摘要
依据井点降水的机理 ,把工程造价最低作为目标函数 。
Based on the mechanism of well point dewatering, the lest engineering cost is used as objective function. Considering on the surface subsidence about the foundation, the optimum design of well point dewatering is researched in this paper.
出处
《西部探矿工程》
CAS
2004年第7期1-3,6,共4页
West-China Exploration Engineering
关键词
深基坑
井点降水
优化设计
地表沉降
工程造价
deep excavation pit
well point dewatering
optimum design
surface subsidence
engineering cost.