摘要
以上海外环沉管隧道江中最终接头施工为工程背景,对“止水板式”的最终接头的原理进行说明,对最终接头的流程及工艺进行介绍,最后分析最终接头施工过程中遇到的问题。
The final joint is the key part of immersed tube tunnel.Based on the underwater final joint of Shanghai Outer\|ring immersed tube tunnel project,the principle of 'closure panel' final joint is briefed in this paper.In addition,the program and technique of this final joint are introduced.Finally the difficulties met in the construction of this final joint are analyzed.