龙滩水电站导流设计与施工 被引量:6

Diversion design and construction of Longtan Hydropower Station
在线阅读 下载PDF
导出
摘要 龙滩水电站施工导流具有导流洞规模大、运行条件复杂、RCC围堰高等特点。其导流洞为国内目前已建和在建工程中断面最大的有压导流洞,也是封堵期水头最高的导流洞,其RCC围堰最大高度达82 7m。龙滩水电站采用隧洞导流方式,分初期导流、施工期坝体临时拦洪和初期发电3个阶段。截流时,导流设计洪水标准为20年一遇洪水,围堰挡水标准为10年一遇洪水。导流洞开挖分三层施工,每层高约8~10m。左右岸导流洞均已通过验收,具备过流条件,河床截流可按期进行。 The construction diversion of Longtan Hydropower Station is large in diversion tunnel scale, complicated in operation conditions, and high in cofferdam Its diversion tunnel is the largest section pressured tunnel in the built and under build projects at home at present, with the highest water head during its blockage period The maximum height of the cofferdam is 82 7 m The tunnel diversion is divided into three periods of first stage diversion, provisional flood retaining during construction period and initial power generation When the river is closed, the diversion design flood standard is 20 year flood and the cofferdam water retaining standard is 10 year flood The diversion tunnel is excavated by three layers with the height of about 8~10 meters each The right and left diversion tunnels were checked and accepted The river closure can be carried out on schedule
作者 宋亦农 周洁
出处 《水力发电》 北大核心 2003年第10期51-53,共3页 Water Power
关键词 导流设计 隧洞导流 围堰 龙滩水电站 diversion design, tunnel diversion, cofferdam, Longtan Hydropower Station
  • 相关文献

同被引文献20

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部