期刊文献+

矿井主采运系统的可靠性及其生产能力的确定 被引量:5

THE RELIABILITY AND THE DETERMINATION OF THE PRODUCTION ABILITY OF THE MAIN SYSTEM OF EXTRACTION, CONVEYANCE AND HOISTING OF MINES
在线阅读 下载PDF
导出
摘要 本文建立了主采运系统的可靠性教学模型和求其可用度的模拟模型,着重定量分析了煤仓对提高系统可靠性的作用。此模型可用于现有主采运系统的分析以找出系统的薄弱环节,并通过提出改进措施及其效果预测,为矿井技术改造提供依据,图6,表5,参3。 This paper sets up the mathematical model in reliability of the main system of extraction, conveyance and hoisting and the simulation model of evaluating its reliability, and places emphasis on the quantitative analysis of the mining bunkers' effect in improving the reliability of the system. The models are used for the study of the present main system of extraction, conveyance and hoisting in order to provide bases for the technology improvements of mines by seeking the weak units of the system, putting forward the measures to improve the system and forecasting their effects. 6figs, Stabs, 3refs.
出处 《湘潭矿业学院学报》 1992年第1期7-16,共10页 Journal of Xiangtan Mining Institute
关键词 主采运系统 可靠性 生产力 模拟 the main system of extraction, conveyance and hoisting reliability production ability computer simulation
  • 相关文献

参考文献1

共引文献3

同被引文献17

引证文献5

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部