To improve the safety of construction workers and help workers remotely control humanoid robots in construc-tion,this study designs and implements a computer vision based virtual construction simulation system.For thi...To improve the safety of construction workers and help workers remotely control humanoid robots in construc-tion,this study designs and implements a computer vision based virtual construction simulation system.For this pur-pose,human skeleton motion data are collected using a Ki-nect depth camera,and the obtained data are optimized via abnormal data elimination,smoothing,and normalization.MediaPipe extracts three-dimensional hand motion coordi-nates for accurate human posture tracking.Blender is used to build a virtual worker and site model,and the virtual worker motion is controlled based on the quaternion inverse kinematics algorithm while limiting the joint angle to en-hance the authenticity of motion simulation.Experimental results show that the system frame rate is stable at 60 frame/s,end-to-end delay is less than 20 ms,and virtual task comple-tion time is close to the real scene,verifying its engineering applicability.The proposed system can drive virtual work-ers to perform tasks and provide technical support for con-struction safety training.展开更多
Presented is an experimental study on the performance of an oil-gas multiphase transportation system, especially on the multiphase flow patterns, multiphase pumping and multiphase metering of the system. A dynamic sim...Presented is an experimental study on the performance of an oil-gas multiphase transportation system, especially on the multiphase flow patterns, multiphase pumping and multiphase metering of the system. A dynamic simulation analysis is conducted to deduce simulation parameters of the system and similarity criteria under simplified conditions are obtained. The reliability and feasibility of two-phase flow experiment with oil and natural gas simulated by water and air are discussed by using the similarity criteria.展开更多
The filling construction of permeable geosynthetic tubes is considered.First,an analytical approach is developed to determine the internal pressure,tension and shape of the cross section of a geosynthetic tube based o...The filling construction of permeable geosynthetic tubes is considered.First,an analytical approach is developed to determine the internal pressure,tension and shape of the cross section of a geosynthetic tube based on its volume.An analytical solution for the drainage rate of the tube is then derived.The course of the filling construction is divided into several time intervals and the volume of the tube after each interval is obtained from the equilibrium of flow calculated from the drainage rate and filling rate.The validity of our analytical approach is tested by comparing our results with previously published experimental result.The results of this comparison indicate that our method is applicable for simulating the filling construction of permeable geosynthetic tubes.展开更多
Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulati...Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.展开更多
Urban construction land has relatively high human activity and high carbon emissions.Research on urban construction land prediction under carbon peak and neutrality goals(hereafter“dual carbon”goals)is important for...Urban construction land has relatively high human activity and high carbon emissions.Research on urban construction land prediction under carbon peak and neutrality goals(hereafter“dual carbon”goals)is important for territorial spatial planning.This study analyzed quantitative relationships between carbon emissions and urban construction land,and then modified the construction land demand prediction model.Thereafter,an integrated model for urban construction land demand prediction and spatial pattern simulation under“dual carbon”goals was developed,where urban construction land suitability was modified based on carbon source and sink capacity of different land-use types.Using Guangzhou as a case study,the integrated model was validated and applied to simulate the spatiotemporal dynamics of its urban construction land during 2030–2060 under baseline development and“dual carbon”goals scenarios.The simulation results showed that Guangzhou’s urban construction land expanded rapidly until 2030,with the spatial pattern not showing an intensive development trend.Guangzhou’s urban construction land expansion slowed during 2030–2060,with an average annual growth rate of 0.2%,and a centralized spatial pattern trend.Under the“dual carbon”goal scenario,Guangzhou’s urban construction land evolved into a polycentric development pattern in 2030.Compared with the baseline development scenario,urban construction land expansion in Guangzhou during 2030–2060 is slower,with an average annual growth rate of only 0.1%,and the polycentric development pattern of urban construction land was more prominent.Furthermore,land maintenance and growth,that is,a carbon sink,is more obvious under the“dual carbon”goals scenario,with the forest land area nearly 10.6%higher than that under the baseline development scenario.The study of urban construction land demand prediction and spatial pattern simulation under“dual carbon”goals provides a scientific decision-making support tool for territorial spatial planning,aiding in quantifying territorial spatial planning.展开更多
Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav...Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.展开更多
The structures and elasticities of phase B silicates with different water and iron(Fe) content are obtained by firstprinciples simulation to understand the effects of water and Fe on their properties under high pres...The structures and elasticities of phase B silicates with different water and iron(Fe) content are obtained by firstprinciples simulation to understand the effects of water and Fe on their properties under high pressure.The lattice constants a and b decrease with increasing water content.On the contrary,c increases with increasing water content.On the other hand,the b and c decrease with increasing Fe content while a increases with increasing Fe content.The decrease of M(metal)–O octahedral volume is greater than the decrease of SiO polyhedral volume over the same pressure range.The density,bulk modulus and shear modulus of phase B increase with increasing Fe content and decrease with increasing water content.The compressional wave velocity(Vp) and shear wave velocity(Vs) of phase B decrease with increasing water and Fe content.The comparisons of density and wave velocity between phase B silicate and the Earth typical structure provide the evidence for understanding the formation of the X-discontinuity zone of the mantle.展开更多
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u...A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.展开更多
Overheating of the engine, the transmission and the hydraulic device is a problem when the construction machinery works on plateau. To solve this problem, we proposed an electro-controlled hydraulic driving fan coolin...Overheating of the engine, the transmission and the hydraulic device is a problem when the construction machinery works on plateau. To solve this problem, we proposed an electro-controlled hydraulic driving fan cooling system (ECHDFCS). The system was applied to a 50-wheel loader. We carried out the coolant temperature simulation using fluid modeling software FLOWMASTER, followed by laboratory experiments and road tests. The results show that ECHDFCS can adjust the cooling capability of the system automatically based on machine heat dissipation requirements. The coolant temperature is consequently remained within an appropriate range. The simulation results are consistent with the experiment results when the experiment is performed on the plain, but are different from the road tests in some investigated parameters on the plateau.展开更多
For its complexity, engineering construction schedule design is limited by various factors.Simulation-based engineering construction schedule takes critical path method (CPM) network as frame and calls complex cyclic ...For its complexity, engineering construction schedule design is limited by various factors.Simulation-based engineering construction schedule takes critical path method (CPM) network as frame and calls complex cyclic operation network (CYCLONE) simulation model enclosed in advance for its simulation nodes. CYCLONE simulation model takes charge of simulating stochastic duration of activity and efficiency of resources, while CPM model performs project scheduling. This combination avoids the shortcomings of both models. Furthermore, geographic information system (GIS) technique is utilized to visualize the construction processes which are otherwise difficult to be understood by static results described. Application in practical project verifies the feasibility and advantage of the technique.展开更多
This study first analyzes four distinct forms of Fujian folk dance,highlighting the notable differences in their cultural characteristics and dance qualities.It then categorizes these dance forms to align with textboo...This study first analyzes four distinct forms of Fujian folk dance,highlighting the notable differences in their cultural characteristics and dance qualities.It then categorizes these dance forms to align with textbook construction,discussing in depth the principles guiding the development of textbooks that correspond to these classifications.展开更多
0 INTRODUCTION In recent years,modern railways have been actively under construction in the complex mountainous area of Southwest China.However,rockfall poses a significant threat to both construction and operation ph...0 INTRODUCTION In recent years,modern railways have been actively under construction in the complex mountainous area of Southwest China.However,rockfall poses a significant threat to both construction and operation phases of railway projects(Yan et al.,2023;Chen et al.,2022;Fanos and Pradhan,2018).展开更多
