文章分析了秦岭终南山隧道施工中对环境影响的主要因素 ,并提出了相应的施工环保对策 。
In this paper the primary factors affecting the environment during the construction of Zhongnanshan extra-long tunnel are analyzed, and the countermeasures against environmental impact are put forward, which can be taken as a reference for the construction of extra-long tunnels.
出处
《现代隧道技术》
EI
2003年第6期31-33,38,共4页
Modern Tunnelling Technology
关键词
特长隧道
环境保护
施工措施
Extra-long tunnel
Environmental protection
Construction method.