During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for c...During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for cracks with opening less than 1 cm, the cracked slope was compacted with added effort to eliminate cracks; for cracks with opening greater than 1 cm , crack grouting was carried out . The practice demonstrated the treatment was successful. Careful analysis of the relation between sectionalized filling and crack emergence is of significance in guiding the construction design and drawing out filling plan for a high CFRD.展开更多
Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overb...Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overburden layer.The deep overburden layer causes uneven settlement between the overburden layer and the dam,which poses a serious threat to the safety of both the construction and operation of the dam.In this study,microseismic(MS)monitoring technology was employed for the firsttime in the fieldof dam fillingengineering,allowing for the real-time monitoring of microfracture in the bedrock during dam construction.The time-frequency analysis method was used to summarize the MS waveform characteristics induced by dam filling.The fracture mechanism of bedrock was revealed,and the relationships among slope deformation,dam settlement,and MS activity were analyzed.The following research results have been obtained.The MS signal induced by dam fillinghas low energy and amplitude,short duration,and high frequency.The fracture of the bedrock was mainly shear failure.MS monitoring can predict deformation during blasting excavation and capture the large settlement that may occur during dam fillingin advance.Research findingshave demonstrated the significantapplication value of MS monitoring technology in predicting the risk of dam settlement and provide a reference for similar projects.展开更多
Due to a large number of high concrete face rockfill dams(CFRDs) being constructed, the seismic safety is crucially important and seismic performance assessment must be performed for such dams. Fragility analysis is a...Due to a large number of high concrete face rockfill dams(CFRDs) being constructed, the seismic safety is crucially important and seismic performance assessment must be performed for such dams. Fragility analysis is a method of great vitality for seismic performance assessment; it can intuitively forecast the structural effects of different ground motion intensities and provide an effective path for structure safety assessment. However, this method is rarely applied in the field of high earth dam risk analysis.This paper introduces fragility analysis into the field of high CFRD safety assessment and establishes seismic performance assessment methods. PGA, Sa(T1, 5%), PGV and PGD are exploited as the earthquake intensity measure(IMs). Relative settlement ratio of dam crest, cumulative sliding displacement of dam slope stability and a new face-slab destroying index(based on DCR and COD) are regarded as the dam damage measures(DMs). The dividing standards of failure grades of high CFRDs are suggested based on each DM. Fragility function is estimated according to incremental dynamic analysis(IDA) and multiple stripes analysis(MSA) methods respectively from a large number of finite element calculations of a certain CFRD, and seismic fragility curves are determined for each DM. Finally, this study analyzes the failure probabilities of the dam under different earthquake intensities and can provide references and bases for the seismic performance design and safety risk assessment of high CFRDs.展开更多
文摘During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for cracks with opening less than 1 cm, the cracked slope was compacted with added effort to eliminate cracks; for cracks with opening greater than 1 cm , crack grouting was carried out . The practice demonstrated the treatment was successful. Careful analysis of the relation between sectionalized filling and crack emergence is of significance in guiding the construction design and drawing out filling plan for a high CFRD.
基金support from the Joint Funds of the National Natural Science Foundation of China(Grant No.42177143)the National Natural Science Foundation of China(Grant No.U23A2060).
文摘Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overburden layer.The deep overburden layer causes uneven settlement between the overburden layer and the dam,which poses a serious threat to the safety of both the construction and operation of the dam.In this study,microseismic(MS)monitoring technology was employed for the firsttime in the fieldof dam fillingengineering,allowing for the real-time monitoring of microfracture in the bedrock during dam construction.The time-frequency analysis method was used to summarize the MS waveform characteristics induced by dam filling.The fracture mechanism of bedrock was revealed,and the relationships among slope deformation,dam settlement,and MS activity were analyzed.The following research results have been obtained.The MS signal induced by dam fillinghas low energy and amplitude,short duration,and high frequency.The fracture of the bedrock was mainly shear failure.MS monitoring can predict deformation during blasting excavation and capture the large settlement that may occur during dam fillingin advance.Research findingshave demonstrated the significantapplication value of MS monitoring technology in predicting the risk of dam settlement and provide a reference for similar projects.
基金supported by the National Key Research and Development Program of China(Grant No.2017YFC0404904)the National Natural Science Foundation of China(Grant Nos.51679029,51508071 and 51779034)
文摘Due to a large number of high concrete face rockfill dams(CFRDs) being constructed, the seismic safety is crucially important and seismic performance assessment must be performed for such dams. Fragility analysis is a method of great vitality for seismic performance assessment; it can intuitively forecast the structural effects of different ground motion intensities and provide an effective path for structure safety assessment. However, this method is rarely applied in the field of high earth dam risk analysis.This paper introduces fragility analysis into the field of high CFRD safety assessment and establishes seismic performance assessment methods. PGA, Sa(T1, 5%), PGV and PGD are exploited as the earthquake intensity measure(IMs). Relative settlement ratio of dam crest, cumulative sliding displacement of dam slope stability and a new face-slab destroying index(based on DCR and COD) are regarded as the dam damage measures(DMs). The dividing standards of failure grades of high CFRDs are suggested based on each DM. Fragility function is estimated according to incremental dynamic analysis(IDA) and multiple stripes analysis(MSA) methods respectively from a large number of finite element calculations of a certain CFRD, and seismic fragility curves are determined for each DM. Finally, this study analyzes the failure probabilities of the dam under different earthquake intensities and can provide references and bases for the seismic performance design and safety risk assessment of high CFRDs.