摘要
通过超限车辆———主变压器运输车通过莆田枫亭桥的过桥方案及过桥时的临时加固方法的研究分析,认为,对施工中留有隐患的旧桥和实际受力状态难以确定的桥梁,宜采用实桥静载试验方法来直接测定其承载力;在超限车辆过桥时应制定相应措施加强管理。
This paper introduces the survey and experiment on an overload truck with a main transformer passing through Fengting Bridge, Putian, Fujian. At this base, the paper summarizes the approaches to tighten up the administering of overload trucks passing through highway bridges, and presents that a static load experimentation on real bridges can be performed to assess the bearing capacity of old bridges with hidden dangers in construction or the state of which when subjected to force is in suspect.
出处
《福建工程学院学报》
CAS
2004年第2期226-230,共5页
Journal of Fujian University of Technology
关键词
公路桥梁
超限车辆
静裁试验
承裁力
管理措施
highway bridges
overload trucks
static load experimentation
bearing capacity
administering measures