摘要
介绍了正在施工的位于珠江三角洲地区的广东省新沙大桥的桩基施工,分析了桩基抽取的混凝土芯样的强度低于取样的试件强度的原因及采取的处理措施。
Discussion is made on the stake base construction on Xinsha Bridge located in Zhujiang Delta in Guangdong province. Analysis is made on the formation of why the strength of the core concrete base extracted from the stake is inferior to that of the sample.
出处
《交通科技与经济》
2004年第1期14-15,23,共3页
Technology & Economy in Areas of Communications
关键词
桩基施工
强度
处理措施
桥梁
stake base construction
strength
countermeasurex