摘要
介绍了六家煤矿在回采巷道实施锚网支护的试验过程 ,总结了经验。
The test of bolting with wire mesh at actual mining road in Liujia Coal Mine is introduced. The reviewed experience is a theorical and practical basis of bolting with wire mesh for the similar road conditions.
出处
《煤炭技术》
CAS
2003年第10期42-44,共3页
Coal Technology