期刊文献+

生产调度问题的模糊满意优化 被引量:3

A Fuzzy Satisfactory Optimization Method for Production Scheduling
在线阅读 下载PDF
导出
摘要 研究了生产调度的模糊多目标优化问题.分析了生产调度问题中的优化目标和系统约束的模糊性,分别定义了其模糊满意度,形成了一类具有模糊目标和模糊约束的多目标优化模型,运用模糊优化算法进行求解.对一算例进行了仿真研究,验证了该算法的有效性. A fuzzy optimization for production scheduling was investigated. The fuzziness of the optimal goals and systems constraints in the production scheduling were analyzed, and the fuzzy goals and fuzzy constraints were translated into an optimization problem by defining a fuzzy satisfying degree to the optimization objective. The use of fuzzy goals and fuzzy constraints in the production scheduling allows for a more flexible aggregation, hence, a kind of multiobjective optimization with fuzzy goals and fuzzy constraints is formulated and some fuzzy optimization algorithm can be used to find the fuzzy satisfying solution.The simulation results show that the algorithm is effective.
作者 尤军 李少远
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2003年第11期1698-1701,共4页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(60074004)
关键词 生产调度 模糊优化 满意度 多目标优化 production scheduling fuzzy optimization satisfactory degree multi-objective optimization
  • 相关文献

参考文献5

二级参考文献25

  • 1张化光,吕剑虹,陈来九.模糊广义预测控制及其应用[J].自动化学报,1993,19(1):9-17. 被引量:41
  • 2席裕庚.复杂工业过程的满意控制[J].信息与控制,1995,24(1):14-20. 被引量:47
  • 3李小文,高峰,王锦地,朱启疆.遥感反演中参数的不确定性与敏感性矩阵[J].遥感学报,1997,1(1):5-14. 被引量:59
  • 4陈浩然 王震鸣 等.层合复合材料低速冲击损伤研究.复合材料及其结构的力学、设计应用和评价:第2册[M].哈尔滨:哈尔滨工业大学出版社,1998.96-111.
  • 5李思简 王震鸣 等.层压板壳分层屈曲破坏的二维模型分析.复合材料及其结构的力学、设计应用和评价:第1册[M].北京:北京大学出版社,1998.34-52.
  • 6王荣鑫.随机过程[M].西安:西安交通大学出版社,1987.16-17.
  • 7Heng Li. Genetic search for solving construction sitelevel unequal-area facility layout problems [J]. Automation in Construction, 2000,9 (2) : 217-- 226.
  • 8Mak K L. A genetic algorithm for facility layout problems [ J]. Integrated Manufaeturng Systems,1998,11(5):113--127.
  • 9Grefenstrette J J. Optimazition of control parameters for genetic algorithm. IEEE Transaction on SMC,1986, 10(3) : 103-- 123.
  • 10Chan K C, Tansi H A. Study of genetic crossover operation on the facility layout problem[J]. Computer & Industrial Engineering, 1994,26(3) : 108-- 121.

共引文献52

同被引文献9

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部