摘要
该文将龙—政直流系统双极系统调试情况汇总,主要介绍了极I系统调试、极I试运行及极 直流系统、双极直流系统的调试情况,以供大家参考。
The commissioning of Pole 1 and Pole 2 of Long-Zheng HVDC System was introduced.It provided a useful reference for other HVDC system such as Three Gorges-Guangdong HVDC System,Lingbo back-to-back HVDC System,etc.
出处
《湖北电力》
2003年第B12期43-47,共5页
Hubei Electric Power
关键词
龙泉换流站
直流系统
调试
直流输电工程
Long-zheng HVDC system
system commissioning
converter station