摘要
针对间歇生产过程柔性操作和动态变化的特征 ,提出综合应用基于知识的调度算法和多代理技术实现间歇生产过程智能调度的方法 ,建立间歇过程智能调度的结构模型 。
Aimed at the characteristic of batch process,flexibility and reactivity,this paper put forward a method of intelligent scheduling for batch process based on knowledge and multi-agent,and the framework of the intelligent scheduling has been built.The thinking and feasibility of the method proposed above have been explained by the intelligent scheduling of simulation research for a batch process.
出处
《化工自动化及仪表》
CAS
北大核心
2004年第3期14-16,共3页
Control and Instruments in Chemical Industry
基金
浙江省自然科学基金资助项目 (60 1 0 0 4 )
浙江省教育厅基金资助项目 (2 0 0 30 845)
关键词
多代理
生产调度
间歇生产
multi-agent
process scheduling
batch process