期刊文献+

降落伞充气时间的计算方法 被引量:9

Prediction Methods for Parachutes Filling Time
在线阅读 下载PDF
导出
摘要 文章介绍了各类降落伞充气时间的计算方法。对密致伞 ,将质量守恒方程与物 -伞系统的运动方程相结合推导出计算充气时间的数学模型并应用于一个算例。对开缝伞 ,提供了计算充气时间的经验公式。对采用收口技术的伞也提供了计算充气时间的经验公式。 This paper presented the methods for the calculation of parachute filling time. For solid-canopy parachutes, a theoretical model was developed. For reef parachutes and the parachutes with geometric porosity, some experiential formulas were presented to calculate filling time.
出处 《航天返回与遥感》 2004年第1期17-20,共4页 Spacecraft Recovery & Remote Sensing
关键词 降落伞 充气时间 计算方法 数学模型 开缝伞 收口技术 Filling time Solid-canopy parachutes Load-parachute system Parachutes with geometric porosity Reef technology Parachute
  • 相关文献

参考文献8

  • 1回收技术翻译组.气动力减速器原理及设计(上册)[M].国防工业出版社,1974..
  • 2E.G.尤因等.回收系统设计指南[M].航空工业出版社,1988..
  • 3张青斌,程文科,彭勇,秦子增.降落伞拉直过程的多刚体模型[J].中国空间科学技术,2003,23(2):45-50. 被引量:15
  • 4彭勇,张青斌,程文科,秦子增.降落伞初始充气阶段数值模拟[J].中国空间科学技术,2003,23(3):7-12. 被引量:10
  • 5o’Ham,F.Notes on the Opening Behavior and OpeningForces of Parachutes.Royal Aeronautical Society Journal,1949,53.
  • 6Fredette,R.O.Parachute Research Above Critical Aerodynamic Velocities.Cook Research Laboratories,1961.
  • 7Bern&,R.J,DeWeese,J.H.Filling Time Prediction Approach for Solid Cloth Type Parachute Canopies.AIAA-66-40592.1966.
  • 8回收技术翻译组.气动力减速器原理及设计(下册)[M].国防工业出版社,1974..

二级参考文献14

  • 1Mcvey D F, Wolf D F. Analysis of Deployment and Inflation of Large Ribbon Parachute. J. Aircraft, 1974, 11(2): 96-103.
  • 2Sundberg W D. Status Report: Parachute System Design, Analysis and Simulation Tool. AIAA 93-1208.
  • 3Purvis J W. Prediction of LineSail During Lines-First Deployment. AIAA 83-0370.
  • 4Moog P D. Aerodynamic Line Bowing Parachute Deployment. AIAA75-1381.
  • 5Srinivas E K, Modeling Issues Related to Retrieval Flexibale Tethered Satellite Systems. J. of Guidance Control and Dynamics, 1995, 18 (5): 1169-1176.
  • 6Huston R L, Kamman J W. A representation of fluid forces in finite segment cable models. Computer & Structure. 1981, 14 (4) 281-287.
  • 7Banerjee A K, Van N Do. Deployment Control of a Cable Connecting a Ship to an Underwater Vehicle. J. of Guidance control and Dynamics, 1994, 17 (6): 1327-1332.
  • 8Djerassi S, Bambergers H. Simultaneous Deployment of a Cable from Two Moving Platforms. J. of Guidance Control and Dynamics , 1998, 21 (2): 271-276.
  • 9Geoffrey F, Costello M. Improved Deployment Characteristics of Tether-Connected Munition Systems. J. of Guidance Control and Dynamics, 2001, 24 (3): 547-554.
  • 10Cheng Wenke. Dynamics and dyamic stability analysis of general parachute-load system, phD thesis, Nation University of Defense Techndogy, 2000.

共引文献23

同被引文献67

引证文献9

二级引证文献45

相关作者