摘要
本文详细叙述了大跨度桥的顶进施工方案 ,着重强调了线路加固技术 ,制定了切实可行的安全保证措施 ,对框构顶力进行了计算 ,对后前背工程和线路加固进行了检算。
The introduction is given in details in this text about the jacking work method of large span bridge,it emphasizes the consolidation technology of the railway line,the practical guarantee measures for safety assurance is worked out,the calculation is made for the jacking force of the framed structure,and the inspection and calculation is also made for the front and rear works and the railway line consolidation works.
出处
《铁道工程学报》
EI
2004年第1期80-86,共7页
Journal of Railway Engineering Society