期刊文献+

厚煤层错层位巷道布置采全厚采煤法的研究 被引量:44

Research on full-seam mining adopted roadway layout of stagger arrangement in thick coal seam
在线阅读 下载PDF
导出
摘要 为提高煤炭资源采出率与综合解决厚煤层全高开采的技术难题,依据理论研究与生产实际,用新的理念提出了一种厚煤层无煤柱开采的错层位巷道布置采全厚采煤法,该方法已经应用于煤层倾角0~25°,煤质松软或中硬,自然发火期3~6个月以上的条件,安全生产1a多.使用该方法能够提高煤炭采出率10%以上,提高巷道掘进速度1倍以上,降低掘进成本30%. To raise coal recovery ratio and solve the problems about full-seam mining in thick coal seam synthetically, presentsed a new full-seam mining method adopted the roadway layout of stagger arrangement without coal pillar according to theoretical study and mining practice. This method was safely used in the conditions of slope angle 0~25°, soft or medium hard coal and spontaneous combustion seam with the period over 3~6 months for more than a year. Adopting this method, coal recovery ratio can rise over 10% and roadway driving speed may increase over one times with its cost decreasing by 30%.
作者 赵景礼
出处 《煤炭学报》 EI CAS CSCD 北大核心 2004年第2期142-145,共4页 Journal of China Coal Society
基金 国家重点技术创新项目(国经贸2001[441号])
关键词 厚煤层 错层位 巷道布置 采出率 thick coal seam stagger arrangement roadway layout recovery ratio
  • 相关文献

参考文献9

  • 1吴健.综放开采15年回顾[J].矿山压力与顶板管理,1998,(3).
  • 2李云豪.[D].北京:中国矿业大学(北京校区),2003,41~50.
  • 3赵景礼 吴健.厚煤层错层位巷道布置采全厚采煤法[P].中国专利:ZL98100544.6.2002-01-23.
  • 4赵景礼.[D].北京:中国矿业大学(北京校区),1998.
  • 5布尔恰可夫A C 格林科H K 柯瓦里丘科A B.采矿工艺学[M].北京:煤炭工业出版社,1982.386~388.
  • 6靳钟铭.放顶煤开采理论与实践[M].北京:煤炭工业出版社,2001.253-254.
  • 7刘德民,康守昌.错层位巷道布置系统在放顶煤工作面开采中的应用[J].中州煤炭,2003(2):8-9. 被引量:5
  • 8赵景礼 孟宪锐.综放开采可持续发展的探索[J].矿山压力与顶板管理,1998,:29-31.
  • 9吴健,赵景礼.对当前放顶煤开采发展的几点看法(二)[J].煤,1997,6(4):17-18. 被引量:2

共引文献20

同被引文献394

引证文献44

二级引证文献351

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部