摘要
通过对溢流堰堰面砼施工中几种模板方案的综合考虑,下会坑水库采用了滑模与常规立模相结合的小模板依次上翻的施工方案,较好地完成了堰面施工任务,既节省了材料,又加快了施工进度,而且保证了堰面的施工质量.
Based on comparing several form plans of the weir surface concrete construction of the spillway weir on Xiehuiken reservoir,the construction scheme of overseting the small form by the relevent sequence which is that the common moulding is combined with the sliding formwork was adopted.The task had been finished better.It saved the materials and make the constraction progress fast.The product quality is also good.