Hardware in the loop simulation (HILS) has been investigated in the field of the multibody dynamics (MBD), which combined the MBD simulation with the actual mechanical system. The fast simulation is necessary for ...Hardware in the loop simulation (HILS) has been investigated in the field of the multibody dynamics (MBD), which combined the MBD simulation with the actual mechanical system. The fast simulation is necessary for the HILS system in order to require the real time simulation. This paper presents a fast simulation technique using the domain decomposition method with the iteration in the flexible multibody system in which flexible linkage system and electro-hydraulic drive system are coupled with each other. C 2013 The Chinese Society of Theoretical and Applied Mechanics.[doi:10.1063/2.1301301]展开更多
The rational construction of active targeting liposomes will provide an important structural support for its effective brain targeting.However,there is no clear understanding of the structure-activity relationship of ...The rational construction of active targeting liposomes will provide an important structural support for its effective brain targeting.However,there is no clear understanding of the structure-activity relationship of active targeting liposomes.Combining multiscale computational simulation and experimental verification,we established a computational model of RVGP modified PEGylated liposomes(RVGP-PEG-L)and investigated the role of PEG and molecular interaction mechanism of carrier-ligand-receptor.The result indicated that the complex network conformation formed by PEG with 42 monomers(42 PEG)above the density of 8%was the molecular basis for PEG-L to achieve long-circulation function.The lowest monomer number of PEG linker to ensure the targeting ability of RVGP was 42.However,the pose of RVGP binding to nAChR changed after it was linked with PEG-L due to the restraint of PEG chain,leading to a decrease of binding free energy.Increasing the monomer number of PEG linker or improving the non-polarity of polymers was a potential strategy to enhance the combination of RVGP-PEG-L with nAChR on the targeting cell.展开更多
Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall funct...Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama.展开更多
Most current object-oriented programming courses offered by domestic colleges and universities generally focus on the object-oriented programming language itself,i.e.,the programming grammar of the language,but ignore...Most current object-oriented programming courses offered by domestic colleges and universities generally focus on the object-oriented programming language itself,i.e.,the programming grammar of the language,but ignore the design pattern.However,design patterns are essential to software engineering because they can solve common problems in software design and improve code reuse,readability,extensibility,and reliability.Our Object-oriented Software Construction Course is creative since it aims at cultivating students’object-oriented thinking as well as basic abilities required to construct high-quality,object-oriented software.Specifically,we exploit the 5E teaching principle during the education of this course,and present the whole pipeline in the paper.We also provide one case of the factory pattern to further demonstrate the implementation of the 5E teaching principle in the course.The effect of the 5E teaching principle has also been demonstrated.展开更多
There are frequent failures in the project delivery in time and increasing the waste in Oman construction industry.Lean Construction(LC)principles which are lean thinking in design and construction process may be a po...There are frequent failures in the project delivery in time and increasing the waste in Oman construction industry.Lean Construction(LC)principles which are lean thinking in design and construction process may be a possible solution.Hence,the paper is aimed on exploring the status of the LC practices and its impact on Omani Construction Industry(OCI).The paper presents barriers,potential benefits,and the measures of suitability and acceptability of LC principles.A quantitative research approach was adopted and research data was collected using an online questionnaire survey in Oman.The data were analysed and results are presented in tables and charts followed by critical discussions.The survey found that onethird of the construction professionals have a good awareness and half of them having a higher level awareness about LC practices.More than one third of the construction organisations are adopting LC principles with a high consensus on the suitability and acceptability,and they recognised that time commitment is necessary for the successful implementation and achieve benefits.The study concludes that the reduction in project delivery time and construction at site waste is the key advantage of implementing LC priciples in design and construction stages in the omani construction industry.展开更多
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
