三峡水库135m蓄水过程分析 被引量:8

Analysis on the impoundment process of Three Gorges Reservoir up to EL.135 m
在线阅读 下载PDF
导出
摘要 三峡水库135m蓄水是逐步发挥三峡工程综合效益,保证三期工程顺利施工的关键。2003年6月10日22时三峡水库如期蓄水至135m,标志着三峡工程进入了建设施工与生产运行并重的崭新阶段。为此,就135m蓄水对坝址上游、两坝间、葛洲坝下游水位变化的影响,蓄水期间三峡泄水建筑物的逐步启用,蓄水后水库回水末端的确定,梯级枢纽形成后水库调度中存在的问题等进行了较为详细的分析,从而为梯级水库调度和后期三峡工程的156、175m蓄水提供借鉴。 The water impoundment of Three Gorges Reservoir up to EL.135 m is the key to give play to the comprehensive benefits of the Project and to guarantee the smooth construction of the third-phase works of the Three Gorges Project. At 22:00 June 10,2003, the water level of Three Gorges Reservoir reached up to EL.135 m, just on time as predicted, indicating that the Project has entered a new stage that both construction and production operation are of importance. This article analyzes in detail the problems such as the influence to the upstream, stream between two dams, lower stream of Gezhouba Project, the gradually use of discharge sluices during the impoundment process, the determination of the backwater end, the possible problems in the reservoir dispatching after the completion of cascade water control projects. It also can be taken as use for reference of cascade reservoir dispatching and the water impoundment of Three Gorges Project up to EL.156 m or EL.175 m.
出处 《水力发电》 北大核心 2003年第12期19-21,共3页 Water Power
关键词 水库调度 三峡水库 蓄水 坝址 梯级水库 initial impoundment, process analysis, reservoir dispatching, Three Gorges Reservoir
  • 相关文献

同被引文献81

引证文献8

二级引证文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部