On the basis of the vector diffraction theory and Green's function method, this paper investigates the effects of refractive index mismatch on second-harmonic generation (SHG) microscopy. The polarization distribut...On the basis of the vector diffraction theory and Green's function method, this paper investigates the effects of refractive index mismatch on second-harmonic generation (SHG) microscopy. The polarization distribution and SHG intensity are calculated as functions of the sample radius and probe depth. The numerical results show that refractive index mismatch can result in peak intensity degradation, increase secondary lobes and extension of second- harmonic polarization distribution. Because of the attenuation of polarization intensity, the detected SHG intensity significantly decreases with increasing probe depth, which can limit the imaging depth of SHG microscopy inside thick samples. Forward SHG intensity decays slowly than backward SHG, due to the combination of extension second-harmonic polarization distribution and strong dependency of forward SHG on sample radius.展开更多
The complex amplitude distribution which can compensate for the spherical aberration caused by mismatch on lnterthce between recording material and immersion material (air) on three-dimensional optical storage syste...The complex amplitude distribution which can compensate for the spherical aberration caused by mismatch on lnterthce between recording material and immersion material (air) on three-dimensional optical storage system is derived analytically and numerically. Comparison between two approaches is made. It is also shown how the depth of recording layer and position of reference plane are related to the phase distribution at reference plane and how the mismatch can be resolved by using a pure phase element.展开更多
5G基站、分布式光伏(distributed photovoltaic,DPV)等分布式资源大规模参与配电网经济与电能质量等多目标优化调度,致使配电网调控模型决策变量复杂、求解时间慢等问题凸显。为此,提出一种考虑5G基站调控潜力和多资源协同的配电网分层...5G基站、分布式光伏(distributed photovoltaic,DPV)等分布式资源大规模参与配电网经济与电能质量等多目标优化调度,致使配电网调控模型决策变量复杂、求解时间慢等问题凸显。为此,提出一种考虑5G基站调控潜力和多资源协同的配电网分层分区优化方法。首先,考虑5G基站通信流量波动特性,建立计及闲置荷电状态(state of charge,SOC)约束的5G基站调控潜力模型。基于此,再建立配电网分层分区优化模型。上层以配电网综合效益最优为目标进行集中式调度,从而确定配电网分组投切电容器组、静止无功发生器等自身资源的动作方案。下层为分区调度,结合电压-功率灵敏度和考虑5G基站通信负荷的源荷不匹配度指标进行配电网物理分区,建立面向5G基站闲置SOC和DPV剩余容量的配电网分区协调优化模型,并采用二阶锥规划和同步型交替方向乘子法相结合的混合算法进行求解。最后,以改进的IEEE33节点配电网为算例,分析验证了所提方法的有效性。结果表明,所提方法能够提高配电网调控模型的求解能力,并提升配电网经济性和电压质量。展开更多
文摘On the basis of the vector diffraction theory and Green's function method, this paper investigates the effects of refractive index mismatch on second-harmonic generation (SHG) microscopy. The polarization distribution and SHG intensity are calculated as functions of the sample radius and probe depth. The numerical results show that refractive index mismatch can result in peak intensity degradation, increase secondary lobes and extension of second- harmonic polarization distribution. Because of the attenuation of polarization intensity, the detected SHG intensity significantly decreases with increasing probe depth, which can limit the imaging depth of SHG microscopy inside thick samples. Forward SHG intensity decays slowly than backward SHG, due to the combination of extension second-harmonic polarization distribution and strong dependency of forward SHG on sample radius.
文摘The complex amplitude distribution which can compensate for the spherical aberration caused by mismatch on lnterthce between recording material and immersion material (air) on three-dimensional optical storage system is derived analytically and numerically. Comparison between two approaches is made. It is also shown how the depth of recording layer and position of reference plane are related to the phase distribution at reference plane and how the mismatch can be resolved by using a pure phase element.
文摘5G基站、分布式光伏(distributed photovoltaic,DPV)等分布式资源大规模参与配电网经济与电能质量等多目标优化调度,致使配电网调控模型决策变量复杂、求解时间慢等问题凸显。为此,提出一种考虑5G基站调控潜力和多资源协同的配电网分层分区优化方法。首先,考虑5G基站通信流量波动特性,建立计及闲置荷电状态(state of charge,SOC)约束的5G基站调控潜力模型。基于此,再建立配电网分层分区优化模型。上层以配电网综合效益最优为目标进行集中式调度,从而确定配电网分组投切电容器组、静止无功发生器等自身资源的动作方案。下层为分区调度,结合电压-功率灵敏度和考虑5G基站通信负荷的源荷不匹配度指标进行配电网物理分区,建立面向5G基站闲置SOC和DPV剩余容量的配电网分区协调优化模型,并采用二阶锥规划和同步型交替方向乘子法相结合的混合算法进行求解。最后,以改进的IEEE33节点配电网为算例,分析验证了所提方法的有效性。结果表明,所提方法能够提高配电网调控模型的求解能力,并提升配电网经济性和电压质量。