The Riyadh metro project is one of the current megaprojects that aim to improve the transit systems in Saudi Arabia.It consists of several metro lines with a total length of 176 km and 85 stations.The viaducts are con...The Riyadh metro project is one of the current megaprojects that aim to improve the transit systems in Saudi Arabia.It consists of several metro lines with a total length of 176 km and 85 stations.The viaducts are considered as one of the main construction elements in the metro lines.Four methods for viaducts construction have been used in the Riyadh metro project:precast beam,full span launching method,cast on-site,and segment method(precast segment method and BCM(balanced cantilever method)).The viaducts work consumes a large portion of a project’s time and cost.Furthermore,the competitive nature of the construction industry increases the need to improve the efficiency of construction performance.Accordingly,this paper takes the initial steps toward increasing the efficiency of viaduct construction methods through simulation.Simulation of construction processes provides a systematic tool that can be used for determining the resources,time,and cost of these processes.The simulation processes should focus on the main activities affecting this element’s execution for viaducts construction,such as segment storage,handling,transporting,and installation.This study highlights the viaducts construction methods and develops general discrete-event simulation models for the most commonly used viaducts construction methods in the Riyadh metro using AnyLogic simulation software.The simulation models visualize and capture the interaction between the different activities and resources in a viaduct construction.Consequently,the construction drawbacks can be identified.Furthermore,the simulation model can be manipulated by adding assumptions to develop more efficient construction methods in terms of time and cost in such projects.展开更多
The first-principles calculations based on density functional theory combined with cluster expansion techniques and Monte Carlo (MC) simulations were used to study the phase diagrams of both wurtzite (WZ) and zinc...The first-principles calculations based on density functional theory combined with cluster expansion techniques and Monte Carlo (MC) simulations were used to study the phase diagrams of both wurtzite (WZ) and zinc-blende (ZB) Cdl_xZnxS alloys. All formation energies are positive for WZ and ZB Cdl-xZnxS alloys, which means that the Cdl-xZnxS alloys are unstable and have a tendency to phase separation. For WZ and ZB Cdl_xZnxS alloys, the consolute temperatures are 655 K and 604 K, respectively, and they both have an asymmetric miscibility gap. We obtained the spatial distributions of Cd and Zn atoms in WZ and ZB Cd0.sZn0.sS alloys at different temperatures by MC simulations. We found that both WZ and ZB phases of Cdo.sZn0.sS alloy exhibit phase segregation of Cd and Zn atoms at low temperature, which is consistent with the phase diagrams.展开更多
基金The Eighth National “Ten Thousand Talents Plan for Top Young Talents” of Chinathe National Natural Science Foundation of China (No. 52478117, 52378120)。
文摘To improve the safety of construction workers and help workers remotely control humanoid robots in construc-tion,this study designs and implements a computer vision based virtual construction simulation system.For this pur-pose,human skeleton motion data are collected using a Ki-nect depth camera,and the obtained data are optimized via abnormal data elimination,smoothing,and normalization.MediaPipe extracts three-dimensional hand motion coordi-nates for accurate human posture tracking.Blender is used to build a virtual worker and site model,and the virtual worker motion is controlled based on the quaternion inverse kinematics algorithm while limiting the joint angle to en-hance the authenticity of motion simulation.Experimental results show that the system frame rate is stable at 60 frame/s,end-to-end delay is less than 20 ms,and virtual task comple-tion time is close to the real scene,verifying its engineering applicability.The proposed system can drive virtual work-ers to perform tasks and provide technical support for con-struction safety training.
基金9~(th) 5-year plan key project of the Chinese Academy of Sciences(KZ951-A1-405),NSFC(59476041)National 863 High Technology Youth Foundation(820-Q-013)
文摘Presented is an experimental study on the performance of an oil-gas multiphase transportation system, especially on the multiphase flow patterns, multiphase pumping and multiphase metering of the system. A dynamic simulation analysis is conducted to deduce simulation parameters of the system and similarity criteria under simplified conditions are obtained. The reliability and feasibility of two-phase flow experiment with oil and natural gas simulated by water and air are discussed by using the similarity criteria.
基金Project (No. KYJD09036) supported by the Fundamental Research Funds for the Central Universities,China
文摘The filling construction of permeable geosynthetic tubes is considered.First,an analytical approach is developed to determine the internal pressure,tension and shape of the cross section of a geosynthetic tube based on its volume.An analytical solution for the drainage rate of the tube is then derived.The course of the filling construction is divided into several time intervals and the volume of the tube after each interval is obtained from the equilibrium of flow calculated from the drainage rate and filling rate.The validity of our analytical approach is tested by comparing our results with previously published experimental result.The results of this comparison indicate that our method is applicable for simulating the filling construction of permeable geosynthetic tubes.
