摘要
根据德兴铜矿的实际情况,对处于支配地位的人的因素与运输系统、大块率、铲装效率之间的关系进行了研究,论述了铲装效率的标定方法及对不同岩类的标定数据,最后讨论了影响铲装效率的各种因素。
Taking the reality of Dexing Copper Mine into account, the paper investigated the relations hip between personel act,which is a predominant factor, hauling system, boulder rate and shovel loading efficiency.Measuring method for shovel loading efficiency is described and the corresponding data for measuring various kinds of rock are listed in the paper. Finally, factors affecting shovel loading efficiency are discussed.