高速铁路软土路基工后沉降试验研究 被引量:46

Experimental Study on Soft Soil Settlement of High-speed Railway Subgrade after Construction
在线阅读 下载PDF
导出
摘要 高速铁路对路基的工后沉降提出了严格的要求 ,而现有的软土地基沉降计算方法难以满足设计要求 .通过对软土厚度 10m、路基长度 6 5m和高度 4 .5m的路基原位试验 ,分析了塑料排水板处理软土、堆载预压对地基工后沉降的影响 . Settlement of high-speed railway subgrade after construction is strictly limited,but settlement calculation methods of soft soil are not satisfactory for design.In-situ test of subgrade with thickness of 10 m soft soil ground,length of 65 m and height of 4.5 m is studied.Soil settlement after construction by using prefabricated strip drains and preloading method is analysed.This will provide a basis for the design of high-speed railway subgrade on soft soil.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2003年第10期1163-1167,共5页 Journal of Tongji University:Natural Science
基金 铁道部科技发展基金资助项目 (99G2 8)
关键词 高速铁路 软土地基 原位试验 工后沉降 high-speed railway soft soil ground in-situ test settlement after construction
  • 相关文献

参考文献5

  • 1曹新文,蔡英,苏谦.高速铁路路基变形控制值的研究[J].路基工程,1998(2):38-41. 被引量:11
  • 2..铁建设[2003]13号,京沪高速铁路设计暂行规定[S].,..
  • 3.CTAG02-97.塑料排水带地基设计规程[S].,..
  • 4.CTAG02--97.塑料排水带地基设计规程[S].,..
  • 5.铁建设[2003]13号.京沪高速铁路设计暂行规定[S].,..

共引文献10

同被引文献293

引证文献46

二级引证文献191

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部