茂名炼油厂在新陈2#气柜的施工建设中,对施工危险性进行详细分析,提出了安全对策,采用3#气柜不停产的情况下进行,确保了施工安全.
Some safety measures were adopted based on detail risk analysis in construction of No.2 new air tank of Maoming Reefing Plant. Construction safety was ensured at the meantime No.3 air tank is operating.