期刊文献+

水电站引水发电系统过渡过程整体物理模型试验探讨 被引量:17

Study on the physical simulation of transient process in conduits of hydropower stations
在线阅读 下载PDF
导出
摘要 水电站引水发电系统过渡过程是流体、机械、电气、甚至结构相互耦合的复杂的动态过程 ,现有的将水、机、电分开研究的方法及成果无法满足大型长输水道地下式水电站设计和运行的需要 ,所以需要开展水电站过渡过程整体性物理模拟。本文作为初步的探讨 ,着重介绍模型比尺、水机电整体模拟、控制测试以及大波动、小波动和水力干扰等过渡过程的试验结果 。 The transient process in the conduits of hydropower stations is a very complicated dynamic procedure coupled with fluid,machines,electricity,and even structure.The current methods used to analyze them separately cannot satisfy the design and the operation requirements of those large underground stations with long conduits.So it is necessary to develop a global physical simulation for the power station transients.As an initial discuss,this paper focuses on the introduction of model scale of similarity,integral simulation with fluid,machines and electricity,transients control and measurement,and some experimental results about great fluctuation,small fluctuation and hydraulic interference in transient process.The comparison of experimental and computational results is presented in this paper.
出处 《水力发电学报》 EI CSCD 北大核心 2004年第1期57-63,共7页 Journal of Hydroelectric Engineering
关键词 水电站 过渡过程 相似律 模型比尺 整体模型试验 hydropower station transient process similarity model scale ratio integral model test
  • 相关文献

参考文献1

  • 1ГИ克里夫琴科常兆堂等译.水电站动力装置中的过渡过程[M].北京:水利出版社,1981年..

同被引文献95

引证文献17

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部