工程管理中投资和进度控制的集成模型研究 被引量:8

Research on Cost and Time Control Integration Model in Project Management
在线阅读 下载PDF
导出
摘要 本文从技术、组织两个角度对费用和进度控制的集成进行了研究,提出了费用和进度子系统的集成模型──工作包模型;并且用关系数据库来描述工程数据间的相互关系,实现数据的存储和操作。论文最后讨论了组织分解结构与工作包模型的数据关系,以便真正实现项目信息共享和对称。 The paper discusses integration of cost control and time control in respect of technology and organization. Work Packages Model is proposed in which cost control and time control has a common data model-Revised Work Breakdown System. It describes the relationship between project data with Relational Model.Relational Database supplies storing and manipulating data mechanism.Finally, the paper discusses organization structure which is related to Work Packages Model's structure in order to obtain symmeny and sharing of project information.
作者 董春山
出处 《计算机辅助工程》 2000年第2期67-73,共7页 Computer Aided Engineering
  • 相关文献

参考文献3

  • 11,William J.Rasdorf andOsama Y.Abudayych. Cost- and Schedule-Control Integration: Issues and Needes. Journal ofConstruction Engineering and Management, 4, ASCE , 486-500,1990
  • 22,Neil,J.M.A System for Integrated Project Management.Proc.Conf.on Current Practice inCost Estimating and Const Control,ASCE,138-146,1983
  • 33,Bernold,L.E.Bar Code-driven Equipment and Material Tracking for Construction. Journalof Computer in Civil Engineering,4,ASCE, 381-395,1990

同被引文献58

引证文献8

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部