摘要
本文简要叙述了南方某高速公路K14 1+30 0处高边坡的不良地质情况 ,介绍了该边坡的动态加固措施 ,重点叙述了新型压力分散型预应力锚索加固边坡的机理和施工工艺。
The article describes facility the complex geological formation of high-slope in some expressway in south at station k141+300,also introduces the dynanic reinforcement methode of the slope,especially describes the construction technics and for slope rei-nforcement with the new type prestressed cable of distributed load of pressure.
出处
《辽宁省交通高等专科学校学报》
2004年第1期28-30,共3页
Journal of Liaoning Provincial College of Communications
关键词
动态加固
预应力锚索
差异分步张拉
Dyramic reinforcement
prestressed cable for distributed load of pressure
Differenlc-tension step by step