0 INTRODUCTION Due to the sudden and highly destructive nature of slope rock collapse,developing effective early warning systems has become an urgent challenge in geotechnical engineering(Cai and Detournay,2024;Loew e...0 INTRODUCTION Due to the sudden and highly destructive nature of slope rock collapse,developing effective early warning systems has become an urgent challenge in geotechnical engineering(Cai and Detournay,2024;Loew et al.,2017).Traditional monitoring methods primarily target the acceleration stage preceding disasters(such as displacement monitoring for landslides and debris flows),which is effective for early warning of plastic collapse disasters but often inadequate for brittle failure modes(Walter et al.,2019;Chao et al.,2018;Crosta et al.,2017).展开更多
The Three Gorges Reservoir area hosts numerous high-risk columnar rock masses,but predicting their full-process of collapse dynamics in narrow-deep terrains remains challenging.This study investigated the Changdongzi ...The Three Gorges Reservoir area hosts numerous high-risk columnar rock masses,but predicting their full-process of collapse dynamics in narrow-deep terrains remains challenging.This study investigated the Changdongzi columnar dangerous rock mass(CCDRM)through field surveys and simulated its collapse dynamics with Material Point Method(MPM),and analyzed the collapse-diffusionsurge generation mechanisms.Field investigations revealed a 0.8 m-thick lotus-like extrusion structure at the base,severely degraded by cyclic water fluctuations,predisposing the rock mass to base-crushing failure.Numerical simulations indicate collapse velocities up to 42 m/s,amplified spreading with a 318 m deposition range and 11 m maximum thickness,and two major collisions causing 50%-60%velocity reduction.Gully topography buffers kinetic energy,retaining 5%debris on slopes and channeling 7%into the river.High-speed river impact generates a 20 m-diameter cavity,producing an 11 m surge,identifying the Guandukou Town waterfront 1.2 km downstream as a high-risk zone.These results clarify the collapse mechanisms of columnar dangerous rock mass and inform its hazard mitigation strategies.展开更多
基金supported by the National Key R&D Program of China(No.2023YFC3081400)the National Natural Science Foundation of China(No.41702371)+3 种基金the Open Fund Project of State Key Laboratory of Mining Response and Disaster Prevention in Deep Coal Mines(No.SKLMRDPC22KF13)the Supported by State key Laboratory of Mining Disaster Prevention and Control(Shandong University of Science and Technology),Ministry of Education(No.DPEPM202502)the Open Fund Research Project Supported by State Key Laboratory of Strata Intelligent Control and Green Mining Co-founded by Shandong Province and the Ministry of Science and Technology(No.SICGM202503)the Fund of Chongqing Key Laboratory of Facility Damage Mechanism and Protection in Highland Mountain Environment(No.LQ24KFJJ09)。
文摘0 INTRODUCTION Due to the sudden and highly destructive nature of slope rock collapse,developing effective early warning systems has become an urgent challenge in geotechnical engineering(Cai and Detournay,2024;Loew et al.,2017).Traditional monitoring methods primarily target the acceleration stage preceding disasters(such as displacement monitoring for landslides and debris flows),which is effective for early warning of plastic collapse disasters but often inadequate for brittle failure modes(Walter et al.,2019;Chao et al.,2018;Crosta et al.,2017).
基金supported by the Regional Innovation Development Joint Fund of the National Natural Science Foundation of China(U23A2045)the scientific research project of the Chongqing Municipal Bureau of Planning and Natural Resources(KJ-2023046)the scientific and technological project of the Hubei Provincial Bureau of Geological Survey(KJ2024-34)。
文摘The Three Gorges Reservoir area hosts numerous high-risk columnar rock masses,but predicting their full-process of collapse dynamics in narrow-deep terrains remains challenging.This study investigated the Changdongzi columnar dangerous rock mass(CCDRM)through field surveys and simulated its collapse dynamics with Material Point Method(MPM),and analyzed the collapse-diffusionsurge generation mechanisms.Field investigations revealed a 0.8 m-thick lotus-like extrusion structure at the base,severely degraded by cyclic water fluctuations,predisposing the rock mass to base-crushing failure.Numerical simulations indicate collapse velocities up to 42 m/s,amplified spreading with a 318 m deposition range and 11 m maximum thickness,and two major collisions causing 50%-60%velocity reduction.Gully topography buffers kinetic energy,retaining 5%debris on slopes and channeling 7%into the river.High-speed river impact generates a 20 m-diameter cavity,producing an 11 m surge,identifying the Guandukou Town waterfront 1.2 km downstream as a high-risk zone.These results clarify the collapse mechanisms of columnar dangerous rock mass and inform its hazard mitigation strategies.