新桥水库工程泥沙设计中的几个问题 被引量:2

Several problems to the sedimentation engineering design for the Xinqiao reservoir
在线阅读 下载PDF
导出
摘要 实践经验表明,水库工程泥沙设计的关键在于合理确定泄洪排沙洞的进口高程、洞径及其平面位置。本文对陕北红柳河流域新桥水库泄洪排沙洞设计中的几个关键性问题进行了探讨,并给出了适合北方多沙河流上中小型水库泄洪排沙洞泄流曲线的计算方法。 It is showed that the appropriate design for inlet elevation, diameter and planar situation of a flood discharge tunnel is the key to the sedimentation engineering design for a reservoir. Several key problems are discussed in the paper on the design of the flood discharge tunnel of XinQiao reservoir in the basin of Hongliu River basin North Shaanxi Province. And a method is suggested for calculating the discharging curve of the flood discharge tunnel for middle or small scale reservoir on the sedimental river in North China.The method has much value for project designers.
出处 《西北水力发电》 2003年第4期12-14,共3页 Journal of Northwest Hydroelectric Power
关键词 水库泥沙 造床流量 平衡比降 reservoir sediment discharge for forming riverbed equilibrium slope
  • 相关文献

参考文献3

  • 1陕西省水利科学研究所河渠研究室 清华大学水利工程系泥沙研究室.水库泥沙[M].北京:水利电力出版社,1978..
  • 2武汉水利电力学院水力学教研室.水力计算手册[M].北京:水利出版社,1979..
  • 3吴持恭.水力学[M].北京:高等教育出版社,1984..