期刊文献+

关于机器随机故障完工时间方差最小化单机调度问题(英文) 被引量:2

On Minimizing Completion Time Variance on a Single Machine Subject to Stochastic Breakdowns
在线阅读 下载PDF
导出
摘要 讨论了机器随机故障时,工件完工时间方差的期望最小化单机调度问题,其中描述机器故障的计数过程为广义泊松过程.推导出了目标函数等价的确定形式,而后进一 步给出了工件加工时间相同时问题的最优解. This paper addresses a stochastic scheduling problem in which n jobs are to be processed on a single machine. The machine is subject to stochastic breakdowns, which is characterized by a generalized Poisson process. The objective is to find the job schedules to minimize the expected variance of completion times. The deterministic equivalent of the stochastic scheduling problem is developed. Moreover, optimal sequences are derived for the special case with identical processing times.
作者 贾春福
出处 《运筹学学报》 CSCD 北大核心 2004年第2期1-8,共8页 Operations Research Transactions
基金 This work is partly supported by the National Natural Sciences Foundation of China (Grant No.69674013) Tianjin Natural Sciences Foundation of China (Grant No. 013600711, 033800611).
关键词 运筹学 调度 单机 随机故障 完工时间方差 OR, scheduling, single machine, stochastic breakdowns, completion time variance
  • 相关文献

参考文献24

  • 1X. Cai. A solvable case of the variance minimization problem. Applied Mathematical Letters,1993, 6:97-100.
  • 2X. Cai. V-shaped property for job sequences that minimize the expected completion time variance. European Journal of Operational Research, 1996, 91:118-123.
  • 3X. Cai, T.C.E. Cheng. On the complexity of completion time variance minimization problem.Asia-Pacific Journal of Operational Research, 1993, 10:109-120.
  • 4X. Cai, F.S. Tu. Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties. Naval Research Logistics, 1996,43:1127-1146.
  • 5S. Eilon, I.C. Chowdhury. Minimizing the waiting time variance in the single machine problem.Management Science, 1977, 23:567-575.
  • 6A. Federgruen, G. Mosheiov. Single machine scheduling problems with general breakdowns,earliness and tardiness costs. Operation Research, 1977, 45:66-71.
  • 7W. Kubiak. Completion time variance minimization on a single machine is difficult. Operations Research Letters, 1993, 14:49-59.
  • 8A.G. Merten, M.E. Muller. Variance minimization in single machine sequencing problems. Management Science, 1972, 18:518-528.
  • 9J. Mittenthal, M. Raghavachari. Stochastic single machine scheduling with quadratic early-tardy penalties. Operations Research, 1993, 41:786-796.
  • 10V.S. Prasad, D.K. Manna. Minimization of expected variance of completion times on single machine for stochastic jobs. Naval Research Logistics, 1997, 44:97-108.

同被引文献2

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部