摘要
通过对大梁水库基础回填施工中存在的问题及回填土料物理力学性能的分析,提出了通过调整施工参数(降低填筑土料含水量下限到13%)即能满足设计要求的可能性。
Through the analysis on the problems existing in the backfill construction of main dam foundation of Daliang Reservoir and the physical- mechanical properties of the backfill, this paper puts forward the possibility that the dsign requirements can be satisfied only through adjusting the construction parameters (reducing the lower limit of the moisture of the backfill to 13 % ).
出处
《科技情报开发与经济》
2003年第12期160-161,共2页
Sci-Tech Information Development & Economy
关键词
大坝基础
回填
含水量
施工参数
dam foundation
backfill
moisture
construction parameter