更多
关键词 血液紧缺 红细胞紧缺 大出血 血液应急管理 血液分配
原文传递
基于缺货延时双重损失的应急物资配送路径选择研究
16
作者 苏兵 陈相文 +5 位作者 张萌 姬浩 孙璐璐 徐阳 郭清娥 Lin Guohui 《中国管理科学》 北大核心 2025年第8期209-217,共9页
针对带时间窗的紧缺应急物资配送路径选择问题,综合考虑每个需求点的需求量和配送时间要求,提出需求点最大缺货延时双重损失定义,并以单个需求点最大缺货延时双重损失费用最小为目标,建立应急物资配送路径选择模型。对于配送车辆充足的... 针对带时间窗的紧缺应急物资配送路径选择问题,综合考虑每个需求点的需求量和配送时间要求,提出需求点最大缺货延时双重损失定义,并以单个需求点最大缺货延时双重损失费用最小为目标,建立应急物资配送路径选择模型。对于配送车辆充足的情形,设计时间复杂性为O(n^(3))的精确算法A*进行求解,其中n为需求点数;对于配送车辆不足的情形,设计时间复杂性为O(Ln^(2))的近似算法GA^(*)进行求解,其中L和n分别为车辆数和需求点数,并分析算法GA^(*)的近似比。最后结合实例进行分析,验证模型及算法的有效性。 展开更多
关键词 应急物资紧缺 配送时间窗 路径选择问题 缺货延时双重损失 近似算法
原文传递
“三孩”政策背景下幼儿体育发展相关问题的思考
17
作者 孟庆光 王永顺 《成都体育学院学报》 北大核心 2025年第4期28-35,共8页
研究通过梳理中华人民共和国不同发展阶段生育政策下幼儿体育的演进历程,提出“三孩”政策实施后幼儿体育的发展目标,并着眼于当下幼儿体育发展的困境,提出了纾解路径。研究认为,当前我国幼儿体育发展面临着时间与空间短缺,家庭经济负... 研究通过梳理中华人民共和国不同发展阶段生育政策下幼儿体育的演进历程,提出“三孩”政策实施后幼儿体育的发展目标,并着眼于当下幼儿体育发展的困境,提出了纾解路径。研究认为,当前我国幼儿体育发展面临着时间与空间短缺,家庭经济负担过重,科学性亟待提升等困境;并提出拓展幼儿体育的时间与空间,持续发展普惠性幼儿体育,优化老、幼群体的体医融合,促进幼儿体育科学化等纾解路径,以此加快幼儿体育的发展,提高幼儿保育质量,提升家庭生育意愿,助力“三孩”政策。 展开更多
关键词 幼儿体育 “三孩”政策 生育支持 幼儿健康 照顾短缺
在线阅读 下载PDF
北宋钱荒的再认识:基于商品流通的考察
18
作者 徐东升 《厦门大学学报(哲学社会科学版)》 北大核心 2025年第2期107-115,共9页
北宋钱荒是指引起产品或商品以及劳务不能正常转化为铜钱的货币缺乏,因发生在以江淮浙为核心的东南地区而具有区域性,因其影响存在着明显的阶层之间的差别而具有阶层性。东南地区经济发达,有条件向其他地区大量输出商品以换取铜钱,这是... 北宋钱荒是指引起产品或商品以及劳务不能正常转化为铜钱的货币缺乏,因发生在以江淮浙为核心的东南地区而具有区域性,因其影响存在着明显的阶层之间的差别而具有阶层性。东南地区经济发达,有条件向其他地区大量输出商品以换取铜钱,这是其面对中央财政对铜钱不断增加的索取还能保持经济持续发展的秘密所在。但受运销成本、商品输出地与输入地物价差变动的影响,商品运销的预期收益不断变动,决定了东南地区商品输出量不稳定,铜钱输入量也不稳定,这是东南地区钱荒产生的根本原因。 展开更多
关键词 北宋 钱荒 商品流通
在线阅读 下载PDF
英国血液紧缺应对计划主要内容介绍(一):英国应急管理体系概况
19
作者 郭瑾 郭永建 +1 位作者 王鸿捷 王勇 《中国输血杂志》 2025年第6期861-866,共6页
血液作为重要的资源,直接关系到患者生命健康和医疗业务活动连续性,鉴于其只能来自献血者的自愿捐赠,容易因外界各种因素影响而处于供应紧缺状态。本文作为介绍“英国血液紧缺应急计划”系列文章第一部分,旨在对英国应急管理体系,尤其... 血液作为重要的资源,直接关系到患者生命健康和医疗业务活动连续性,鉴于其只能来自献血者的自愿捐赠,容易因外界各种因素影响而处于供应紧缺状态。本文作为介绍“英国血液紧缺应急计划”系列文章第一部分,旨在对英国应急管理体系,尤其是卫生应急管理的情况进行概述。本文阐述了英国的应急管理法规标准体系和机制体制、关于应急准备与实施指导意见的非法规性指导文件、以及负责应急协调与合作的跨部门多机构的地方韧性联席会议制度、英国政府能力建设、有关应急响应主体和应急指挥控制机制等内容;在此基础上,本文进一步详细介绍了英国卫生应急体系的法律基础和国家医疗服务体系(national health service,NHS)应急准备、韧性和响应(emergency preparedness,resilience and response,EPRR)核心标准体系,并列举了相应文件。 展开更多
关键词 血液 血液紧缺 应急管理 韧性 卫生应急
原文传递
基于DEMATEL-ISM的煤矿结构性缺员微观机制研究
20
作者 汪文生 姜润发 《煤炭工程》 北大核心 2025年第8期196-202,共7页
煤矿员工的下井意愿低已经成为微观层面煤矿结构性缺员的重要原因。基于DEMATEL-ISM方法,结合马斯洛需求层次论,从生理、安全、社交归属、尊重和自我实现5个需求层次分析了影响煤矿员工下井意愿的因素,通过专家打分构建影响矩阵,分析各... 煤矿员工的下井意愿低已经成为微观层面煤矿结构性缺员的重要原因。基于DEMATEL-ISM方法,结合马斯洛需求层次论,从生理、安全、社交归属、尊重和自我实现5个需求层次分析了影响煤矿员工下井意愿的因素,通过专家打分构建影响矩阵,分析各因素的影响度、被影响度、中心度和原因度,并得出影响因素的层级结构。研究表明:煤矿员工下井意愿受到12个因素的影响,可进一步归类为一个三阶递阶层次模型,其中职业前景有限是核心影响因素,井下待遇低或不公平并不是影响员工下井意愿的绝对因素;煤矿企业需要更加细致的了解员工需求,更多关注煤矿员工的井下工作体验、工作满意度和职业发展,这是微观视角下煤矿企业提高员工下井意愿的关键。 展开更多
关键词 矿工 井下缺员 地面冗员 结构性缺员 下井意愿
在线阅读 下载PDF
上一页 1 2 167 下一页 到第
使用帮助 返回顶部