摘要
结合某仓储库工程平房仓屋盖先张法预应力构件的施工特点 ,对其预制设施的施工工艺进行了优化和改进 ,较好地解决了施工中的实际问题 ,达到了降低费用、提高工效的目的。
Combined with the construction characteristics of pre-tensioned members in one storage work,according to the problems encountered in construction process pratical optimization and improvement are made for construction technology. Practice acquired good effects.
出处
《山西建筑》
2004年第11期61-62,共2页
Shanxi Architecture