摘要
以因资源供给不足而造成工程延误的总损失额最小为目标,建立了以微小时间间隔为分析基础的资源分配数学规划模型, 并讨论了其具体应用及求解方法。
Under the condition of multi-projects construction and its resources-supply changing with time, a non-linear planning model for resources distribution based on small time intervals is suggested. Its usage and solving method is also discussed through an example.
出处
《工程建设与设计》
2004年第2期42-44,共3页
Construction & Design for Engineering
关键词
资源
分配
非线性规划
resource
distribution
nonlinear planning