期刊文献+

大倾角煤层部分留顶煤锚杆支护技术研究 被引量:1

Research on partial upper coal bolting technology of big inclined coal seam
在线阅读 下载PDF
导出
摘要 根据倾斜煤层的条件,比较了大倾角煤层沿顶巷道施棚式支护和锚杆支护的优缺点。对部分顶煤进行受力分析,得出合理的留顶煤檐角。用悬吊理论设计了合理的支护参数,详细论述了施工工艺。顶板离层仪的监测结果显示,顶煤和顶板位移差较小,顶板活动稳定。实践证明,该支护技术取得了较好的技术、经济和社会效益。 According to the conditions of inclined coal seam, the advantages and disadvantages of bolting and shed supporting in big inclined coal seam tunneling along roof are compared. Analyzing the stress conditions of the partial upper coal seam, the rational angle of the remained upper coal is gotten. Reasonable support parameter based on hanging theory is designed, and then the construction steps are discussed. The monitoring results of separation devices showed that roof and remained coal had a little displacement difference and were in a stable status. A good technological, economic and social benefit was achieved.
出处 《西安科技学院学报》 北大核心 2004年第1期28-30,共3页
关键词 锚杆支护 大倾角煤层 部分留顶煤 bolting big inclined coal seam remain partial upper coal
  • 相关文献

参考文献2

二级参考文献4

  • 1鞠文君.锚杆支护巷道顶板离层机理与监测[J].煤炭学报,2000,25(z1):58-61. 被引量:91
  • 2孔恒.岩体锚固系统的机理及新技术研究(学位论文)[M].中国矿业大学(北京校区),2000..
  • 3王明恕.全长锚固锚杆机理的探讨[J].煤炭学报,1983,(1).
  • 4(英)A.哈依斯 Mining Technology.岩层控制技术的发展现状.国外锚杆支护技术译文集[M].煤炭科学研究总院北京开采所,1997,6..

共引文献27

同被引文献2

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部