摘要
文章结合合 (肥 )裕 (溪口 )航道入江口裁弯取直工程 。
The paper gives a comprehensive analysis of the influence of the curve cutoff works, which was intended to straighten the Hefei-Yuxikou Waterway entering the Yangtze River Estuary, upon the Yangtze River Levee.
出处
《中国港湾建设》
北大核心
2003年第6期27-28,共2页
China Harbour Engineering
关键词
合裕航道
裁弯取直
长江大堤
分析
Hefei-Yuxikou Waterway
cutoff works
Yangtze River Levee
analysis