摘要
塔河油田S105井三开长裸眼井段钻遇长达255m的盐膏层,而且地层压力上低下高,为此,在钻至井深5100m时,应用承压堵漏技术对5100m以浅的裸眼段进行先期堵漏,使地层承压能力大大提高,整个盐膏层钻井过程顺利,仅漏失约20m3钻井液。详细介绍了该井承压堵漏的施工情况。
A 255m long carbonate zone is encountered while drill ing a long open hole in S105 Well in Tahe Oilfield, accompanied with severe fo r mation pore pressure variations. Therefore, the pressure sealing technology is e mployed to pre-block formations above 5100m while drilling to 5100m depth , whi c h increases greatly formation competence and thus a smooth drilling through the carbonate zone is obtained with only 20m^3 of mud loss. This paper introduces t he sealing operation in detail.
出处
《石油钻探技术》
CAS
2004年第2期65-66,共2页
Petroleum Drilling Techniques
关键词
塔河油田
承压堵漏技术
地层压力
裸眼
钻井液
承压能力
盐膏层
evaporite bed
formation pressure
resistance to pr essure
loss circulation control
pressure test
S105 Well