基金Project supported by the Research Grant Council of Hong Kong,China
文摘Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.
基金National Natural Science Foundation of China,No.41971233。
文摘Urban construction land has relatively high human activity and high carbon emissions.Research on urban construction land prediction under carbon peak and neutrality goals(hereafter“dual carbon”goals)is important for territorial spatial planning.This study analyzed quantitative relationships between carbon emissions and urban construction land,and then modified the construction land demand prediction model.Thereafter,an integrated model for urban construction land demand prediction and spatial pattern simulation under“dual carbon”goals was developed,where urban construction land suitability was modified based on carbon source and sink capacity of different land-use types.Using Guangzhou as a case study,the integrated model was validated and applied to simulate the spatiotemporal dynamics of its urban construction land during 2030–2060 under baseline development and“dual carbon”goals scenarios.The simulation results showed that Guangzhou’s urban construction land expanded rapidly until 2030,with the spatial pattern not showing an intensive development trend.Guangzhou’s urban construction land expansion slowed during 2030–2060,with an average annual growth rate of 0.2%,and a centralized spatial pattern trend.Under the“dual carbon”goal scenario,Guangzhou’s urban construction land evolved into a polycentric development pattern in 2030.Compared with the baseline development scenario,urban construction land expansion in Guangzhou during 2030–2060 is slower,with an average annual growth rate of only 0.1%,and the polycentric development pattern of urban construction land was more prominent.Furthermore,land maintenance and growth,that is,a carbon sink,is more obvious under the“dual carbon”goals scenario,with the forest land area nearly 10.6%higher than that under the baseline development scenario.The study of urban construction land demand prediction and spatial pattern simulation under“dual carbon”goals provides a scientific decision-making support tool for territorial spatial planning,aiding in quantifying territorial spatial planning.
基金Supported by National Natural Science Foundation of China(No.90815019)National Key Basic Research Program of China("973" Program,No.2007CB714101)Key Project in the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period(No.2006BAB04A13)
文摘Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.
基金Project supported by the Science Fund from the Key Laboratory of Earthquake Prediction,Institute of Earthquake Science,China Earthquake Administration(Grant No.2016IES010104)the National Natural Science Foundation of China(Grant Nos.41174071,41273073,41373060,and 41573121)
文摘The structures and elasticities of phase B silicates with different water and iron(Fe) content are obtained by firstprinciples simulation to understand the effects of water and Fe on their properties under high pressure.The lattice constants a and b decrease with increasing water content.On the contrary,c increases with increasing water content.On the other hand,the b and c decrease with increasing Fe content while a increases with increasing Fe content.The decrease of M(metal)–O octahedral volume is greater than the decrease of SiO polyhedral volume over the same pressure range.The density,bulk modulus and shear modulus of phase B increase with increasing Fe content and decrease with increasing water content.The compressional wave velocity(Vp) and shear wave velocity(Vs) of phase B decrease with increasing water and Fe content.The comparisons of density and wave velocity between phase B silicate and the Earth typical structure provide the evidence for understanding the formation of the X-discontinuity zone of the mantle.
基金Scientific and Technological Support and Guidance Plan Projects of Zhejiang Province(Grant No.2008C23019)
文摘A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.
基金Funded by the Innovation Foundation of Guangzhou, P. R. China (No. 2005V42C0021)
文摘Overheating of the engine, the transmission and the hydraulic device is a problem when the construction machinery works on plateau. To solve this problem, we proposed an electro-controlled hydraulic driving fan cooling system (ECHDFCS). The system was applied to a 50-wheel loader. We carried out the coolant temperature simulation using fluid modeling software FLOWMASTER, followed by laboratory experiments and road tests. The results show that ECHDFCS can adjust the cooling capability of the system automatically based on machine heat dissipation requirements. The coolant temperature is consequently remained within an appropriate range. The simulation results are consistent with the experiment results when the experiment is performed on the plain, but are different from the road tests in some investigated parameters on the plateau.
