期刊文献+

漳泽电厂670t/h锅炉三次风管烧红和一次风管堵粉的原因及改进措施 被引量:1

CAUSES FOR BURNING-RED OF TERTIARY AIR DUCT AND COAL-BLOCKING OF PRIMARY AIR DUCT AND THEIR IMPROVEMENT ON A 670t/h BOILER OF ZHANGZE POWER PLANT
在线阅读 下载PDF
导出
摘要 对漳泽电厂670t/h锅炉运行过程中三次风管烧红和一次风管堵粉燃烧的事故进行了介绍与分析,认为其发生原因是由于双炉膛之间压力不平衡、三次风喷口冷却方式不当,以及给粉机特性不良所致。通过改进三次风管冷却方式与对给粉机特性进行调整,使上述问题得到较好的解决,提高了锅炉运行的安全经济性。 This paper introduces briefly the phenomena, encountered by the 670t/h boiler of Zhangze Power Plant in its operation, that the tertiary air duct was burned red and the primary air duct was blocked by coal. It is found through analysts that these were caused by the pressure difference in twin furnaces, the improper cooling (?)iary air port and the poor performance of coal feeder. Better economic and safe operation of the boil(?)ere obtaired (?) imp(?)vements, s(?)ch as the change of cooling method of (?) air port and adjustment of coal feeder.
出处 《热力发电》 CAS 北大核心 1992年第6期47-53,共7页 Thermal Power Generation
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部