摘要
潮州市第一污水处理厂建设规模 8万m3/d ,采用厌氧 好氧氧化沟工艺 ;简述了各工艺构筑物的设备配置、设计参数、自动控制及试运行情况等 ,并总结了设计特点和运行体会。
The 1st Wastewater Treatment Plant in Chaozhou City has a designed treatment capacity of 80 000 m 3/d. A/O (anaerobic aerobic) Pasveer oxidation ditch is applied in it. The general situations of this project including the configuration and design parameters of the treatment structures, the trial run and automatic control are presented in this paper. Some particularities of equipment configuration are described and the experience of design and operation is also discussed.
出处
《给水排水》
CSCD
北大核心
2003年第10期12-15,共4页
Water & Wastewater Engineering