基金Supported by National Natural Science Foundation of China( No. 50179023).
文摘For its complexity, engineering construction schedule design is limited by various factors.Simulation-based engineering construction schedule takes critical path method (CPM) network as frame and calls complex cyclic operation network (CYCLONE) simulation model enclosed in advance for its simulation nodes. CYCLONE simulation model takes charge of simulating stochastic duration of activity and efficiency of resources, while CPM model performs project scheduling. This combination avoids the shortcomings of both models. Furthermore, geographic information system (GIS) technique is utilized to visualize the construction processes which are otherwise difficult to be understood by static results described. Application in practical project verifies the feasibility and advantage of the technique.
文摘This study first analyzes four distinct forms of Fujian folk dance,highlighting the notable differences in their cultural characteristics and dance qualities.It then categorizes these dance forms to align with textbook construction,discussing in depth the principles guiding the development of textbooks that correspond to these classifications.
基金supported by the Open Research Fund of Key Laboratory of Geological Hazards on Three Gorges Reservoir Area(China Three Gorges University),Ministry of Education(No.2022KDZ03)the Science and Technology Projects of Yunnan Provincial Science and Technology Department(No.202401AT070328)+1 种基金the Young talents project of“Xingdian Talent Support Program”in Yunnan Province(No.YNWR-QNBJ-2020-019)the Fund Project of China Academy of Railway Sciences Co.,Ltd.(No.2021YJ178)。
文摘0 INTRODUCTION In recent years,modern railways have been actively under construction in the complex mountainous area of Southwest China.However,rockfall poses a significant threat to both construction and operation phases of railway projects(Yan et al.,2023;Chen et al.,2022;Fanos and Pradhan,2018).
文摘Hardware in the loop simulation (HILS) has been investigated in the field of the multibody dynamics (MBD), which combined the MBD simulation with the actual mechanical system. The fast simulation is necessary for the HILS system in order to require the real time simulation. This paper presents a fast simulation technique using the domain decomposition method with the iteration in the flexible multibody system in which flexible linkage system and electro-hydraulic drive system are coupled with each other. C 2013 The Chinese Society of Theoretical and Applied Mechanics.[doi:10.1063/2.1301301]
基金National Natural Science Foundation of China(Grant No.81202469)
文摘The rational construction of active targeting liposomes will provide an important structural support for its effective brain targeting.However,there is no clear understanding of the structure-activity relationship of active targeting liposomes.Combining multiscale computational simulation and experimental verification,we established a computational model of RVGP modified PEGylated liposomes(RVGP-PEG-L)and investigated the role of PEG and molecular interaction mechanism of carrier-ligand-receptor.The result indicated that the complex network conformation formed by PEG with 42 monomers(42 PEG)above the density of 8%was the molecular basis for PEG-L to achieve long-circulation function.The lowest monomer number of PEG linker to ensure the targeting ability of RVGP was 42.However,the pose of RVGP binding to nAChR changed after it was linked with PEG-L due to the restraint of PEG chain,leading to a decrease of binding free energy.Increasing the monomer number of PEG linker or improving the non-polarity of polymers was a potential strategy to enhance the combination of RVGP-PEG-L with nAChR on the targeting cell.
基金Supported by Natural Science Fund ation for Major Research Plan of China (No.90815019)National Natural Science Foundation of China (No.50879053)National Key Project of Scientific and Technical Supporting Programs Funded by Ministry of Science and Technology of China (No.2006BAB04A13)
文摘Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama.
