对宣钢供电系统110kV变电站35kV高压系统边运行边施工改造经验进行了分析探讨,指出选用优良的设备、制定周密的安全措施,能够确保施工、运行安全。
The experience to reform the 35kV high-voltage system of 110kVA substation of Xuan Steel without stopping operation is analyzed and discussed, it is pointed out that safe construction and operation can be guaranteed if superior device selected and well-conceived safe measures carried out.