In view of the problems existed in the original load-unload mechanism in skip of main shaft, a improved scheme is put forward. The principle and structural features of the new system are introduced.
In view of the problems existed in the original load-unload mechanism in skip of
main shaft, a improved scheme is put forward. The principle and structural feat
ures of the new system are introduced.
出处
《矿山机械》
北大核心
2004年第3期46-47,共2页
Mining & Processing Equipment