基金supported by Guangdong Hardware and System Teaching and Research Office(Quality Engineeringproject No.HITSZERP22002)+2 种基金Guangdong Province Education Science Planning Project(Higher Education Project,Project No.2022GXJK431)Harbin Institute of Technology(Shenzhen)Course Ideological and Political Project(Project No.HITSZIP21003)Construction Project of Teachers College of Harbin Institute of Technology(Shenzhen)(Project No.HITSZSFXY202201)。
文摘Most current object-oriented programming courses offered by domestic colleges and universities generally focus on the object-oriented programming language itself,i.e.,the programming grammar of the language,but ignore the design pattern.However,design patterns are essential to software engineering because they can solve common problems in software design and improve code reuse,readability,extensibility,and reliability.Our Object-oriented Software Construction Course is creative since it aims at cultivating students’object-oriented thinking as well as basic abilities required to construct high-quality,object-oriented software.Specifically,we exploit the 5E teaching principle during the education of this course,and present the whole pipeline in the paper.We also provide one case of the factory pattern to further demonstrate the implementation of the 5E teaching principle in the course.The effect of the 5E teaching principle has also been demonstrated.
文摘There are frequent failures in the project delivery in time and increasing the waste in Oman construction industry.Lean Construction(LC)principles which are lean thinking in design and construction process may be a possible solution.Hence,the paper is aimed on exploring the status of the LC practices and its impact on Omani Construction Industry(OCI).The paper presents barriers,potential benefits,and the measures of suitability and acceptability of LC principles.A quantitative research approach was adopted and research data was collected using an online questionnaire survey in Oman.The data were analysed and results are presented in tables and charts followed by critical discussions.The survey found that onethird of the construction professionals have a good awareness and half of them having a higher level awareness about LC practices.More than one third of the construction organisations are adopting LC principles with a high consensus on the suitability and acceptability,and they recognised that time commitment is necessary for the successful implementation and achieve benefits.The study concludes that the reduction in project delivery time and construction at site waste is the key advantage of implementing LC priciples in design and construction stages in the omani construction industry.
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘The Riyadh metro project is one of the current megaprojects that aim to improve the transit systems in Saudi Arabia.It consists of several metro lines with a total length of 176 km and 85 stations.The viaducts are considered as one of the main construction elements in the metro lines.Four methods for viaducts construction have been used in the Riyadh metro project:precast beam,full span launching method,cast on-site,and segment method(precast segment method and BCM(balanced cantilever method)).The viaducts work consumes a large portion of a project’s time and cost.Furthermore,the competitive nature of the construction industry increases the need to improve the efficiency of construction performance.Accordingly,this paper takes the initial steps toward increasing the efficiency of viaduct construction methods through simulation.Simulation of construction processes provides a systematic tool that can be used for determining the resources,time,and cost of these processes.The simulation processes should focus on the main activities affecting this element’s execution for viaducts construction,such as segment storage,handling,transporting,and installation.This study highlights the viaducts construction methods and develops general discrete-event simulation models for the most commonly used viaducts construction methods in the Riyadh metro using AnyLogic simulation software.The simulation models visualize and capture the interaction between the different activities and resources in a viaduct construction.Consequently,the construction drawbacks can be identified.Furthermore,the simulation model can be manipulated by adding assumptions to develop more efficient construction methods in terms of time and cost in such projects.
基金supported by the National Natural Science Foundation of China(Grant Nos.11164014 and 11364025)Gansu Science and Technology Pillar Program,China(Grant No.1204GKCA057)
文摘The first-principles calculations based on density functional theory combined with cluster expansion techniques and Monte Carlo (MC) simulations were used to study the phase diagrams of both wurtzite (WZ) and zinc-blende (ZB) Cdl_xZnxS alloys. All formation energies are positive for WZ and ZB Cdl-xZnxS alloys, which means that the Cdl-xZnxS alloys are unstable and have a tendency to phase separation. For WZ and ZB Cdl_xZnxS alloys, the consolute temperatures are 655 K and 604 K, respectively, and they both have an asymmetric miscibility gap. We obtained the spatial distributions of Cd and Zn atoms in WZ and ZB Cd0.sZn0.sS alloys at different temperatures by MC simulations. We found that both WZ and ZB phases of Cdo.sZn0.sS alloy exhibit phase segregation of Cd and Zn atoms at low temperature, which is consistent with the phase diagrams.