摘要 Under forced ventilation,the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model.The interfacial momentum transfers and the wall roughness in the wall function are considered.Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case.The geometric structure has a decisive effect on the airflow distribution.It is concluded that the dust concentration decreases gradually with the increase of the ventilation time.However,iso-concentration curves have the same tendency after 1 800 s.The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s.The prediction by the present model is confirmed by the experimental measurement by Nakayama. Under forced ventilation, the dust diffusion of underground powerhouse construction is investigated using a 3D high Reynolds number k-ε model. The interfacial momentum transfers and the wall roughness in the wall function are considered. Ventilation in the third layer of underground powerhouse of Xiangjiaba hydropower station is used as a case. The geometric structure has a decisive effect on the airflow distribution. It is concluded that the dust concentration decreases gradually with the increase of the ventilation time. However, iso-concentration curves have the same tendency after 1 800 s. The dust concentration meets the ventilation and dust-prevention health standard after 2 300 s. The prediction by the present model is confirmed by the experimental measurement by Nakayama.
出处 《Transactions of Tianjin University》 EI CAS 2009年第2期135-139,共5页 天津大学学报(英文版)
基金 Supported by Natural Science Fund ation for Major Research Plan of China (No.90815019) National Natural Science Foundation of China (No.50879053) National Key Project of Scientific and Technical Supporting Programs Funded by Ministry of Science and Technology of China (No.2006BAB04A13)
关键词 dust concentration construction ventilation numerical simulation underground powerhouse third layer 地下厂房 粉尘扩散 第三层 扩散模拟 施工 强制通风 向家坝水电站 粉尘浓度